Quick Answer

For permit help, call Lake Park’s Building Division at (561) 881-3318 or visit the Town Hall counter between 8:30 a.m. and 5:00 p.m. To file, select Palm Beach County and then Lake Park in the CAP permit portal. For inspection questions on an issued permit, call (561) 486-0477.

The Building Division of the Town of Lake Park Community Development Department issues permits from the ground floor of Town Hall, 535 Park Avenue, Lake Park, FL 33403. Owners and contractors submit applications and supporting documents online through CAP.

Where Can I Verify the Official Requirements?

Is the property inside the Town of Lake Park?

Use Palm Beach County’s municipal boundary map if the site is near Riviera Beach or North Palm Beach.

Both are separate municipalities. A parcel in unincorporated Palm Beach County goes to the County Permit Center. In particular, choosing Palm Beach in the county field on the CAP form is only part of filing with Lake Park. The next field identifies the municipality that will review the plans.

For a new development or major redevelopment inside Lake Park, the Town’s Planning Section reviews the site plan.

The zoning contact is (561) 881-3320. For a proposed storefront, give Planning the street address and the intended business use so staff can check the zoning district. When a business changes location or use, the Town directs the owner to get zoning approval first. Building processes the Town’s business tax receipts. Office and portal details checked November 23, 2026.

Sources: [1] Lake Park Community Development Department — permit counter and contacts; [2] Open CAP — apply, check a project or schedule an inspection; [5] Lake Park’s screen-by-screen CAP application guide; [10] Lake Park resident guide — storage sheds and business zoning; [11] Palm Beach County municipal boundary map; [12] Palm Beach County municipality directory; [13] Palm Beach County Permit Center for unincorporated property; [14] Lake Park Planning and Building divisions

Choose the Lake Park form that matches the work

Open Permits & Other Documents for the Building Permit Application.

The same directory has a revision form for an existing permit, a change-of-contractor form and a checklist for a certificate of occupancy or completion. Owners considering acting as their own contractor can find the owner-builder affidavit and disclosure in that directory and discuss eligibility with the permit counter.

For air conditioning, the Town’s checklist makes a distinction that matters before an installer applies.

A new installation calls for mechanical and electrical applications. Its plan checklist includes heat-load, duct-sizing and energy calculations. For a change-out, use the replacement portion of the checklist. It lists a mechanical permit, an A/C data sheet and tie-down details. If the replacement moves the unit, the Town also lists an electrical review. Tell the installer whether the condenser is staying in its present location so the application describes the right job.

Sources: [3] Lake Park permit applications, revisions and checklists; [9] Town checklist for air-conditioning installations and replacements; [24] Lake Park application checklist and owner-builder forms

Submit the project in CAP and find it again

At cap.idtplans.com/secure/, a first-time applicant can register and activate the account from the verification email.

From the CAP home screen, choose “Submit a Project for Review.” Select Palm Beach for county, Lake Park for jurisdiction and Building Code Review for the application category. Enter a project name that will be recognizable when checking the record later.

The Town’s guide walks through the Express Review Checklist before the project description.

Describe the scope, provide a contact number and leave the project number blank for CAP to assign. Review the entries before opening the document upload. Add the application, drawings and supporting files for the selected scope, start the upload, then confirm submission for review. Saving the files alone leaves that last step unfinished.

Lake Park contacts the applicant about payment after receipt.

Payment starts review, and staff give a reason if they reject an incomplete application. In CAP, “View Submitted Projects” shows the current status and provides the way to start a resubmittal. Keep the project number with any notice from the Town so a question about a missing file can be matched to the right record.

Sources: [1] Lake Park Community Development Department — permit counter and contacts; [2] Open CAP — apply, check a project or schedule an inspection; [4] Town guide to the permit counter and walk-in hours; [5] Lake Park’s screen-by-screen CAP application guide

How Lake Park calculates building permit fees

Under the Town’s master fee schedule effective October 1, 2026, the minimum building permit fee is $150 for work valued up to $2,499.

For a value of $2,500 or more, the schedule lists $150 plus 2% of the permit value. Electronic permit processing carries a technology fee of 3% of the permit fee, with a $10 minimum. Ask the Building Division for the total due for the specific application before sending payment. The department describes permit fees as nonrefundable.

Required inspections are included in the permit fee. The Town lists a $130 reinspection fee and a $75 administrative fee for a revision that keeps the existing permit number.

If the design changes during construction, give the counter the original permit number when asking which revision form to file and what fee applies.

