Quick Answer
For online permit records, open E-Services at eportal.northmiamifl.gov, then choose Citizen Services and Permits and Inspections. Before filing a new application, check the Building Department notice. On November 23, 2026, the city warned that online applications could fail and directed emergency applicants to the NE 8th Avenue counter. For other digital filings, email [email protected] for instructions.
For permits inside the City of North Miami, visit the North Miami Building Department at 12340 NE 8th Avenue, North Miami, FL 33161, or call 305-895-9820. Office hours are Monday through Friday from 7:30 AM to 3:30 PM, but the building permit application lists a 3:00 PM cutoff for permitting.
Where Can I Verify the Official Requirements?
- North Miami Building Department — office, contacts and application notices
- North Miami E-Services portal
- North Miami Request for Inspection form
- North Miami permit fee schedule, revised June 2026
- North Miami E-Services Permits and Inspections
- Miami-Dade County permitting jurisdiction and boundary map
- Miami-Dade County directory of northeastern municipalities
- North Miami Online Permitting Guidelines
- City instructions for applying through E-Services
- North Miami permit forms and project checklists
- City building permit application and counter intake hours
- North Miami contractor registration checklist
- North Miami addition intake checklist and review routing
- North Miami window, door and shutter submittal checklist
- Miami-Dade County legislative report on the High Velocity Hurricane Zone
- City instructions for the single-family permit exemption request
- Owner/builder affidavit and disclosure statement
- Florida Statutes § 553.792, local building permit decisions
- North Miami Flood Hazard Information and floodplain contacts
- North Miami ordinance index and floodplain administrator amendment
- Miami-Dade County effective FEMA flood maps
- North Miami flood hazard guide
- North Miami Forerunner flood risk portal guide
- North Miami inspection procedures and trade schedules
- North Miami milestone recertification forms and guidance
- City of North Miami Permit Search requests
- Florida Building Commission current code effective date
- Florida Building Commission upcoming code effective date
- Miami-Dade building recertification deadlines and inspection cycles
Which North Miami office handles the address?
Look up the job site on Miami-Dade County’s Government Boundaries Map before choosing a portal.
A parcel inside North Miami goes through this city. North Miami Beach and Biscayne Park each handle building permits within their own boundaries. If the map places the address in unincorporated Miami-Dade, start with the county. For a question about an address on the North Miami side, send the address and proposed work to [email protected].
Sources: [6] Miami-Dade County permitting jurisdiction and boundary map; [7] Miami-Dade County directory of northeastern municipalities; [1] North Miami Building Department — office, contacts and application notices
Choose the filing route before preparing the application
For a contractor filing online, North Miami lists stand-alone electrical work, plumbing, and window or door replacements, along with residential or commercial roofs and small interior renovations such as kitchens and bathrooms.
Bring additions, new construction and owner-builder applications to the counter. The city’s Forms & Permits page has the general building application and a separate form for right-of-way or utility permits.
Contractors should complete North Miami registration before filing.
The checklist asks for photo ID, an active state contractor license, a local business tax receipt and workers’ compensation coverage or an exemption certificate. Check the general liability certificate before sending it. The city must appear as certificate holder and the certificate must be valid for at least six months. Registration questions go to [email protected].
When digital intake is available, log in to E-Services, select Permits and Inspections, then Apply for a Permit.
Choose the permit type, describe the scope, enter the site address and application details, and pay the upfront fee. Watch the contact email for the city’s upload link. Use that link for clearly labeled PDFs. Check the application for notarization, the estimated job cost, the work description and the contractor’s contact information before uploading it.
Sources: [8] North Miami Online Permitting Guidelines; [10] North Miami permit forms and project checklists; [12] North Miami contractor registration checklist; [9] City instructions for applying through E-Services; [1] North Miami Building Department — office, contacts and application notices
What goes in a house addition packet?
North Miami’s Addition Checklist asks for a recorded warranty deed and cost affidavit.
Bring the survey and check its date. The city calls for a survey affidavit if the survey is more than a year old. On the site plan, show where the addition meets the existing building. On the floor plan, show the entire house as well as the area being improved. Include elevations showing finished floor levels and two copies of the applicable product approvals.
File the individual trade applications with the building application.
The checklist also lists Miami-Dade Environmental Resources Management approval. City reviewers include zoning, flood, landscaping and engineering as well as the building trades. Match each trade application to the work shown on the floor plan so the reviewers can follow the same scope across the packet.
Sources: [13] North Miami addition intake checklist and review routing
Window and door permits by number of openings
North Miami falls within Miami-Dade’s High Velocity Hurricane Zone.
For a window, door or shutter permit, mark the means of egress on the floor plan and give each opening a matching entry on the schedule. Beside each opening, identify the Notice of Acceptance number for the proposed product, including a mullion where applicable. For buildings of two stories or more, North Miami’s checklist calls for both positive and negative wind pressures at each opening under ASCE 7-22. For commercial and multifamily properties, the checklist also lists Miami-Dade Fire approval. For condo work, the permit holder must obtain board approval before starting.
