Lake Clarke Shores Building Department

Pineland Engineering prepares permit-ready construction documents for Lake Clarke Shores, Palm Beach County, Florida projects and coordinates directly with the Lake Clarke Shores Building Department during plan review — so you get your permit faster.

Quick Answer

The Town of Lake Clarke Shores Building Division handles permits at 1701 Barbados Road, Lake Clarke Shores, FL 33406. Call 561-964-1515 or use the town’s MGO Connect portal to file a new application, pay fees, check progress or schedule an inspection.

Lake Clarke Shores Town Hall is open Monday through Friday, 8 a.m. to 4 p.m. The Community Development Department gives appointments priority. For a new permit, an owner-builder or contractor can register and apply entirely online. For a property’s permit history, call Town Hall to reserve time to read its land file.

Where Can I Verify the Official Requirements?

Is the property inside Lake Clarke Shores?

Check the project location on Palm Beach County’s municipal boundary map if the address is near Palm Springs or West Palm Beach.

The map follows parcel, street and canal lines. For a site inside Lake Clarke Shores, use the town’s Building Permits page. The county’s Permit Center serves unincorporated property through a different portal, ePZB. A request from the town for county impact fee paperwork does not change where the building application goes.

Sources: [3] Community Development Services at Town Hall (checked November 23, 2026); [13] Palm Beach County municipal boundary maps; [14] Palm Beach County Permit Center for unincorporated parcels; [5] Town permit application checklist

How to file a new application in MGO Connect

Open MGO Connect from the town’s Building Permits page. New applications are electronic only.

For a contractor-led job, check that the contractor and subcontractors have registered with Lake Clarke Shores in MGO. A homeowner applying as an owner-builder signs the town’s owner-builder affidavit. The town directs owner-builders to use licensed contractors for electrical, plumbing and mechanical work.

Complete and notarize the building permit application. Gather proof of ownership from the Palm Beach County Property Appraiser and use the town’s checklist to select the documents for the job.

For replacement windows, for example, match the proposed windows to the product approvals or specifications submitted with the application. If the project calls for a Notice of Commencement, gather the certified, recorded copy and confirm with the division when it must appear in MGO. Pay the application fee in MGO when filing so the application can enter plan review.

Watch the MGO record for requests from the Building Division.

An open permit filed before the town adopted MGO stays in the former system through its final inspections. If an older permit is missing from the portal, give Town Hall the property address and permit number before starting another application.

Sources: [1] Open MGO Connect to apply, pay or request an inspection; [2] Town building permits, inspection instructions and land-file appointments; [5] Town permit application checklist

What to gather for an addition, driveway or dock

For a house addition, the town lists a Health Department verification letter and proof of paid Palm Beach County impact fees.

When a survey is applicable, the checklist specifies one no more than seven years old showing existing conditions, the septic system or drainfield, utilities and easements. Check the survey date before using a copy from the purchase of the house.

For a driveway, mark the existing and proposed driveway dimensions on the survey along with the water meter, swale, easements and adjoining streets or waterways.

State the paving material and thickness on the application. Include the Health Department letter and any applicable homeowners association approval. If the driveway crosses a right-of-way or easement, the town requires a right-of-way permit. The form asks whether the swale or stormwater system will change.

For a dock, boat lift, seawall or bulkhead, identify who controls the waterway at the property line.

The town checklist calls for a separate permit on waterways under Lake Worth Drainage District or South Florida Water Management District jurisdiction. Give the Building Division the location of the proposed structure when asking which district to contact.

Sources: [5] Town permit application checklist; [6] Town driveway, fence, irrigation and shed checklists; [8] Town public right-of-way application

How Lake Clarke Shores calculates permit fees

The town bases its building permit application fee on job cost, with a minimum of $90.

It lists 3% on the first $100,000, plus 2% on the portion from $100,001 to $200,000, plus 1% on valuation over $200,001. For a job at a bracket boundary, ask the division to confirm the calculation. The town also lists two state surcharges of 1.5% each, both based on the building permit fee.

Plan review adds $150 for an addition or remodel and $350 for new construction.

