Quick Answer
For a county permit, choose Permit Submittal in Gov-Easy. If you plan to pick up the permit in Quincy, the county issues permits only through 4 p.m. and also accepts document drop-offs. For property inside Quincy city limits, check the city’s application before starting a county file.
Reach the Gadsden County Building Department at (850) 875-8665 or visit the Edward J. Butler Governmental Complex, 1-B East Jefferson Street, Quincy, FL 32351. Use the county’s Gov-Easy Permitting portal to file an application, find a permit or schedule an inspection.
Where Can I Verify the Official Requirements?
- Gadsden County Building Department — contact the permit counter
- Gadsden County Gov-Easy — apply, search or request an inspection
- County permit applications, owner forms and fee schedule
- County forms for houses, sheds, roofing and other work
- Town of Havana — zoning before a county permit
- City of Quincy — residential building permit application
- County Land Development Code — where it applies
- County Land Development Code — development orders and permits
- County housing permit process — site inspection through occupancy
- Gadsden County directory — Building and Planning contacts
- Gadsden County — certified contractor registration checklist
- Gov-Easy — filing a permit and uploading documents
- Gov-Easy — finding a permit record
- Gov-Easy — scheduling an inspection
- County electrical permit application — reinspection fee
- FEMA — Gadsden County flood insurance study and map history
- FEMA Map Service Center — find the map for a property
- FEMA — proposed Gadsden flood maps and local map repositories
- Florida Building Commission — current code
- Florida Building Commission — next edition effective date
- Florida Building Commission — High Velocity Hurricane Zone boundaries
- Florida Statutes — permits for on-site work on state-approved sheds
- Gadsden County commission — floodplain ordinance adoption
A Quincy address can lead to two different permit offices
For a parcel in unincorporated Gadsden County, use the county counter on East Jefferson Street.
For a house inside Quincy city limits, the City of Quincy publishes its own residential building permit application. If you have a Quincy mailing address and are unsure where the boundary falls, give Building the parcel ID before choosing a portal. For a counter visit, call ahead for opening hours. The county’s posted time is a cutoff for issuing permits. County contact and portal information checked November 23, 2026.
Havana has a different arrangement. The county issues the building permit and handles construction inspections, but the Town of Havana may require a zoning application before the county can issue the permit.
Call Havana Town Hall at 850-539-2820 with the address and a description of the work to find out whether that step applies.
Sources: [1] Gadsden County Building Department — contact the permit counter; [2] Gadsden County Gov-Easy — apply, search or request an inspection; [7] County Land Development Code — where it applies; [8] County Land Development Code — development orders and permits; [6] City of Quincy — residential building permit application; [5] Town of Havana — zoning before a county permit
For a new house, start with the county’s development order
The county’s housing flowchart starts with a residential development application.
Planning gives the applicant flags to mark the site for inspection. The chart calls for driveway and environmental review and shows the Residential Development Order going from Planning to Building. Once the order is issued, check that Building has it and use the Single Family Dwelling Building Permit application. Under section 7500(E) of the county Land Development Code, a certified copy of the order issued for the use or site accompanies the permit application.
The scope of work makes a difference. Section 7002(C) exempts residential interior alterations from the development order process.
A building or trade permit can still apply. If you are remodeling a kitchen and also adding a room, describe both parts when you call Planning and Community Development at (850) 875-8663. Ask whether the addition needs an order and which drawings should show the new footprint.
For a development order, section 7105(B) gives Planning ten working days to check whether the submission is complete.
That clock covers the completeness check. For your construction start date, ask Planning whether it has forwarded the order, then ask Building for the current review time on your permit.
Sources: [9] County housing permit process — site inspection through occupancy; [4] County forms for houses, sheds, roofing and other work; [8] County Land Development Code — development orders and permits; [10] Gadsden County directory — Building and Planning contacts
Choose the county form and identify who will file it
The county’s forms directory has different applications for an addition, a general repair and commercial work.
For a contractor-filed permit, include the property owner’s letter authorizing the contractor. A contractor applying here for the first time, or whose last Gadsden County permit was issued a year or more ago, should email the county’s certified contractor registration form to [email protected].
The registration checklist asks for a copy of the current state-certified license and current liability and workers’ compensation documentation naming the Gadsden County Building Department as certificate holder.
There is a second authorization to consider if an employee will pull permits for the license holder. That letter establishes who can act for the contractor. The owner’s letter gives the contractor permission for the job.
Sources: [1] Gadsden County Building Department — contact the permit counter; [3] County permit applications, owner forms and fee schedule; [11] Gadsden County — certified contractor registration checklist
File in Gov-Easy and keep the project record
Sign in to the Gadsden portal and choose Submit a new permit.
