Quick Answer
For online filing, open the CAP link below and choose Miami-Dade as the county and Village of El Portal as the jurisdiction. For counter service, Village Hall opens Monday through Friday from 8:30 a.m. to 4:30 p.m. and closes on government holidays and weekends. The Building Clerk answers permit questions at [email protected]. Office details and the portal link were checked November 23, 2026.
The Village of El Portal Building Department takes permit applications through CAP or by appointment at Village Hall, 500 NE 87th Street, El Portal, Florida 33138. Call 305-795-7880 to arrange a paper drop-off or schedule an inspection.
Where Can I Verify the Official Requirements?
- Village of El Portal — Code Enforcement & Building Department
- Open CAP to file or check an El Portal application
- Village permit application requirements
- Village electronic plan submission walkthrough
- Miami-Dade Property Appraiser municipal folio codes
- El Portal permit application and job valuation form
- Village owner-builder instructions and review estimates
- Village driveway instructions and paving supplement
- Miami-Dade floodplain manager directory, Appendix G
- Miami-Dade County staff report on FEMA map adoption
- Florida Building Commission HVHZ definition
- Florida Building Commission current code effective date
- Florida Building Commission upcoming code effective date
- Request permit records from the Village Clerk
- Florida Statutes, section 553.79
- Village demolition permit procedure
- Village building permit fee schedule
- Village of El Portal notices and payment verification
- FEMA community status entry for El Portal
Check the first two digits of the property folio
If the mailing address says Miami, look up the street address in the Miami-Dade Property Appraiser’s Property Search.
The first two digits of the folio identify the municipality. El Portal is 18, Miami Shores is 11, the City of Miami is 01 and unincorporated Miami-Dade is 30. For a parcel beginning with 18, use the Village’s application and keep the full folio handy to identify the property at the counter or in correspondence.
Sources: [5] Miami-Dade Property Appraiser municipal folio codes; [7] Village owner-builder instructions and review estimates; [4] Village electronic plan submission walkthrough
Assemble the master application and trade forms
El Portal’s intake checklist calls for a notarized permit application, plans and evidence of ownership.
A deed or a printout from the Property Appraiser serves as proof. If the deed names a company, include its articles of incorporation showing its authorized agents and a copy of valid ID for the agent who signed. An applicant filing as an owner-builder also submits the Village’s owner-builder affidavit.
For an addition involving several trades, collect their applications before filing the master permit.
El Portal wants them submitted together. The valuation sheet in the Village application separates the building cost from roofing, windows, doors, railings and the mechanical, electrical and plumbing work. Use those lines to show how the individual amounts relate to the project total.
Contractors can use the registration section of the Village checklist to assemble their credentials.
It lists state certification or a Miami-Dade certificate of competency, state registration, a local business tax receipt and a driver’s license copy. Its insurance items are a general liability certificate and proof of workers’ compensation or an exemption certificate.
Sources: [3] Village permit application requirements; [6] El Portal permit application and job valuation form; [7] Village owner-builder instructions and review estimates
File the PDFs in CAP and find the submission again
From the Village’s Electronic Plan Submission link, register for CAP and follow the activation link sent to the registration email.
Sign in and select “Submit a Project for Review.” After choosing Miami-Dade and Village of El Portal, work through the Express Review Checklist. Describe everything the reviewers will see on the plans, including any trades filed under the master application.
The Village walkthrough accepts PDFs and shows a separate final confirmation after the upload.
Choose “Confirm and Submit for Review” and confirm the prompt. Use “View Submitted Projects” to see the application’s status or start a resubmission. The department also sends review updates to the registration email. For a paper filing, reserve a drop-off appointment at Village Hall. Use the Building Clerk’s email for questions and keep plans and submission documents out of email.
Sources: [1] Village of El Portal — Code Enforcement & Building Department; [2] Open CAP to file or check an El Portal application; [4] Village electronic plan submission walkthrough
Budget for the filing fee and check the review estimate
The Village checklist lists an upfront processing fee of 0.5% of job value with a $127.86 minimum, collected per application at submission.
If the package includes several trade applications, ask the Building Clerk how the fee applies to each. For the rest of the charges, consult the Village’s permit fee schedule linked in the official sources. On an electronic filing, the Village contacts the applicant with the permit fee after approval. Pay that amount by credit card to download the approved package.
The Village’s owner-builder instruction sheet estimates 5 working days for residential review and 14 working days for commercial review.