Count the openings before consulting the city’s fee schedule.
Its residential window, door and shutter fee is $262 for up to 10 openings and $350 for more than 10. The schedule allows additional structural review fees. At application, the general upfront fee is $45 per review discipline, with additional structural or floodplain review charges where applicable. The city credits the upfront fee toward the permit fee at issuance. For a project with other development charges, the department posts separate impact and mobility fee schedules.
Sources: [14] North Miami window, door and shutter submittal checklist; [15] Miami-Dade County legislative report on the High Velocity Hurricane Zone; [4] North Miami permit fee schedule, revised June 2026; [1] North Miami Building Department — office, contacts and application notices
Flood records to check before designing an addition
Enter the site address in North Miami’s Forerunner flood portal to find the flood zone, base flood elevation and any elevation certificate on file.
Miami-Dade lists September 11, 2009 as the effective date of its current FEMA maps. For proposed work in a Special Flood Hazard Area, North Miami directs applicants to request a Floodplain Development Permit under Chapter 8.5 and advises that an elevation certificate may be needed.
For a renovation, compare the estimated project cost with the building’s market value.
North Miami’s flood guide sets its substantial improvement or damage threshold at 45% and identifies the city as Class 6 in the Community Rating System. Forerunner also has records of past improvements and damage. Take the estimate and parcel information to the Floodplain Management Team at 305-895-9825 to ask how the city will evaluate the project. Section 8.5-3 of the city code identifies the floodplain administrator’s duties.
Sources: [19] North Miami Flood Hazard Information and floodplain contacts; [20] North Miami ordinance index and floodplain administrator amendment; [21] Miami-Dade County effective FEMA flood maps; [22] North Miami flood hazard guide; [23] North Miami Forerunner flood risk portal guide
Request the inspection and find the time window
Use North Miami’s Request for Inspection form with the permit number, property address, inspection type and on-site contact details.
Enter any gate or access instructions there so they appear on the inspector’s worksheet. Look for the scheduling confirmation by email. For building, roofing and plumbing, the city posts the daily schedule with time windows. The building schedule goes up after 5:00 PM the day before. Mechanical inspections run Monday, Wednesday and Friday from 9:00 AM to noon.
For a question about a scheduled trade inspection, email [email protected].
For an owner who has received a building recertification notice, Miami-Dade gives owners 90 days from the date of notice to submit the reports. The county’s initial inspection comes at 25 years for condo and co-op buildings built in 1998 or later that are at least three stories tall and within three miles of the coast. Those inspections recur every 10 years. Use North Miami’s Milestone Recertification page for the structural and electrical report forms, along with parking lot guardrail and lighting forms. If the owner believes the building qualifies for an exemption, the city asks for a written request to the Building Official.
Sources: [24] North Miami inspection procedures and trade schedules; [3] North Miami Request for Inspection form; [25] North Miami milestone recertification forms and guidance; [29] Miami-Dade building recertification deadlines and inspection cycles; [1] North Miami Building Department — office, contacts and application notices
Drawing an addition for North Miami review
Pineland Engineering can prepare the site plan showing the new footprint and coordinate the roof framing with the wall sections where the addition joins the house.
An owner with an existing survey or review comments can share those with Pineland so the floor plan, elevations and trade drawings describe the same work that North Miami will review.
Sources: [13] North Miami addition intake checklist and review routing
Free Florida Engineering Tools
Related Resources
What Do People Ask About North Miami Building Department?
Can a homeowner pull a North Miami permit?
An eligible owner-builder can file in person. For a one- or two-family home, North Miami’s disclosure form describes an exemption for the owner’s own use and occupancy and requires direct, on-site supervision. The exemption excludes homes built or substantially improved for sale or lease. Bring the Owner/Builder Affidavit & Disclosure Statement and discuss eligibility at the permit counter.
Does a small kitchen renovation qualify for a permit exemption?
North Miami accepts a written exemption request for qualifying single-family work valued below $7,500. Bring the contract or other evidence of scope and value. Electrical, plumbing, mechanical, gas and structural work fall outside this exemption, as does work on a property partly or entirely in a flood hazard area. Count the whole project when testing the dollar limit.
How long can review take for a North Miami residential roof permit?
For a roofing job valued below $15,000 on an existing single-family dwelling, Florida Statutes § 553.792 gives the city five business days to decide a complete and sufficient application when a local government plans reviewer handles the permit, unless the applicant waives the deadline in writing. The decision may include conditions or a denial. Ask the permit counter when it received the complete roof packet before booking the crew.
How can someone look up a North Miami permit?
For details about a particular permit, register or log in on the city’s E-Services Permits and Inspections page. To request a search of building permits for an address, use the online request on the city’s Permit Search page. The Building Department handles those property searches.
Which code edition applies to a North Miami window application?
For a North Miami window packet filed now, use the Florida Building Code 8th Edition (2023), effective December 31, 2023, with the city’s opening checklist. For a year-end replacement, confirm the filing date with the counter because the 9th Edition (2026) takes effect on December 31, 2026.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.