Quick Answer
For permit or zoning questions, call the Building Permit Coordinator at 305-899-8000 or email [email protected]. Public hours, checked November 23, 2026, are Monday through Thursday, 9 a.m. to 1 p.m. and 2 to 5 p.m., and Friday, 9 a.m. to noon. To request an inspection, email [email protected] by 4 p.m. the day before the requested visit.
The Village of Biscayne Park Building Department is at Village Hall, 600 NE 114th Street, Biscayne Park, FL 33161. Submit building permit applications online through CAP GeoCivix at https://cap.geocivix.com/secure/.
Where Can I Verify the Official Requirements?
- Contact the Village Building Department
- Open CAP GeoCivix to file or check a building permit
- Get the Biscayne Park permit application and forms
- Choose a Village checklist by project type
- Village Master Fee Schedule linked from Building Department Forms
- Village Hall contact details and public hours · checked November 23, 2026
- Miami-Dade Property Appraiser municipal folio codes
- Miami-Dade County guidance on municipal and county review
- CAP account registration and inspection requests
- Village instructions for uploading and revising plans
- Planning and Design Review Board
- Village checklist for new construction and additions
- Village checklist for windows, doors and shutters
- Village Land Development Code roof provisions
- Miami-Dade flood maps and parcel lookup
- FEMA final flood hazard determinations for Miami-Dade and incorporated areas
- FEMA Community Rating System roster · April 2025
- Miami-Dade County floodplain manager directory and mitigation plan
- Village flood insurance and substantial improvement guidance
- Florida Building Commission current code effective date
- Florida Building Commission upcoming code effective date
- Florida Building Commission on the High Velocity Hurricane Zone
- Village permit system FAQ and review status
- Village outdoor storage and shed requirements
- Village permit menu and garage sale application
- Earlier Village addition checklist with review estimate
- Village Commission fee schedule exhibit · June 18 agenda
Check the municipal code on the property folio
Look up the job address in the Miami-Dade Property Appraiser’s Property Search and read the first two digits of the folio.
A Biscayne Park parcel starts with 17. Across the Village line, 06 identifies North Miami and 11 identifies Miami Shores. El Portal uses 18. A folio beginning with 30 falls under the County’s unincorporated permitting jurisdiction.
Miami-Dade can still review parts of a municipal application, including water and sewer or environmental approvals.
If an addition involves a utility connection, ask the coordinator which county approvals to track alongside the Village permit.
Sources: [7] Miami-Dade Property Appraiser municipal folio codes; [8] Miami-Dade County guidance on municipal and county review; [1] Contact the Village Building Department
Choose the checklist before opening a CAP application
On the Village’s Building, Permits, & Zoning page, open Building Permit(s) Checklist for the work you plan to do.
The index has separate entries for interior alterations, fences, driveways, roofing, windows and doors. Then open Building Department Forms for the permit application and its attachments. For a driveway, use the driveway detail packet and requirements. The general lot coverage form excludes driveways.
The Village calls for full plans and approval before work starts.
Its permit list includes electrical, plumbing and mechanical work, roofing, pools and fences. Ask the coordinator about exceptions for the proposed scope and check the contractor’s license and insurance.
Register in CAP for a new project. For an existing permit, link the permit to the account before uploading more documents.
Village Hall takes questions in person, but permit documents go through CAP. The Village’s illustrated upload instructions use El Portal as an example. Match the CAP application to the municipality on the folio.
Upload a complete multi-page PDF for each discipline. Give the file a descriptive name such as “Structural” and use the matching upload line.
Group the product approvals in their own multi-page PDF. The upload guide calls for verifiable digital signatures on survey documents and on documents signed by an architect or engineer.
Sources: [1] Contact the Village Building Department; [3] Get the Biscayne Park permit application and forms; [4] Choose a Village checklist by project type; [9] CAP account registration and inspection requests; [10] Village instructions for uploading and revising plans; [7] Miami-Dade Property Appraiser municipal folio codes
Put an addition on the Planning and Design Review Board agenda
For an addition, assemble the survey, completed and notarized permit application and the Village calculation showing pervious and impervious areas.
If the survey is more than six months old, the checklist calls for a signed, notarized survey affidavit. Use the proposed footprint to calculate how much of the lot will remain pervious after the addition.
Biscayne Park requires Board approval for additions and new construction.
The Board lists regular meetings on the first and third Mondays at 6:30 p.m. The addition checklist sets the filing deadline one week before the meeting and lists a $50 upfront agenda fee. Ask the coordinator for the next available agenda and the meeting location. For a new building, allow for two preliminary Board reviews followed by a final review.
Mechanical, electrical, roofing and plumbing subpermits for the addition are linked to the master permit and invoiced separately.
Keep the master permit number with the drawings supplied to each trade so a contractor can identify the addition when filing.
Sources: [11] Planning and Design Review Board; [12] Village checklist for new construction and additions; [3] Get the Biscayne Park permit application and forms
Read the fee schedule by project type
Open Master Fee Schedule on the Village forms page. The building permit has a $130 minimum base fee.