From the dashboard, you can also open the user menu and select Apply for a Permit. Select Gadsden and the job type. Search by address, folio or owner name, then select the matching property. If the street name brings up several parcels, compare the result with your property information before entering the job description.
Select Contractor or Owner and complete the job details. Use Save and Attach Files to add the county application and its supporting documents, then select Submit Files.
Back on the dashboard, open View beside the project to see the submission. Keep that record handy if you need to ask Building about a missing owner authorization or Planning’s development order.
Sources: [2] Gadsden County Gov-Easy — apply, search or request an inspection; [12] Gov-Easy — filing a permit and uploading documents; [1] Gadsden County Building Department — contact the permit counter; [8] County Land Development Code — development orders and permits
Where to find the fee for your job
Open Permit Applications and Forms on the county website and select Permit Fee Schedule.
For a used mobile home moving within Gadsden County, Building publishes a specific charge of $143.00 for the Code Compliance Permit required before the move. Review the county’s used manufactured home inspection checklist before arranging transport. The forms directory also lists a mobile home application. Ask Building which fees apply to installation at the destination before budgeting for the move.
A return inspection can carry its own charge. For example, the county electrical application lists $36.00 for reinspection after a failed inspection, payable before inspections can continue.
If you are arranging another electrical inspection, confirm the balance with Building before choosing a return date in Gov-Easy.
Sources: [3] County permit applications, owner forms and fee schedule; [1] Gadsden County Building Department — contact the permit counter; [15] County electrical permit application — reinspection fee; [2] Gadsden County Gov-Easy — apply, search or request an inspection
Flood maps and permit drawings for the Gadsden parcel
FEMA’s map history records a February 4, 2009 flood insurance rate map revision for unincorporated Gadsden County.
FEMA also lists preliminary maps for Gadsden and its cities. Search the property address in the FEMA Map Service Center for the official map. Mark where the house or addition would sit, especially if a mapped boundary crosses the lot. Call the county Building office and ask for the floodplain administrator to confirm which map and elevations to use for that footprint.
For a Gadsden application filed now, the Florida Building Code 8th Edition (2023) applies.
It took effect December 31, 2023. For a Gadsden filing at the year-end changeover, December 31, 2026 is the effective date of the 9th Edition (2026). Gadsden lies outside Florida’s High Velocity Hurricane Zone. Give the designer the actual site location to establish the wind criteria for the drawings.
If you need drawings for Gadsden’s residential development review, send Pineland Engineering your survey, the county application and any comments from Planning.
For a new house, Pineland can use that information to coordinate the building dimensions on the architectural and structural drawings with the house location and grading on the civil site plan.
Sources: [16] FEMA — Gadsden County flood insurance study and map history; [17] FEMA Map Service Center — find the map for a property; [18] FEMA — proposed Gadsden flood maps and local map repositories; [23] Gadsden County commission — floodplain ordinance adoption; [19] Florida Building Commission — current code; [20] Florida Building Commission — next edition effective date; [21] Florida Building Commission — High Velocity Hurricane Zone boundaries; [4] County forms for houses, sheds, roofing and other work; [9] County housing permit process — site inspection through occupancy
Free Florida Engineering Tools
Related Resources
What Do People Ask About Gadsden County Building Department?
How do I look up a Gadsden County building permit?
In Gadsden’s Gov-Easy portal, open Permit / Inspection Search. Choose the permit type and search criteria, enter the displayed security code and select Find. Use the magnifying glass next to the matching row to see its details. For a house inside Quincy, check with the city if the county search is empty.
How do I know my Gadsden inspection request went through?
Under Request Inspection, choose the contractor or homeowner option, enter the job details, select a date and click Schedule. Gov-Easy displays a green success message when it accepts the date. A red warning means you need to choose another date.
What size shed needs a permit in Gadsden County?
Florida allows delivery and installation of a storage shed of 400 square feet or less without a contractor’s or specialty license if the shed bears the state’s approval insignia. On-site work still falls under local permitting and inspection. Gadsden lists one application for site-built sheds and another for sheds or carports built elsewhere. Give Building the dimensions, use and construction method to confirm the permit for your shed. Check the county’s accessory structure checklist for the zoning step.
Can a homeowner apply through the Gadsden portal?
Gov-Easy includes an Owner option, and Gadsden publishes an Owner-Builder Statement Affidavit. Describe the work and who will perform it to Building so the office can confirm whether you qualify to file that way. If a contractor pulls the permit, complete the county’s owner-to-contractor authorization for that job.
Which inspection comes before occupancy for a new county home?
Gadsden’s housing flowchart puts the sediment and erosion control inspection after permit issuance. It shows construction inspections followed by the final Building Department inspection before Building issues the certificate of occupancy. Use the county permit record to ask which inspections still need attention on your house.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.