City of Kissimmee Building Division

Pineland Engineering prepares permit-ready construction documents for Kissimmee, Florida projects and coordinates directly with the City of Kissimmee Building Division during plan review — so you get your permit faster.

Quick Answer

Open kissimmee.gov/energov for the City’s Citizen Self-Service portal. For a new project, start on File for a Permit and choose Check City Limits before you apply. For a permit already on file, go straight to Check Permit Status. If the map places the job in unincorporated Osceola County, use the county permitting office.

For permits inside Kissimmee city limits, contact the City of Kissimmee Development Services Building Division at 407-518-2379 or [email protected]. The permit office is at the Development Services Center, 101 Church Street, Kissimmee, FL 34741.

Where Can I Verify the Official Requirements?

Which office serves my address?

Kissimmee appears in mailing addresses on both sides of the city boundary.

Look up the street where the work will take place. The City’s File for a Permit page links the boundary map and the Osceola County Permitting Division. St. Cloud has its own permitting office, too. This distinction also matters when you look for an older permit or a set of plans.

For a visit to the Church Street counter, call Permitting to confirm walk-in hours.

The City’s 2025 Business Tax Receipt notice gives Monday through Friday, 7:30 a.m. to 4:00 p.m., for in-person renewal payments there. For a question about how you can use a property, reach Planning at [email protected] or 407-518-2140.

Sources: [3] File a city permit application and check city limits; [11] Osceola County guidance on city and county permit records; [9] City notice on Business Tax Receipt counter hours; [13] Apply for current development review

What to select in the Kissimmee permit application

On File for a Permit, open the permit-type list before selecting File a Permit Application.

Look under Miscellaneous Accessory Structure even for some work inside an existing building. For example, moving interior walls is an Interior Alteration. Finishing an existing shell is a Build Out. If a new tenant will use the space differently, look at Change of Occupancy and describe both the proposed use and the physical changes to Permitting.

For a new single-family home, Kissimmee lists the required electrical, plumbing and mechanical sub-permits under New Single Family Residential.

For work limited to an electrical panel change at an existing building, look under Electrical. If you hire a contractor, the City’s filing instructions direct you to MyFloridaLicense.com to check the license.

Use File a Permit Application to submit your application and plans electronically.

City staff and other agencies review the submission and may send comments. Check the permit record while the plans are under review. Once the City approves and issues the permit, download the approved plans for the job site.

Sources: [3] File a city permit application and check city limits; [4] City permit categories; [5] Request a Kissimmee inspection

When to contact Planning before filing

Kissimmee handles site plans and use approvals separately from the building application.

If a tenant proposes outdoor seating or a change to the parking layout, give Planning the address, the proposed use and a sketch showing the affected area. Ask which review to complete first.

The City’s pre-application guide points to Land Development Code § 14-3-31 for site plans and § 14-3-32 for site construction.

In the planning portal’s Checklist section, choose the entry for your scope. Full Site Plan, Minor Site Plan and Resurfacing/Restriping Plan have distinct entries. Use Apply for Current Development Review to file the plan and use the portal to read comments, upload revisions and see updates.

For a parking lot restriping application, the City’s 2026 development review fee table lists $1,536 per review.

The Development Review Committee calendar allows 24 hours from submittal for staff to check whether the planning request is sufficient. An incomplete package or missing payment keeps it off the review calendar.

Sources: [1] Kissimmee permit office and contact information • checked November 23, 2026; [12] Kissimmee pre-application guide and planning checklists; [13] Apply for current development review; [24] Kissimmee 2026 development review fee schedule; [25] Kissimmee 2026 Development Review Committee schedule

Can a small residential project qualify for an exemption?

Kissimmee gives fencing at a single-family home as an example of work that may qualify.

The fence cannot serve as a pool barrier. For the minor-work exemption, the entire project must be under $7,500, involve no structural or trade work and meet the City’s flood-hazard test. If even part of the parcel lies in a Special Flood Hazard Area, the City says the exemption is unavailable.

Use the City’s Building Permit Exemption Request. Enter the parcel ID, describe the whole job and give its total cost.

Attach the contract or other documentation showing the scope and email the package to [email protected]. Wait for the Building Official to approve the request before starting, then keep the approved form on site.

Sources: [6] City rules for small residential projects; [7] Download the City’s permit exemption request

How Kissimmee calculates fees

For a commercial building permit, Kissimmee’s Resolution 24-2025 bases the fee on construction value including labor.

The commercial permit fee includes plan review and initial inspections. Exhibit A also sets a 3% technology charge on applicable fees and calls for an annual October 1 adjustment using the Consumer Price Index for All Urban Consumers. Use Fee Estimator in EnerGov for a preliminary figure. When the City bills you, open My Invoices on your dashboard, select Add to Cart for the invoice you want to pay, review the items and check out.