Keep the county impact fee documentation separate from the receipt for the town application fee. The town says the county impact fee assessment uses the schedule in effect on the date the permit is issued.

Sources: [4] Town permit and plan review fees; [5] Town permit application checklist; [9] Town notice on Palm Beach County impact fees

From permit issuance to the final inspection

Town Code § 10-91 requires the permit before the covered work starts.

Post the issued permit at the job site and use its inspection list to plan the work in order. For a town irrigation permit, for example, request the rough inspection after installing the pipes while they are still uncovered. Request the final inspection when installation is complete.

For MGO permits, schedule each inspection through the portal.

If an inspector flags materials or workmanship, correct the issue before proceeding. The town lists a $75 fee when a failed inspection requires another visit. Every town building permit needs a final inspection, including a shed or an irrigation project.

Sources: [15] Town Council adoption of the amendment to § 10-91; [2] Town building permits, inspection instructions and land-file appointments; [6] Town driveway, fence, irrigation and shed checklists; [4] Town permit and plan review fees

Flood records and design criteria for the parcel

FEMA lists October 5, 2017 as Lake Clarke Shores’ effective flood map date and gives the town a Community Rating System classification of 8.

For a specific house, Town Hall has copies of elevation certificates submitted since 1994. For a residential addition or substantial renovation, the town compares the cost of improvements over five years with the market value of the building. At 50% or more, it says the existing building must meet new-construction standards. Ask the town’s floodplain administrator which costs and valuation to use for the house. For new construction, the town calls for an elevation certificate and a finished-floor elevation survey.

For a Lake Clarke Shores application filed now, the Florida Building Code in force is the 8th Edition (2023), effective December 31, 2023.

For an addition scheduled for filing at year-end, confirm the submission date with the division because the 9th Edition (2026) takes effect December 31, 2026. Lake Clarke Shores is in Palm Beach County, outside the code’s High-Velocity Hurricane Zone. The town publishes a 140-mph wind criterion specifically for sheds.

Sources: [10] Town elevation certificates and finished-floor surveys; [11] FEMA flood map date and community rating for Lake Clarke Shores; [12] Florida directory of local floodplain administrators; [17] Florida Building Commission effective code; [18] Florida Building Commission adoption calendar; [16] Florida Building Commission hurricane zone definition; [6] Town driveway, fence, irrigation and shed checklists

Drawings for a Lake Clarke Shores addition

Pineland Engineering can use the survey to lay out the addition in relation to the drainfield and utility easements, then detail how the new framing connects to the house.

If the footprint also changes the driveway, give Pineland the water meter location and the swale information requested on the town’s driveway checklist so the paving and building drawings agree.

Sources: [6] Town driveway, fence, irrigation and shed checklists; [5] Town permit application checklist

What Do People Ask About Lake Clarke Shores Building Department?

Does a small backyard shed need a Lake Clarke Shores permit?

Yes. Lake Clarke Shores requires a permit for a shed, including one within the town’s size limits. Its shed checklist sets a maximum of 160 square feet with no side longer than 14 feet. Submit a survey showing the shed’s distances to property lines, plans or manufacturer specifications, the contract and Health Department letter. Include association approval if applicable. Running power to the shed also requires an electrical permit.

Does a concrete patio need the same paperwork as indoor tile?

Lake Clarke Shores lists tile installation as cosmetic work exempt from a building permit. A patio covering ground is on the town’s list for a Health Department verification letter. For a proposed pour, describe its location and use to the Building Division before ordering concrete.

Can someone look up a property’s building permit records?

Yes. The town makes property land files available for public review at Town Hall. Call 561-964-1515 to book at least 24 business hours in advance. For an active electronic application, the applicant can check status directly in MGO.

How long does a Lake Clarke Shores permit review take?

For a current estimate, give the Building Division the MGO application number and the type of work. Check whether the application fee posted and whether the reviewer has requested another document before setting a construction start date.

Is $90 the total permit cost for a Lake Clarke Shores remodel?

The $90 figure is the minimum building permit application fee. The town adds $150 for remodel plan review, and the application fee can rise with the job cost. Use the town’s fee schedule and the amount assessed in MGO to budget for the permit.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.