Lauderdale Lakes Building Department

Pineland Engineering prepares permit-ready construction documents for Lauderdale Lakes, Broward County, Florida projects and coordinates directly with the Lauderdale Lakes Building Department during plan review — so you get your permit faster.

Quick Answer

The Lauderdale Lakes permit counter is open Monday through Thursday, 8:00 a.m. to 4:30 p.m. On Fridays, call the division or email [email protected]. For an inspection on an issued permit, open the city’s Building Inspections page and follow its Online Payments Portal link.

The City of Lauderdale Lakes Building Safety Division handles building permits, plan review and inspections for properties inside the city. Apply through Lauderdale Lakes OpenGov, call 954-535-2480, or visit Building Development Services at 3521 NW 43rd Avenue, Lauderdale Lakes, FL 33319.

Where Can I Verify the Official Requirements?

Where to file in Lauderdale Lakes

For a parcel near Lauderhill or Oakland Park, locate the site on the city’s floodplain map and look for the line labeled Lauderdale Lakes Municipal Boundary.

If the parcel sits along that line, give Building the job address and tax folio before opening a city application.

For an address inside the boundary, select Online Permits on the city’s Building page.

A first-time OpenGov user can select Sign Up, choose Sign up using Secure Portal and verify the account by email. Use the email address of the person who will follow the application. The city’s Permitting Process page still refers to delivering drawings and paying in person. Development Services now lists uploads, status checks and payments in OpenGov. If Building requests a paper item for a particular application, confirm what to bring to the counter.

Broward County approvals can be a separate step. For example, if Building asks for an asbestos certificate or a transportation concurrency review, use the instructions on Lauderdale Lakes’ ePermits OneStop page.

Ask which county approvals the city needs for the proposed work before sending the same plans to both offices.

Sources: [2] Contact Building Development Services (hours checked Nov 23, 2026); [1] Apply or check an application in Lauderdale Lakes OpenGov (checked Nov 23, 2026); [7] Development Services divisions and online payments; [8] City guide to creating an OpenGov account; [14] City floodplain and municipal boundary map; [9] Broward County ePermits OneStop instructions for Lauderdale Lakes; [10] Broward County Uniform Building Permit Application; [6] City filing instructions and Wednesday Professional Day

Which application and drawings to prepare

Open the Broward County Uniform Building Permit Application from the city’s Building page.

Pick the trade, enter the job address, tax folio and value of the work, and describe the proposed change. For a tenant renovation, fill in both the present use and the proposed use. The city calls for a completed, notarized application with its supporting documents and publishes separate checklists for contractors and owner-builders.

Use Building Documents to find the packet for the work described on that form.

For an air-conditioning replacement, look for the A/C Change Out Checklist and A/C Uniform Data Form. For a window replacement, start with the retrofit instructions and Window Form. A contractor should check city registration before applying. An owner applying as an owner-builder can find the city’s affidavit in the same document list.

The city routes re-roofing, interior plumbing repairs and A/C changeouts directly to Building.

An addition that changes the exterior takes a different route. Bring the current survey to Planning and Zoning to check the proposed footprint against setbacks and easements. For a single-family room addition, the city requires a building permit and bars construction over utility or drainage easements. Mark those areas on the survey before deciding how far the room can extend.

Sources: [6] City filing instructions and Wednesday Professional Day; [10] Broward County Uniform Building Permit Application; [3] Download city permit forms and trade checklists; [11] Building Division application checklist and review times; [13] Planning and Zoning guidance for single-family lots

How to read the plan review fee table

Use the job value entered on the Broward application to find the appropriate row in section 1301(c) of the city’s Building Fee Schedule.

Read across that row for the review round. For an estimated value of $10,001 to $25,000, the table lists $125 for the first review and $80 for a second review. The initial review payment is nonrefundable and is separate from the permit fee.

Watch for an email from Building with the application number and a link for the initial payment.

The city starts plan review after that payment. If a reviewer requests changes, follow the resubmission instructions and look for the Corrections Cover Sheet in Building Documents. For a question about a drawing, the city sets aside Wednesday from 8:00 a.m. to noon for construction and design professionals to speak to a plans examiner on a walk-in basis. The permit can be issued once the applicable reviewers have approved the application and the permit fees are paid.

Sources: [4] Look up the city’s building fee schedule; [12] Building Section notice on the initial review payment; [10] Broward County Uniform Building Permit Application; [3] Download city permit forms and trade checklists; [6] City filing instructions and Wednesday Professional Day; [11] Building Division application checklist and review times

What to check on the flood map and product approvals

The Broward permit form asks for the flood zone and base flood elevation.