Use those figures to plan when to check the application. Before arranging a construction start, check the actual status in CAP and allow for any resubmission and the payment step. If a payment request arrives concerning a planning or zoning agenda item, the Village advises verifying it directly with the municipality.
Sources: [3] Village permit application requirements; [17] Village building permit fee schedule; [7] Village owner-builder instructions and review estimates; [1] Village of El Portal — Code Enforcement & Building Department; [2] Open CAP to file or check an El Portal application; [18] Village of El Portal notices and payment verification
Driveways and demolition have their own filing instructions
For a driveway, start with the property survey. El Portal asks for a survey no more than six months old or an affidavit confirming that an older survey still shows the property accurately.
The site plan shows the driveway dimensions, distances to the property lines and existing building, and how rainwater will stay on the lot.
For single-family residential districts, the Village’s paving supplement cites section 24-17.5(d).
Parking areas, driveways and other impervious surfaces, including walks, together may occupy up to one-third (33%) of the front yard. Use the front-yard area as the denominator when completing the percentage on the form. The driveway packet also includes a covenant for an approach in the public right-of-way and directs applicants to file through CAP.
For partial demolition, submit the complete plans for the rehabilitation at the same time as the demolition application.
Commercial demolition has a separate sequence. File with El Portal to obtain a process number, then take the plans to Miami-Dade County’s Division of Environmental Resources Management for approval before the Village’s discipline reviews.
Sources: [8] Village driveway instructions and paving supplement; [16] Village demolition permit procedure
Map dates and hurricane-zone design in El Portal
Miami-Dade lists September 11, 2009 as the effective date of the flood insurance maps covering El Portal.
Its report gives February 19, 2027 as the effective date for the revised maps and flood study. For an addition that spans the change, take the survey to the Village Building Official, whom the county lists as El Portal’s floodplain contact, and ask which map and elevation reference to use. FEMA’s El Portal entry leaves the Community Rating System class blank.
El Portal’s location in Miami-Dade also puts it in the High-Velocity Hurricane Zone.
When choosing the code in CAP, use the edition applicable to the filing date. For current El Portal applications, the Florida Building Code is the 8th Edition (2023), effective December 31, 2023. For an application planned around year-end, the 9th Edition (2026) takes effect December 31, 2026.
Sources: [9] Miami-Dade floodplain manager directory, Appendix G; [10] Miami-Dade County staff report on FEMA map adoption; [19] FEMA community status entry for El Portal; [5] Miami-Dade Property Appraiser municipal folio codes; [11] Florida Building Commission HVHZ definition; [12] Florida Building Commission current code effective date; [13] Florida Building Commission upcoming code effective date
Coordinate the El Portal drawings before filing
Pineland Engineering can prepare the addition plans and coordinate them with the driveway drawing.
For example, the site plan can show the new footprint, the walks included in the front-yard paving calculation and where runoff will go. The owner can then compare the drawing with the areas entered on El Portal’s paving supplement before uploading both to CAP.
Sources: [3] Village permit application requirements; [8] Village driveway instructions and paving supplement
Free Florida Engineering Tools
Related Resources
What Do People Ask About El Portal Building Department?
How do I book an inspection in El Portal?
Call Village Hall at 305-795-7880 by 4:00 p.m. the day before. The Village inspects on Tuesdays and Thursdays from 10:00 a.m. to 2:00 p.m. For a Thursday inspection, that puts the call deadline on Wednesday afternoon. The Village asks contractors to provide a recorded Notice of Commencement by the first inspection.
How do I look up an El Portal building permit?
For an application filed under your CAP account, sign in and choose “View Submitted Projects.” To obtain a copy of a Village permit for a property, contact the Village Clerk through the Village’s public records page. Give the street address, folio and permit number if known, and specify whether you need the permit itself or an inspection record.
Does El Portal need a copy of the construction contract?
The Village’s older CAP walkthrough lists an executed contract among the uploads. Under Florida Statutes section 553.79(1)(f), a local government may not require the builder-owner contract to submit a building permit application or obtain the permit. If CAP prompts for the contract, ask the Building Clerk how to complete that field. The Village application includes a separate job valuation sheet.
Can an owner file at Village Hall instead of using CAP?
The Building Department accepts a general permit package on paper by appointment. Call before bringing the package to NE 87th Street. Check the instructions for the specific work first. El Portal’s driveway packet, for example, directs applicants to submit those documents through CAP.