Sources: [1] Lake Park Community Development Department — permit counter and contacts; [3] Lake Park permit applications, revisions and checklists; [7] Lake Park Master Fee Schedule — building fees in Exhibit A; [8] Town Commission minutes approving the master fee schedule

Check flood and wind information for the parcel

For a Lake Park addition, check the footprint on Palm Beach County’s flood map using the revision effective December 20, 2024.

Direct map questions to Community Development at (561) 881-3319. The County lists Lake Park as Class 6 in the Community Rating System. To determine what belongs in the application, use the property’s mapped zone and the proposed work.

Lake Park Code § 60-21 names the Community Development Director as floodplain administrator.

Under § 60-38, the administrator can call for a separate floodplain approval based on what the development involves. When an addition includes fill or changes the lot grading, show both the footprint and the affected ground when asking about that approval.

Lake Park is outside the high-velocity hurricane zone, which Florida defines as Broward and Miami-Dade counties.

For the applicable wind criteria, Lake Park Code § 54-8.1 identifies the wind map filed with the Building Official. For current Lake Park applications the Florida Building Code 8th Edition (2023) applies, effective December 31, 2023. When preparing a filing for late December, account for the 9th Edition (2026), which takes effect December 31, 2026.

Sources: [1] Lake Park Community Development Department — permit counter and contacts; [16] Palm Beach County effective flood maps and zone lookup; [17] Lake Park floodplain ordinance, Chapter 60; [18] Palm Beach County Community Rating System classifications; [19] Town of Lake Park wind map and inspection provisions; [20] Florida Building Commission — effective edition; [21] Florida Building Commission — next edition effective date; [22] Florida Building Commission — high-velocity hurricane zone definition

Arrange the site inspection and close out the permit

After issuance, open the CAP inspection form with the permit number and identify exactly what the inspector will see, such as an A/C change-out or roof sheathing.

Lake Park’s inspection instructions ask the applicant to call (561) 486-0477 on the morning of the scheduled visit. Keep the work accessible and visible until approved.

CAP sends the outcome by email. If the inspector needs a correction or another item, the onsite inspection report gives the details and the inspector’s contact information.

For a project that needs a certificate of occupancy or completion, use the Town’s separate closeout checklist to discuss the applicable documents early. It lists a final survey, an elevation certificate and a final walkthrough with the Community Development Director.

Sources: [2] Open CAP — apply, check a project or schedule an inspection; [6] Town inspection scheduling and results instructions; [19] Town of Lake Park wind map and inspection provisions; [23] Lake Park checklist for a certificate of occupancy or completion

Drawings for the Lake Park application

Pineland Engineering can prepare the mechanical drawings and calculations that accompany Lake Park’s new A/C installation checklist.

For a building addition with grading changes, Pineland can coordinate the building drawings with the site elevations and drainage plan so the Building Division and the floodplain administrator see the same footprint. An applicant seeking help with a revision can share the CAP project number, the submitted sheets and the Town’s comments with Pineland.

Sources: [2] Open CAP — apply, check a project or schedule an inspection; [9] Town checklist for air-conditioning installations and replacements; [17] Lake Park floodplain ordinance, Chapter 60

What Do People Ask About Lake Park Building Department?

What size backyard shed can be built in Lake Park?

Lake Park’s resident guide says a storage shed requires a building permit. It limits sheds to 144 square feet, with maximum heights of 8 feet inside and 12 feet outside. The guide allows them in side or rear yards. Check the proposed location with Town zoning before ordering a shed.

Can a small home improvement in Lake Park qualify for a permit exemption?

For a single-family dwelling, Florida Statutes § 553.79(1)(g) allows the owner or contractor to request an exemption for eligible work valued below $7,500. It excludes electrical, plumbing, structural, mechanical and gas work, and any property even partly in a flood hazard area. A project cannot be split to qualify. Submit a written request to Lake Park with the contract or other documentation of the scope and value.

How soon should a Lake Park applicant hear back after filing?

The Town’s CAP guide gives 24 to 48 hours for a staff email after submission. That window covers the initial reply. To plan a construction start, use the CAP project number to ask (561) 881-3318 about the remaining review time for that application.

Which number handles a Lake Park permit revision or a failed inspection?

For a revision or a reinspection fee, contact the permit counter at (561) 881-3318. For a question about what needs correcting onsite, use the inspector contact on the report. Lake Park’s general inspection inquiry line is (561) 486-0477.

Does Lake Park handle Lake Clarke Shores building permits?

Palm Beach County lists Lake Park and Lake Clarke Shores as separate towns. Use the Lake Clarke Shores entry in the County’s municipality directory to reach the town responsible for a parcel there.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.