Medley Building Department

Pineland Engineering prepares permit-ready construction documents for Medley, Miami-Dade County, Florida projects and coordinates directly with the Medley Building Department during plan review — so you get your permit faster.

Quick Answer

The Medley counter opens at 7:00 am Monday through Thursday. It closes at 5:00 pm Monday through Wednesday and at 4:30 pm Thursday. The office is closed Friday. For a new filing, use the Town’s Permit Application and confirm delivery with [email protected]. For an existing permit, use Schedule an Inspection on Medley’s BS&A Online portal. Office and portal details checked November 23, 2026.

The Town of Medley Building and Zoning Department handles building permits and inspections within town limits. For permit help, call 305-887-6913 or visit 7777 NW 72nd Ave, Medley, FL 33166.

Where Can I Verify the Official Requirements?

Check the folio before filing in Medley

Look up the job address in the Miami-Dade Property Appraiser’s Property Search.

The first two digits of the property’s folio identify its municipality. Look for 22 for Medley. A folio beginning with 27 identifies Hialeah Gardens, 35 identifies Doral and 30 identifies unincorporated Miami-Dade. Copy the full folio from the property record into the Medley application once the municipality matches.

If the job already has a permit, open the Town of Medley page on BS&A Online.

Select Building Department Record Search to look for the permit, or Pay a Building Department Fee to look up a payment. The portal also displays Apply for a Permit, but its Medley application screen reported that new applications were disabled when checked. Contact the counter for the current way to deliver a new package.

Sources: [7] Miami-Dade Property Appraiser folio lookup and municipal codes; [3] Town of Medley building permit application; [5] Medley BS&A Online — find a permit or pay a building fee; [6] Town of Medley permit application status on BS&A Online; [1] Town of Medley Building and Zoning Department

Assemble the application and plan files

Start with the Town’s Permit Application. Enter the project address, current use of the property and a description of the proposed work.

Medley’s submission instructions call for the application with the required signatures and notarizations, documentation of ownership or signing authority, and a contact sheet. The department’s forms list includes the Medley Contact Sheet, Contractor Registration and Owner-Builder Affidavit. Ask which forms apply to the person filing.

Set up the drawings for Medley’s trade reviewers. Its file instructions specify 11 × 17 PDFs, flattened to a single layer, without password protection.

Merge all the electrical sheets into one electrical PDF, for example, and keep the mechanical sheets in their own file. For a correction during review, send only the affected sheets. Keep the original file name and add the rework date so the reviewer can match the correction to the first submission. For a revision or shop drawing on an existing permit, the Town has a separate form with spaces for the master and subsidiary permit numbers.

Sources: [3] Town of Medley building permit application; [8] Town of Medley permit file and resubmittal instructions; [1] Town of Medley Building and Zoning Department; [9] Town of Medley revisions and shop drawings application

What to budget at application

Use the fee schedule linked at the top of the Town’s department page, effective July 6, 2026.

It lists minimum building permit fees of $225 for commercial work and $175 for residential work. For a commercial alteration, the schedule sets the fee at 3% of job value with a $225 minimum. The commercial alteration entry includes general electrical, mechanical and plumbing permit fees. Later sub-permits that require additional reviews carry charges under the schedule.

Medley lists a nonrefundable processing fee of 20% of the permit fee when it receives the application.

Use the permit fee as the basis for that calculation. The schedule lists state and county surcharges separately. For a warehouse build-out, give the counter the job value and identify the trades included in the master application so it can tell you what is due at intake.

Sources: [4] Medley fee schedule effective July 6, 2026

Get on the site plan agenda or verify a business use

For projects going to development review, call Building and Zoning for the next meeting date.

The site plan checklist calls for the plans, supporting material, application and applicable fees at least seven business days before the meeting. It specifies three 11 × 17 sets and an emailed set for [email protected]. Check the survey date before making copies. Medley’s checklist calls for a survey less than six months old and asks for plans showing how vehicles will park and circulate on and around the property.

For a tenant deciding whether a warehouse can accommodate a proposed business, start with Medley’s Zoning Verification Form.

Wait for the Town’s email about the proposed use before proceeding. If zoning allows the business, the Town’s licensing instructions take the applicant through a Miami-Dade County Certificate of Use and Annual Fire Permit before the Medley Certificate of Use and Business Tax Receipt. For construction that also needs county review, Medley’s permitting guide identifies county environmental and fire review and sends changes back to the Town for final review.

Sources: [11] Town of Medley zoning and construction permitting guidelines; [10] Town of Medley site plan application and checklist; [12] Town of Medley Certificate of Use and Business Tax Receipt instructions

Inspection days and the final certificate

Choose Schedule an Inspection on Medley’s BS&A page and match the request to the trade.

