Greenacres Building Department

Pineland Engineering prepares permit-ready construction documents for Greenacres, Palm Beach County, Florida projects and coordinates directly with the Greenacres Building Department during plan review — so you get your permit faster.

Quick Answer

For a new Greenacres permit, open the MGO Connect Customer Portal from the city’s Building Permits page. The nonrefundable $75 paid at filing counts toward the fee at issuance. For an inspection on an existing permit, check the original submission date. April 15, 2026 is the dividing line between phone or email scheduling and the MGO Contractor Portal.

The City of Greenacres Building Division issues building permits for property inside the city limits. Reach the division at 561-642-2052 or visit Greenacres City Hall, 5800 Melaleuca Lane, Greenacres, FL 33463, Monday through Friday from 8:00 a.m. to 4:30 p.m.

Where Can I Verify the Official Requirements?

Find the right office before opening an MGO application

If the address says Lake Worth and the site may be in Greenacres, verify the jurisdiction before registering in MGO.

Give the Palm Beach County Property Appraiser the street address or legal description and ask which municipality contains the parcel. A site in Greenacres goes to the city’s Building Division. Lake Worth Beach has its own Building Division, and the Palm Beach County Permit Center takes applications for unincorporated parcels through ePZB.

For help setting up a contractor account, call 561-642-2059. In the MGO Connect mobile app, search for Greenacres. City Hall contact details and the city’s portal link were checked November 23, 2026.

Sources: [1] Greenacres Building Division and MGO Connect; [2] Open MGO Connect — apply, track a permit or pay; [3] Greenacres Building Permits and the MGO portal; [15] Greenacres planning and building FAQs; [16] Palm Beach County Permit Center jurisdiction; [17] Lake Worth Beach Building Division; [8] Greenacres MGO transition and contractor enrollment

Start a permit and choose the documents for the work

Create an MGO account and choose Greenacres. Contractors in state-regulated or locally licensed trades can select “Apply for Contractor’s Registration” in MGO to enroll with the city before obtaining permits or starting work.

For a new application, open the city’s Applying for a Permit page, choose the package for the work and include the completed checklist if the city provides one. Upload the application and plans in MGO. Use MGO to track status, receive notices and pay.

For windows or doors, identify each replacement opening on a floor plan.

Greenacres asks for its worksheet and a marked copy of the Notice of Acceptance for each proposed product. If installing a window involves changing the structure around it, the city requires a separate building permit for the opening alteration.

For air conditioning, first decide whether the existing equipment is being replaced like for like.

The changeout package lists an AHRI equipment certificate and a Notice of Acceptance for the condenser tie-downs. Its worksheet asks for the equipment model numbers. If the scope includes a new system or a new mini-split, use the mechanical permit route and include energy calculations, heating and cooling load calculations, and a floor plan for review.

Sources: [3] Greenacres Building Permits and the MGO portal; [4] Greenacres instructions for applying for a permit; [9] Greenacres instructions for attaching a permit checklist; [7] Greenacres contractor enrollment in MGO; [10] Greenacres windows and doors checklist; [11] Greenacres air-conditioning changeout package

Read the Greenacres fee schedule before paying

The $75 application payment is credited once, against the amount due when the city issues the permit.

The city’s construction-value table starts at 2.5% on the first $100,000, with a $75 minimum. It adds 2% on the portion from $100,001 through $300,000 and 1.25% on value above $300,000. For a sub-permit, the listed $30 rate applies when the master permit already includes the trade’s value and the trade needs no independent review.

For a commercial remodel, check the plan review table as well as the valuation table.

Greenacres lists $75 for plan review of a commercial or institutional remodel up to 20,000 square feet. For a new development, ask about Palm Beach County impact fees separately. The city directs applicants to the Building Division or the county Impact Fee Office for those schedules. For repeat inspections of the same type, the schedule lists $50 for the first reinspection, $100 for the second and $200 for the third and each subsequent visit.

Sources: [5] Greenacres Building Division permit fees; [1] Greenacres Building Division and MGO Connect

Return corrections to the right permit record

When a Greenacres reviewer requests a change, check whether the permit is still in review or has already been issued.

For an application in review, the Plan Review Comments form asks for the permit number, the corrections and their sheet numbers. Cloud the changes on the affected drawings and enter the comment dates in the revision box. For an issued permit, use the revision form.

For a project already in the system before April 16, 2026, the city’s application instructions direct revisions, sub-permits and resubmittals to [email protected] as unlocked PDFs that staff can mark up.

Inspections follow a different cutoff.

If Greenacres asks for details of an enlarged window opening, Pineland Engineering can prepare drawings of the framing and connections and identify the revised sheets on the city’s comments form.

Include the original floor plan and the marked product approval when sending the reviewer’s question to Pineland.

If the drawings show construction, alteration or relocation that affects a public street, alley or lane, check Greenacres amendment § 105.3.9.

