Quick Answer
For a permit question, call 954-434-4300, option 4, or email [email protected]. To find an application, use the Cooper City Accela Citizen Access portal and choose Building, then Search Applications. The city also uses Accela to take applications, collect payments and schedule inspections.
Call 954-434-4300 and choose option 4 for Cooper City’s Building Division, part of the Community Development Department. The walk-in permit counter is inside City Hall at 9090 SW 50 Place, Cooper City, FL 33328, and its regular hours are Monday through Friday, 7:30 AM to 3:30 PM.
Where Can I Verify the Official Requirements?
- Visit the Cooper City Building Division
- Open Cooper City Accela to apply, look up a permit or schedule an inspection
- Choose a Cooper City permit form or project checklist
- Building Division fee tables, counter hours and account instructions (city website data)
- Broward County and municipal permit contacts
- Broward County building department directory
- Cooper City building permit application checklist
- Cooper City residential addition checklist
- Cooper City accessory building permit package
- Florida Statutes § 553.792 — decisions on complete applications
- Cooper City inspection preparation and trade schedules
- Inspection windows and instructions (city website data)
- Cooper City change-of-use checklist
- Cooper City certificate of occupancy checklist
- Cooper City flood map and elevation certificate contacts (city website data)
- Cooper City Commission minutes approving Ordinance 24-12
- FEMA Community Status Book entry for Cooper City
- Broward County Board of Rules and Appeals — hurricane zone
- Florida Building Commission — current code effective date
- Florida Building Commission — next edition effective date
- Cooper City electronic submittal instructions referencing the former property search (city website data)
- Cooper City Commission decision on private-provider fee reductions
Which office handles the property?
Cooper City takes municipal building applications for addresses within its city limits.
Near the Davie or Pembroke Pines boundary, use the Broward County Property Appraiser link on Cooper City’s Accela home page to identify the municipality before opening a permit. Davie and Pembroke Pines each have a building office. An address in unincorporated Broward falls under the county’s Building Code Division. Counter and portal information checked November 23, 2026.
Sources: [1] Visit the Cooper City Building Division; [2] Open Cooper City Accela to apply, look up a permit or schedule an inspection; [5] Broward County and municipal permit contacts; [6] Broward County building department directory; [4] Building Division fee tables, counter hours and account instructions (city website data)
Start a Cooper City permit in Accela
On the portal home page, open Building Applications and Forms.
Cooper City directs applicants to the 2025 Broward County Unified Building Permit Application. Choose the city checklist that describes the work as well. For a contractor filing online, the next steps are to register an Accela account and add the contractor license to that account. For an owner-builder application, plan a visit to the counter for the affidavit.
Cooper City’s separate Electronic Building Permit Submittal page describes a single PDF named for the job address and links to an older property search.
It also lists a resubmittal form for revisions and in-person delivery for certain plans. Start with the Building Division’s current Accela link and confirm how to deliver the plan files for the selected permit. If the project also needs Broward Development and Environmental Review, that submission goes through the county’s ePermits OneStop. The city permit record stays in Cooper City’s system.
Sources: [2] Open Cooper City Accela to apply, look up a permit or schedule an inspection; [3] Choose a Cooper City permit form or project checklist; [4] Building Division fee tables, counter hours and account instructions (city website data); [7] Cooper City building permit application checklist; [21] Cooper City electronic submittal instructions referencing the former property search (city website data)
What goes into a residential addition application?
Use the survey to locate the proposed addition on the lot. Cooper City’s Residential Addition Checklist asks for the site plan, setbacks and proposed first-floor elevation.
On the structural sheets, identify the design pressures at openings and at the roof, along with the truss loads. The checklist also calls for structural calculations, energy calculations and product approvals. Check the trade applications against the scope, including roofing, electrical, mechanical and plumbing work.
For the code edition entry on the addition checklist, Cooper City currently reviews applications under the Florida Building Code, 8th Edition (2023), effective December 31, 2023.
For applicants planning a later filing, the 9th Edition (2026) takes effect December 31, 2026. Broward County, including Cooper City, is in the High-Velocity Hurricane Zone. Match the opening pressures on the drawings to the product approvals for the windows or doors being proposed.
Sources: [8] Cooper City residential addition checklist; [18] Broward County Board of Rules and Appeals — hurricane zone; [19] Florida Building Commission — current code effective date; [20] Florida Building Commission — next edition effective date; [4] Building Division fee tables, counter hours and account instructions (city website data)
How Cooper City calculates permit fees
The application fee is due when filing and counts toward the final permit charge.
For general construction, Cooper City’s posted table lists $139 for costs up to $2,500 per structure per trade. The listed rates are 3% for costs over $2,500 through $2 million, 2.5% for costs over $2 million through $5 million, and 2% above $5 million. Give the counter the overall construction value and the value of each trade when asking for an estimate.
Some permits have their own rates. For windows or shutters, count the openings.
The schedule lists $139 for the first and $12 for each additional opening. A residential water heater change-out is listed at $50 and a residential A/C change-out at $139. The residential roof permit line shows a $278 minimum and a $500 maximum. The city lists state and county charges separately and provides for an annual fee adjustment, so confirm the total for the project before paying.