Search the job address in FEMA’s Flood Map Service Center. For Lauderdale Lakes, FEMA’s community record gives July 31, 2024 as the effective map date. If the survey and the flood map raise a question about an addition, bring both to Development Services. The city keeps the flood studies and maps there under section 1402.3 of its land development regulations, updated by Ordinance 2024-010. If the floodplain administrator asks for the building’s market value, section 1409.4 excludes the land and other improvements on the parcel.

For a window or exterior door replacement, keep the product approval with the corresponding opening on the plans.

The city lists product approvals and energy calculations in its application checklist. Lauderdale Lakes falls within Broward’s High Velocity Hurricane Zone, so check the approval’s geographic coverage before choosing a product. For an application filed now, use the Florida Building Code, 8th Edition (2023), effective December 31, 2023. For a Lauderdale Lakes filing planned near year-end, the code transition date is December 31, 2026, when the 9th Edition (2026) takes effect.

Sources: [10] Broward County Uniform Building Permit Application; [18] Search FEMA flood maps by address; [15] FEMA community flood map record for Lauderdale Lakes; [16] City flood ordinance text and map repository; [17] City commission action on the flood ordinance; [11] Building Division application checklist and review times; [19] Broward Board of Rules and Appeals on hurricane-zone coverage; [20] Florida Building Commission effective date for the 8th Edition; [21] Florida Building Commission effective date for the 9th Edition

How to book the inspection and close the permit

Open Building Inspections and follow Online Payments Portal to request the visit.

The inspection page lists a 3:30 p.m. cutoff for the following business day and an inspection window of 8:00 a.m. to noon. The city’s older application guide gives a 3:00 p.m. cutoff. For a next-business-day visit, submit before the earlier time and confirm the date with Building before arranging access.

Leave the permit card and a job copy of the approved plans where the inspector can read them.

On approval, the inspector dates and initials the card. If the inspector identifies a deficiency, read the code section and the description on the notice before arranging the return visit. At closeout, ask Building whether the scope calls for a Certificate of Completion or a Certificate of Occupancy. For a residential occupancy request, use the Residential Certificate of Occupancy Checklist in Building Documents to assemble the paperwork.

Sources: [5] Schedule a building inspection; [11] Building Division application checklist and review times; [3] Download city permit forms and trade checklists

Drawings for a Lauderdale Lakes addition

For an owner deciding whether to extend a room into a side yard, Pineland Engineering can use the survey reviewed with Lauderdale Lakes Planning and Zoning to lay out the addition and detail its connection to the house.

If Building requests a change during plan review, share the city’s comment, the submitted drawing and the application number with Pineland so the revised sheet addresses the examiner’s question.

Sources: [13] Planning and Zoning guidance for single-family lots; [6] City filing instructions and Wednesday Professional Day

What Do People Ask About Lauderdale Lakes Building Department?

Can I visit the Lauderdale Lakes permit counter on Friday?

Plan an in-person visit to the NW 43rd Avenue counter Monday through Thursday. Development Services handles Friday inquiries by phone and email. Include the application number if the question concerns plans already in review.

How long does Lauderdale Lakes take to review a building permit?

The city’s December 2024 application guide gives a typical review of 2–4 days for small projects and 3 business days per review for large projects. For a planning reference, the city budget reports that review processing in fiscal year 2024–2025 averaged 10 business days for small projects and 20 for large projects. Give Building the permit type and application number for a current estimate before setting a start date.

Does a small shed need a building permit in Lauderdale Lakes?

Yes. City guidance for single-family lots requires a building permit for a new or replacement utility shed. The city allows a footprint up to 100 square feet and a height up to 8 feet. Check the proposed location on the survey as well as the dimensions. A utility, drainage or access easement rules out that location.

Can I enclose a Lauderdale Lakes patio that already has a solid roof?

A solid roof does not exempt the enclosure from the city’s building permit requirement. Take the survey and a sketch of the walls to Planning and Zoning so staff can see which part of the patio would become enclosed.

How do I check a permit or request a permit search?

For an application filed through Lauderdale Lakes OpenGov, sign in to view its status. For a records search, Building Documents lists the Permit Search Request form. Have the address and any known permit number handy when contacting the NW 43rd Avenue office.

Does Lauderdale Lakes handle permits for Lauderdale-by-the-Sea?

Lauderdale-by-the-Sea has its own town Building Division and permit service. If the job is in that town, follow the Lauderdale-by-the-Sea guide. The OpenGov link here serves the City of Lauderdale Lakes.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.