Quick Answer
For a new permit, use the [Building Department website](https://www.margatefl.com/196/Building) to [download the package for your project](https://margatepermits.com/), then [file your application in ProjectDox](https://margate-fl-us.avolvecloud.com/Portal/). For an inspection on an issued permit, use the number printed on your permit card to choose between WebPermits and the city’s automated phone line. Office and portal details checked November 23, 2026.
The City of Margate Building Department is at 901 NW 66th Avenue, Margate, FL 33063. The permit counter answers at 954-970-3004 and opens Monday through Friday from 7:30 a.m. to 5:30 p.m.
Where Can I Verify the Official Requirements?
- City of Margate Building Department and permit window
- Margate ProjectDox login, project status and screening times
- Margate permit applications and forms
- Margate inspection scheduling and WebPermits access
- Margate building permit fee schedule, effective July 1, 2026
- Margate utility shed permit checklist and zoning limits
- Margate building permit submittal requirements
- Margate ProjectDox building file naming guide
- Margate ProjectDox applicant user guide
- Margate instructions for checking permit progress
- Margate online and counter payment options
- Margate plan review, inspections and closeout
- Margate residential building permit exemption requests
- Margate permit lookup instructions for property owners
- Margate window, door, garage door and shutter permit checklist
- Florida Statutes § 713.135 — Notice of Commencement and inspection filing
- Margate building permit extension request
- Margate Development Review Committee
- Margate site plan application checklist and Section 40.302
- Margate Development Services site plan review timetable (last page)
- Margate floodplain office, flood map and forms
- Margate flood map update, Elevation Certificates and CRS class
- FEMA final flood map determination for Margate and Broward County
- Margate comprehensive plan and municipal boundaries
- Broward County Building Code Division jurisdiction
- Florida Building Commission materials on the HVHZ definition
- Florida Building Commission code edition and effective date
- Florida Building Commission report on the 9th Edition effective date
Check the municipality before opening a permit
Margate takes building applications for properties inside city limits.
Coconut Creek borders the city to the north and east, Coral Springs to the north and west, and North Lauderdale to the south. For a lot near a boundary, use the Broward Property Appraiser link on the department website to check the parcel. Broward County’s Building Code Division serves unincorporated areas and cities that contract with it.
Some projects need both Margate and Broward review. For example, the city asks for proof of Broward environmental approval for an interior commercial alteration.
Use Broward ePermits for that review and Margate ProjectDox for the building application.
Sources: [1] City of Margate Building Department and permit window; [2] Margate ProjectDox login, project status and screening times; [24] Margate comprehensive plan and municipal boundaries; [25] Broward County Building Code Division jurisdiction; [7] Margate building permit submittal requirements
Prepare the Broward application for Margate
Open Margate’s Permit Applications & Forms page and choose the checklist for your scope.
An interior alteration and a building addition have different packets. Margate accepts the Broward County Uniform Application revised January 8, 2026 for new filings, effective March 9, 2026. Copy the folio number from the tax bill and enter the job address again at the top of page two. Check the signature and notary blocks before uploading. If a contractor will file, the forms page lists state qualifications and certificates of competency approved by the Broward County Central Examination Board.
Use the project checklist to assemble the attachments. For example, Margate’s utility shed packet asks for proof of the cost of labor and materials.
A contractor can use the signed contract. A homeowner acting as contractor uses the owner-builder cost verification form and supplies a notarized owner-builder affidavit and proof of residency at the job address.
Sources: [3] Margate permit applications and forms; [7] Margate building permit submittal requirements; [6] Margate utility shed permit checklist and zoning limits
Upload drawings and answer review comments in ProjectDox
Sign in, select the building permit type and give the project a unique name.
Open the Upload and Submit task from the city’s email. Margate’s file naming guide lists the building application as APP B in the Application_Cost Verification folder. For architectural sheet A1, the corresponding filename is ARCH-A1 in Drawings. Save each drawing sheet as a separate PDF and click Submit in the task when the files are in place.
Margate estimates 1 to 3 business days for pre-screening after you submit the required files.
When that check is complete, the city emails you and assigns the plans to technical review. For the current review time on your project, check the outstanding disciplines under Manage/View Existing Projects and ask the permit counter about those reviews. If you receive a Respond and Resubmit task, open the marked-up drawing, enter your reply in the Applicant Response column, upload the revised sheet and submit the task.
Sources: [2] Margate ProjectDox login, project status and screening times; [8] Margate ProjectDox building file naming guide; [9] Margate ProjectDox applicant user guide; [12] Margate plan review, inspections and closeout
Read the fee schedule and pay the permit balance
Margate’s schedule effective July 1, 2026 credits the $75 nonrefundable application fee toward the permit fee.
For plan examination, the first review is $75 for each discipline. Each review after the second submittal is $90 per discipline. For replacement windows, look under Windows, Doors & Garage Doors. That entry uses the total construction cost to calculate the fee, with a $75 minimum. Check which other entries apply before budgeting from the window fee alone.
Margate accepts Visa and MasterCard for online permit payments through Click-2-Gov.
If you pay at the counter on NW 66th Avenue, the weekday payment window ends at 5:00 p.m., half an hour before the permit counter closes.
Sources: [1] City of Margate Building Department and permit window; [5] Margate building permit fee schedule, effective July 1, 2026; [11] Margate online and counter payment options
Book the inspection shown on your permit card
For permit numbers after 23-2124, schedule through Margate WebPermits.