When a licensed private provider handles only plan review or only inspections, Cooper City lists a 25% reduction in the applicable permit fee.
When the provider handles both, the reduction is 50%. Ask which fee lines qualify when comparing the city’s estimate with a private provider’s proposal.
Sources: [1] Visit the Cooper City Building Division; [4] Building Division fee tables, counter hours and account instructions (city website data); [22] Cooper City Commission decision on private-provider fee reductions
Plan review and corrections
Cooper City says it reviews residential plans in the order received and posts a maximum of 30 working days after submission for review.
The division notifies the applicant when a permit is ready to issue or needs corrections. Florida Statutes § 553.792 has deadlines specific to the application. For a roof on an existing single-family home, the statute gives a local government plans reviewer five business days for a decision if the work is valued below $15,000. That period starts with a complete and sufficient application and applies unless the applicant waives it in writing. Ask the permit counter which deadline applies to the record.
For an addition returned with comments, Cooper City asks for revision clouds around the changes, a sheet identifying the corrections and a correction or revision form.
Use the sheet to point the reviewer to each changed detail, such as a revised opening pressure or floor elevation.
Sources: [4] Building Division fee tables, counter hours and account instructions (city website data); [10] Florida Statutes § 553.792 — decisions on complete applications; [8] Cooper City residential addition checklist
Inspection windows and final approval
In Accela, choose Schedule an Inspection under Building. The confirmation email gives the inspection type, date and general time window.
Cooper City lists electrical visits Monday through Friday, 4:00 to 6:00 PM, and mechanical and plumbing visits Monday, Wednesday and Friday, 3:30 to 6:00 PM. Use the confirmation for the scheduled visit, since the posted windows can change.
Have the permit and approved plans available in print or on a device the inspector can view.
For a roof inspection, Cooper City asks for a secured ladder and clear access. Read the result in the permit record before scheduling another visit. If the project needs a certificate of occupancy, check the master permit and each subpermit. Cooper City’s checklist calls for final approval and closure of all subpermits, a final survey and a final elevation certificate. It lists a blower door test certificate for residential projects.
Sources: [2] Open Cooper City Accela to apply, look up a permit or schedule an inspection; [11] Cooper City inspection preparation and trade schedules; [12] Inspection windows and instructions (city website data); [14] Cooper City certificate of occupancy checklist
Flood zone and floor elevation records
When planning the floor elevation for an addition, check the Cooper City parcel against the FEMA maps effective July 31, 2024.
Ordinance 24-12 updated the flood study and map date in City Code § 6-69. The city’s Flood Preparedness page links the map. For the parcel’s flood zone or a copy of an elevation certificate on file, call Community Development at 954-434-4300, extension 296. FEMA lists Cooper City at Class 6 in the Community Rating System. Use the parcel map and elevation records to discuss the addition’s proposed floor height with the city.
Sources: [15] Cooper City flood map and elevation certificate contacts (city website data); [16] Cooper City Commission minutes approving Ordinance 24-12; [17] FEMA Community Status Book entry for Cooper City; [8] Cooper City residential addition checklist
Drawings for Cooper City plan review
Pineland Engineering can prepare an addition set that ties the proposed first-floor elevation on the site plan to the floor shown in section and coordinates roof pressures with the truss information.
For a tenant converting a shop to an office, Cooper City’s change-of-use checklist asks for the existing and proposed occupancies, any required fire separation between occupancies, accessibility provisions, and a life safety plan showing occupant load and exit capacity. Pineland can use the tenant layout and adjoining uses to develop those drawings.
Sources: [8] Cooper City residential addition checklist; [13] Cooper City change-of-use checklist
Free Florida Engineering Tools
Related Resources
What Do People Ask About Cooper City Building Department?
What is the Cooper City Building Department phone number?
Dial 954-434-4300 and select option 4 for the permit counter. For help with an existing record, have the Cooper City permit number available. Written questions can go to [email protected].
How do I find an older Cooper City permit in Accela?
For an open permit created before September 15, 2025, create an Accela account and send the Building Division the permit number, account username and registration email. Once staff links the record, uploads, inspection requests and payments are available there. Staff can also link a newer open permit missing from the account.
Can a homeowner apply for a Cooper City permit in person?
Cooper City accepts walk-in applications at City Hall. A homeowner seeking to qualify as an owner-builder must appear personally, complete the owner-builder affidavit and sign the permit. When calling option 4, describe who will do the work so staff can direct the owner to the applicable package.
What size storage shed does Cooper City allow?
The city’s accessory building permit package lists a maximum of 150 square feet and a height limit of 8 feet for a storage shed. Those limits appear on the permit application. Use the shed checklist and show the proposed location on the survey, including distances to the rear and interior side property lines.
Can I get a narrower window for a Cooper City structural inspection?
Call 954-434-4300, extension 264, before 8:30 AM on inspection day to request a two-hour window. Fire inspections have a different contact. Call 954-789-3908 the day before a fire inspection for an approximate time.
Do commercial window replacements have an extra inspection requirement?
For window or glass installations on commercial buildings over two stories, Cooper City requires a special inspector letter. Flag the building height when contacting the division about the window application and ask when to submit the letter.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.