For new housing, check the separate Impact & Mobility Fees page.

For example, the City lists a parks and recreation impact fee of $2,410.00 per new single-family dwelling from January 1, 2026, payable at permit issuance. To check a mobility fee, use the district map and the proposed land use. Where a parcel spans two districts, tell staff where vehicles will enter the property.

Sources: [14] City Commission building permit fee resolution and Exhibit A; [15] City Commission minutes adopting Resolution 24-2025; [16] Kissimmee impact and mobility fee tables; [27] City EnerGov help • invoices and electronic submittal instructions; [28] City EnerGov help • dashboard and fee estimator

Flood maps and the code edition for Kissimmee plans

FEMA lists June 18, 2013 as the effective flood map date for the City of Kissimmee and Class 5 as its Community Rating System classification.

For an addition, locate the actual lot on the City’s Flood Zone Map and send questions about the mapped boundary to [email protected]. Include the proposed addition’s location so Stormwater staff can see where it sits on the parcel.

For a Kissimmee application filed now, use the Florida Building Code, 8th Edition (2023), effective December 31, 2023.

If the filing moves to December 31, 2026 or later, account for the 9th Edition (2026), which takes effect that day. For roofing plans, Kissimmee falls outside the code’s High-Velocity Hurricane Zone, a designation limited to Broward and Miami-Dade counties.

Sources: [18] Kissimmee flood map and floodplain contact; [19] FEMA Florida Community Status Book • Kissimmee map date and CRS class; [20] Florida Building Commission • current code edition; [21] Florida Building Commission • effective date for the ninth edition; [22] Florida Building Commission • High-Velocity Hurricane Zone definition

Booking the inspection and getting the result

Request building and trade inspections in EnerGov by 2:00 p.m.

on the business day before the requested visit. Kissimmee’s usual inspection window is 7 a.m. to 4 p.m. Monday through Friday, excluding holidays. Leave the approved plans and permit where the inspector can reach them. Arrange access if the inspector needs someone to open the building.

For driveway, sidewalk or drainage inspections, call Public Works & Engineering at 407-518-2169.

For a failed building inspection, read the result in the job-site permit box or on the permit card. Correct the items the inspector identified and pay any failed- or missed-inspection charge before requesting another visit. For a new building, the City issues the Certificate of Occupancy after construction is complete and the final building inspection has been performed.

Sources: [5] Request a Kissimmee inspection; [14] City Commission building permit fee resolution and Exhibit A

Drawings for a Kissimmee tenant build-out

Pineland Engineering can prepare the floor plan and coordinate it with structural, electrical, plumbing and mechanical drawings for a Kissimmee build-out.

Share the existing layout and the incoming tenant’s intended use. If Planning has asked for a revised parking layout, include its comments and the site plan so the building entrance and the approach shown on the civil drawings line up.

Sources: [4] City permit categories; [12] Kissimmee pre-application guide and planning checklists; [13] Apply for current development review

What Do People Ask About City of Kissimmee Building Division?

How do I search for a Kissimmee permit or get a copy?

Open Check Permit Status, choose Permit from the search menu and enter the street address or record number. Select the matching number to see the permit. If an older permit is missing, give Permitting the address and approximate year so staff can help you locate it. For a copy, use the City Clerk’s General Records request and keep the request number and security key.

Do I need a permit for a backyard shed in Kissimmee?

Kissimmee lists detached sheds under Shed/Garage/Car Port, including sheds delivered prefabricated, and lists sheds for inspection. Before ordering one, give Permitting the dimensions and proposed location and ask which plans to submit for that lot.

Which permit covers a commercial reroof in Kissimmee?

Kissimmee requires a permit for roofing. In the City’s Roof list, Re-Roof covers a repair or tear-off of an existing roof. Roof Over covers installation over existing material. Tell Permitting which method you plan to use when asking about the application.

Can a Kissimmee homeowner apply for an electrical permit?

Kissimmee lists electrical work among the residential projects eligible owner-builders may undertake at a single-family home or duplex. Its owner-builder guidance calls for personal supervision and sets ownership and occupancy conditions. Discuss eligibility with the Building Division before filing in your own name. If you intend to install the electrical work yourself, complete the City’s Electrical Disclosure Statement for Owner/Builder.

How long does Kissimmee have to review a residential roofing permit?

For an existing single-family home with roofing work valued below $15,000, Florida Statutes § 553.792 sets a five-business-day decision period when a local government reviewer receives a complete and sufficient application, unless the applicant waives the timeframe in writing. The decision can be approval, conditional approval or denial. For a commercial reroof or a submission returned for revisions, give Kissimmee Permitting the record number and ask for the applicable review date.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.