For numbers before 23-2124, call 954-970-3112 and leave the permit number, job address, inspection type, your name and callback number. For 23-2124 itself, ask the counter which service to use. The automated line’s cutoff is 2:00 p.m. for the next available business day. Friday inspections are by appointment and must be called in by 2:00 p.m. the preceding Wednesday.
Margate’s forms page includes the Notice of Commencement. Under Florida Statutes section 713.135, file a copy with Margate before the first inspection if the direct contract exceeds $5,000.
The clerk’s recording instrument number is one accepted way to identify the notice. The subsection excludes direct contracts under $15,000 to repair or replace an existing heating or air-conditioning system.
On inspection morning, the permit holder can call from 7:30 to 8:00 a.m.
for a time window. Post the permit card, approved plans and any previous red tags at the front of the job site. Arrange inspections in order while the work is visible. Margate issues the applicable Certificate of Completion or Certificate of Occupancy after the required inspections and closeout documents are complete. Margate’s extension form gives two deadlines to watch. The permit expires if work has not started within 180 days of issuance, or if it starts and is then suspended or abandoned for 90 days. File the Building Permit Extension Request before expiration.
Sources: [1] City of Margate Building Department and permit window; [4] Margate inspection scheduling and WebPermits access; [3] Margate permit applications and forms; [12] Margate plan review, inspections and closeout; [16] Florida Statutes § 713.135 — Notice of Commencement and inspection filing; [17] Margate building permit extension request
File a site plan or amendment with Development Services
For a site plan, amendment or change of occupancy, email [email protected] about the preliminary and pre-application meetings required by Margate’s Development Review Committee.
File the site plan application and payment under Development Services in ProjectDox. The checklist calls for proof of ownership and a boundary survey showing existing buildings, paving and recorded easements.
Margate’s site plan checklist cites section 40.302 of the city code.
A new parking area, a change of use or a substantial modification to existing parking calls for a master parking plan. If you are changing a driveway, show how vehicles will enter and circulate through the revised lot. Margate’s site plan process diagram gives a minimum of 90 days and ties its estimates to the meeting schedule.
Sources: [2] Margate ProjectDox login, project status and screening times; [18] Margate Development Review Committee; [19] Margate site plan application checklist and Section 40.302; [20] Margate Development Services site plan review timetable (last page)
Window paperwork and flood records for a Margate address
Margate lists window replacement as permit work. Its checklist calls for a wind-load design pressure chart, the county retrofit schedule and a placement plan identifying each opening by size and location.
Mark which windows fit existing openings and which require a new or resized opening. On the product approval or Miami-Dade Notice of Acceptance, circle the entries for the product you will install.
Broward County, including Margate, falls within the Florida Building Code’s High-Velocity Hurricane Zone.
For a Margate window application today, use the 8th Edition (2023), effective December 31, 2023. December 31, 2026 is the effective date for the 9th Edition (2026), so check the intended filing date when preparing your Margate packet.
Margate’s revised Flood Insurance Rate Map took effect July 31, 2024.
The city reports that one property moved from zone X to AE and lists Margate as Class 6 in FEMA’s Community Rating System. For a written determination on your property, email the Request for Flood Zone Determination form on the city’s Flood Information & Maps page to [email protected]. Environmental and Engineering Services can check for an Elevation Certificate on file at 954-972-0828.
Sources: [24] Margate comprehensive plan and municipal boundaries; [15] Margate window, door, garage door and shutter permit checklist; [26] Florida Building Commission materials on the HVHZ definition; [27] Florida Building Commission code edition and effective date; [28] Florida Building Commission report on the 9th Edition effective date; [7] Margate building permit submittal requirements; [21] Margate floodplain office, flood map and forms; [22] Margate flood map update, Elevation Certificates and CRS class; [23] FEMA final flood map determination for Margate and Broward County
Drawings for a Margate submittal
For a window you plan to widen, Pineland Engineering can use your opening measurements and product selection to coordinate the placement plan with the proposed framing detail.
For a Margate site plan, Pineland can prepare grading and drainage drawings showing how proposed pavement and floor elevations relate to the drainage structures on the city’s checklist.
Sources: [19] Margate site plan application checklist and Section 40.302; [15] Margate window, door, garage door and shutter permit checklist
Free Florida Engineering Tools
Related Resources
What Do People Ask About Margate Building Department?
What is the phone number for the City of Margate Building Department?
Call 954-970-3004 or email [email protected]. For a trade-specific question, the department lists inspector phone hours of 7:00–8:00 a.m. and 4:00–5:00 p.m., Monday through Thursday. The Building Official sees visitors by appointment.
Does a small backyard shed need a Margate permit?
Yes. Margate lists sheds as permit work. Its utility shed checklist gives a maximum of 144 square feet, a height limit of 8.5 feet and one shed per residence under section 3.20. Mark the proposed spot on a current survey showing easements and elevations. Ask Margate Zoning at 954-979-6213 about setbacks before buying the shed.
How do I request a minor residential work exemption in Margate?
Margate’s exemption covers qualifying single-family work valued under $7,500 for the whole project. Electrical, plumbing, mechanical, gas and structural work are excluded, as are properties even partly in a flood hazard area. Submit the city’s written request with a contract or documentation of scope and value. Margate charges $75 per exemption.
How do I look up a Margate permit by address?
On the department website, open Pay and Track Building Permit, choose Select Permit and enter the job address. If you filed the application yourself, open it in ProjectDox under Manage/View Existing Projects and select Project Reports to see review progress.