The Town lists building inspections Tuesday through Thursday. Electrical inspections run Tuesday and Wednesday. Roofing, plumbing and mechanical inspections run Tuesday and Thursday. If the scheduling system is down, email [email protected] or call 305-887-6913. The Town asks for 24 hours’ advance notice. Send zoning final requests directly to the department email.

For new residential or commercial construction, Medley issues the final Certificate of Occupancy once construction is complete and all building inspections have approval.

Before scheduling finals, check the Town’s occupancy checklist for the final as-built survey, elevation certificate where applicable and final approval from Miami-Dade Fire. Keep the fire approval with the closeout documents so it is available when requesting the certificate.

Sources: [2] Town of Medley inspection scheduling on BS&A Online; [1] Town of Medley Building and Zoning Department; [14] Town of Medley occupancy and completion certificate checklist

Flood maps for a Medley site

Call Medley’s Floodplain Administrator at 305.887.9541 for a parcel-specific map question.

On the Town’s Flood Zone Information Request, enter the street address and folio and request a copy of the map. The form has fields for the panel number, map date and base flood elevation. Medley also links to elevation certificates on file in its public records library.

Check the map date if the design will span the next revision.

The current base maps took effect September 11, 2009, and FEMA lists Medley in the map change effective February 19, 2027. Under Medley Code section 30-35, when a proposed structure crosses flood hazard zones, the most restrictive zone that touches the structure applies. Bring a drawing of the footprint when asking the administrator to interpret a zone boundary. FEMA’s Class 9 Community Rating System entry applies townwide. Use the panel and building footprint to identify the flood zone for an individual property.

Sources: [15] Town of Medley flood information and Floodplain Administrator; [16] Town of Medley Flood Zone Information Request; [18] Miami-Dade County effective FEMA flood maps; [17] Town of Medley flood damage prevention ordinance, official Municode copy; [19] FEMA final flood hazard determination including the Town of Medley; [20] OpenFEMA NFIP Community Status Book record for the Town of Medley

Roofing plans and the code change

Medley falls within Miami-Dade’s High-Velocity Hurricane Zone.

The Town’s roofing owner notification asks the contractor to explain issues such as whether the existing wood roof deck needs renailing. For a Medley roofing application filed now, the Florida Building Code, 8th Edition (2023), applies. It took effect December 31, 2023. For work scheduled around year-end, check the filing date against the published 9th Edition (2026), which takes effect December 31, 2026.

Sources: [21] Town of Medley HVHZ roofing owner notification; [22] Florida Building Commission High-Velocity Hurricane Zone definition; [23] Florida Building Commission current code effective date; [24] Florida Building Commission code resources and next effective date; [25] Florida Building Commission published code resources

Drawing support for a Medley submittal

Pineland Engineering can prepare the architectural and engineering sheets for Medley’s trade-by-trade review.

For a warehouse alteration, that can include matching equipment locations on the mechanical and electrical sheets. For a Medley site plan, Pineland can show the parking layout and drainage together so the applicant can compare them with the vehicle circulation and drainage items on the Town’s checklist.

Sources: [1] Town of Medley Building and Zoning Department; [8] Town of Medley permit file and resubmittal instructions; [10] Town of Medley site plan application and checklist

What Do People Ask About Medley Building Department?

Where is Medley in Florida, and which building office serves it?

Medley is in northwest Miami-Dade County. For a property with a Medley folio prefix of 22, the Town’s building permit counter is at 7777 NW 72nd Ave.

Can I submit a new Medley building permit on BS&A Online?

The Medley application screen showed new filing was disabled on November 23, 2026. Download the Permit Application from the Town and call 305-887-6913 for delivery instructions. The Town directs inspection requests to BS&A.

How does Florida’s permit review deadline apply to a Medley reroof?

If the roofing work costs less than $15,000, the home is an existing single-family dwelling and Medley’s own reviewer handles the plans, Florida Statutes section 553.792 gives the Town five business days from receipt of a complete and sufficient application. The Town can approve, approve with conditions or deny it. The applicant can waive the deadline in writing. For a warehouse roof, give Medley the building type and scope and ask which review period applies.

Which day can I request both electrical and plumbing inspections in Medley?

Tuesday is the common day on Medley’s published electrical and plumbing schedules. Use the BS&A inspection link for each trade and confirm the requested appointments before arranging site access.

Does a building permit exemption cover floodplain development in Medley?

Medley Code section 30-34 requires a development permit before activity covered by its flood ordinance, including development exempt from the Florida Building Code. Give the Floodplain Administrator the folio and a description of the planned work so the Town can check the ordinance against the site.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.