The building official must wait for the responsible agency’s right-of-way permit before issuing the building permit for that work.

Sources: [4] Greenacres instructions for applying for a permit; [13] Greenacres plan review comments form; [10] Greenacres windows and doors checklist; [8] Greenacres MGO transition and contractor enrollment; [18] Greenacres building code administrative amendments filed with the state; [12] Greenacres accessory structure checklist and worksheet

Schedule inspections and close out the permit

For permits submitted on or after April 15, 2026, book the inspection in the MGO Contractor Portal.

For earlier submissions, call 561-642-2062 or email [email protected]. Give the permit number, site address, inspection type or code, and the contact’s name and phone number. When a Notice of Commencement is required, the Building Division needs a certified copy before the inspection request.

The cutoff is 3:00 p.m. on the preceding business day. For a Monday visit, that means Friday by 3:00 p.m.

To cancel, notify the city by 8:30 a.m. on the inspection day. For windows and doors, book the buck inspection before final and ask the inspector before relying on photographs. For roofing, schedule the sheathing, tin tag and in-progress inspections before final.

On a private-provider job, Greenacres can audit the inspection logs against actual construction progress.

For commercial occupancy, its closeout form asks for the completed inspection card and the final survey with its matching site plan. The form lists a certificate of compliance specifically for private-provider projects.

Sources: [6] Greenacres inspection scheduling; [12] Greenacres accessory structure checklist and worksheet; [3] Greenacres Building Permits and the MGO portal; [14] Greenacres commercial certificate of occupancy request

Check the parcel’s flood map and the code date on the drawings

The flood insurance study for Palm Beach County identifies both AE and X zones in Greenacres.

The county’s map revision took effect December 20, 2024. Call the Building Division for a determination for a particular address or to request an elevation certificate already on file. Palm Beach County lists Greenacres as Class 9 in the Community Rating System. The class describes the community and cannot tell an owner which zone crosses a lot.

Greenacres Code § 4-42.1 assigns floodplain administration to the building official.

For a proposed building in a flood hazard area, ask that office whether the project also needs floodplain development approval under § 4-43.2. For exterior openings, Greenacres amendment § 118.1 puts the whole city in the wind-borne debris region. The code’s separate High Velocity Hurricane Zone covers only Miami-Dade and Broward counties.

For a Greenacres application filed now, the applicable Florida Building Code is the 8th Edition (2023), effective December 31, 2023.

The city identifies December 31, 2026 as the effective date for the 9th Edition (2026).

Sources: [15] Greenacres planning and building FAQs; [22] Greenacres floodplain management ordinance; [23] FEMA Flood Insurance Study and map index for Palm Beach County and incorporated areas; [24] Palm Beach County notice of FEMA flood map effective date; [25] Palm Beach County emergency management CRS community table; [26] Greenacres flood maps and local floodplain assistance; [18] Greenacres building code administrative amendments filed with the state; [19] Florida Building Commission report defining the High Velocity Hurricane Zone; [20] Florida Building Commission current code effective date; [21] Florida Building Commission report on the 2026 code effective date; [8] Greenacres MGO transition and contractor enrollment

What Do People Ask About Greenacres Building Department?

Does a small backyard shed need a Greenacres permit?

Greenacres treats a backyard storage shed as an accessory structure. Use the city’s accessory structure permit package and check placement before ordering even a small prefabricated unit. The city lists sheds on the worksheet and requires zoning review. Show the proposed location, size and setbacks on the survey, identify any existing slab and include the tie-down information. The worksheet also asks how many accessory structures are already on the lot.

Can a homeowner pull a permit in Greenacres?

Greenacres allows qualifying owners who live in their one- or two-family home to act as their own contractor, subject to the restrictions in its Owner-Builder Affidavit & Disclosure Statement. Read the disclosure before filing as an owner-builder. The owner must complete the affidavit, have it notarized and submit it with the permit request.

Which small home projects qualify for a permit exemption?

For a Greenacres single-family property, Florida Statutes § 553.79 provides an exemption for qualifying work valued below $7,500. The owner or contractor must request it in writing and document the scope and value. It excludes electrical, plumbing, structural, mechanical and gas work, and parcels even partly in a flood hazard area. A project cannot be split to qualify. Ask the Building Division to check the parcel and scope before relying on the exemption.

How long does Greenacres take to approve a permit?

The city’s general FAQ gives two to four days depending on permit type. That FAQ still describes the former email intake, so confirm the current estimate for your scope. Greenacres gives a more specific answer for an exact A/C changeout. Its checklist lists same-day issuance for a matching replacement, while a new system goes through plan review.

How much does Greenacres charge to extend a permit?

Before expiration, Greenacres lists up to two 90-day extensions, $50 for the first and $25 for the second. For an expired permit, its renewal fee is 50% of the permit fee if expired a year or less, and 100% if longer.