The schedule lists new single-family or duplex construction and additions at $12 per square foot plus review fees. Alterations to those buildings are $6 per square foot plus review fees. If an addition includes remodeling the existing house, separate the two areas when asking for a fee estimate. The Village prices remodeling separately.
For replacement openings, count the windows and glass doors separately.
The schedule lists $40 per window and $60 per glass door, plus review fees. Use the counts from the window schedule when asking the coordinator for the total.
Sources: [1] Contact the Village Building Department; [3] Get the Biscayne Park permit application and forms; [5] Village Master Fee Schedule linked from Building Department Forms; [27] Village Commission fee schedule exhibit · June 18 agenda; [12] Village checklist for new construction and additions
Respond to review comments and arrange the inspection
The Village sends discipline comments by email and asks applicants to upload both their responses and the corrected plans.
If a structural sheet changes, upload the complete revised structural set over the rejected file. The Village says its staff cannot insert individual sheets. The Building Official gives final approval.
After approval, the Village lists one to two business days to generate the invoice.
The Building Coordinator then contacts the applicant for payment. Once the permit is issued, download the CAP-approved drawings for the crew and inspector. For a window project, the checklist identifies window buck, attachment and final building inspections. Before covering the opening, ask which inspection is next and email the Village’s inspection mailbox by its day-before cutoff.
Sources: [10] Village instructions for uploading and revising plans; [9] CAP account registration and inspection requests; [13] Village checklist for windows, doors and shutters; [23] Village permit system FAQ and review status
Match replacement windows to their product approvals
For a Biscayne Park window replacement in Miami-Dade’s High Velocity Hurricane Zone, the Village asks for a plan locating each opening and identifying its size and product type.
Match that plan to the product schedule and opening wind pressures. Mark the selected elements in the current Miami-Dade Notice of Acceptance or Florida Product Approval so the reviewer can find the proposed assembly.
Biscayne Park window applications filed now fall under the Florida Building Code, 8th Edition (2023), effective December 31, 2023.
For a filing at year-end, the 9th Edition (2026) takes effect December 31, 2026.
Sources: [13] Village checklist for windows, doors and shutters; [20] Florida Building Commission current code effective date; [21] Florida Building Commission upcoming code effective date; [22] Florida Building Commission on the High Velocity Hurricane Zone
Which flood map applies to the site plan?
For an addition, check the parcel against Miami-Dade’s effective September 11, 2009 flood maps.
FEMA lists Biscayne Park Village Hall as the map repository for the replacement maps effective February 19, 2027. The county floodplain directory identifies the Village’s contracted Building Official as the local contact. Ask which panel and elevation to show on the site plan for the filing date. FEMA’s April 2025 Community Rating System roster lists Biscayne Park under community 120638, Class 10.
For improvements in a flood hazard area, ask the Building Official how to document the building value.
Village guidance says that when improvement costs reach 50% of the building’s market value, new-construction flood requirements apply.
Sources: [15] Miami-Dade flood maps and parcel lookup; [16] FEMA final flood hazard determinations for Miami-Dade and incorporated areas; [17] FEMA Community Rating System roster · April 2025; [18] Miami-Dade County floodplain manager directory and mitigation plan; [19] Village flood insurance and substantial improvement guidance
Drawings for a Biscayne Park addition
Pineland Engineering can use the Biscayne Park survey and lot coverage form to prepare a site plan that shows where the addition meets the existing house.
Pineland can coordinate that footprint with architectural and structural drawings and organize the sheets by discipline for CAP. If the Board asks to change the footprint, send Pineland the comments and the version the Board reviewed so the site plan and affected drawing sets can be revised together.
Sources: [12] Village checklist for new construction and additions; [10] Village instructions for uploading and revising plans
Free Florida Engineering Tools
Related Resources
What Do People Ask About Biscayne Park Building Department?
Is Key Biscayne served by the Biscayne Park Building Department?
No. Miami-Dade assigns folio prefix 24 to Key Biscayne and 17 to Biscayne Park. Use the Biscayne Park CAP application for a property with the 17 prefix.
How big can a storage shed be in Biscayne Park, and does it need a permit?
The Village limits storage sheds to 100 square feet. Even at or below that size, the owner needs a permit before installation.
Does repainting a Biscayne Park house need zoning approval?
For an exterior color outside the Village’s pre-approved selection, submit the Paint Approval Form with three color swatches for zoning approval. Village Hall has the pre-approved colors that are exempt from that approval.
Can an existing asphalt shingle roof be replaced with shingles?
Village Land Development Code § 10.4.6(f) allows that replacement if a Florida-licensed structural engineer inspects the structure in person and finds it inadequate for tile. The engineer of record must include photographs and present the report to the Planning and Design Review Board. The code also excludes three-tab shingles.
How long does Biscayne Park permit review take?
The Village reviews applications in arrival order. An older addition checklist gives an estimate of up to two months depending on responses to comments. The electronic checklist ties approval to how quickly and accurately designers respond. For a current estimate, check the file in CAP and ask the coordinator about any outstanding Board or trade review.
Does Biscayne Park use CAP for a garage sale permit?
The Village requires a permit and limits the number of garage sales per year. Choose Garage Sale Permit Application on the Village’s Apply for a Permit page. It opens in GoGov. Construction permits go through CAP.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.