Opa-locka Building Department

Pineland Engineering prepares permit-ready construction documents for Opa-locka, Miami-Dade County, Florida projects and coordinates directly with the Opa-locka Building Department during plan review — so you get your permit faster.

Quick Answer

For a new permit, download the Permit Application from the city’s Building & Licenses page and bring the complete application to the intake counter. For a property purchase, use the Open Permit Search form on that same page to request a search by parcel. Office details and filing instructions checked November 23, 2026.

Opa-locka’s Building and Licensing Department accepts building permit applications at 780 Fisherman St., Opa-Locka, FL 33054. The counter is open weekdays from 8 am to 4:30 pm, and the department can be reached at (305) 953-2868, option 4, or [email protected].

Where Can I Verify the Official Requirements?

Which office handles the property?

Check the first two digits of the folio before making a trip to Fisherman Street.

In the Miami-Dade Property Appraiser’s Property Search, enter the street address or the owner’s name. An Opa-locka parcel starts with 08. A folio starting with 04 belongs to Hialeah, which handles its own city permits. A 30 prefix puts the property in unincorporated Miami-Dade County, where the county accepts building applications through its permitting portal.

For an 08 parcel, the Building & Licenses counter is on the first floor of the Government Center on Fisherman Street.

The department issues building, electrical, mechanical, roofing and plumbing permits, as well as occupational licenses and certificates of occupancy. Its forms page includes a Fence Packet, a Window and Door Chart and a Roofing Packet. Choose the materials for the work at that address before filling out the main application.

Sources: [1] City of Opa-locka Building & Licenses — permit forms and counter contacts; [5] Miami-Dade Property Appraiser — folio numbers by municipality; [6] Miami-Dade County permit jurisdiction and folio lookup; [20] City of Opa-locka update on online permitting

What to bring to the Fisherman Street counter

On Opa-locka’s Permit Application, enter the job address and folio, then describe the present use of the property, the proposed work and its value.

The form distinguishes a master permit from a sub-permit and has separate choices for the trade and the improvement. For example, a roofer can identify both the roofing trade and a re-roof. For a project involving several trades, ask the counter which sub-permits go with the master application.

A contractor registering with Opa-locka should follow the checklist for the license they hold.

For a state license, the city lists a license copy, proof of liability insurance naming the City of Opa-locka as certificate holder, workers’ compensation coverage or exemption, the business tax receipt from the contractor’s business location and the qualifier’s driver’s license. The county-license checklist calls for a certificate of competency and lists both county and municipal business tax receipts.

Sources: [2] Opa-locka building permit application; [7] Opa-locka contractor registration checklist; [4] Opa-locka building permit FAQs and intake instructions

How to follow an application through zoning and plan review

After checking the application for completeness, Opa-locka assigns a process number and sends the file to Zoning.

Keep that number with the copy of the application. Zoning checks whether the district allows the proposed use and reviews setbacks, height and the flood zone. Once Zoning approves the application, plans examiners check the drawings against the Florida Building Code. The approved file then goes to permit processing, and the cashier collects any balance.

When following up, give Building & Licenses the process number and ask which review is pending and when to check back.

If the examiner requests a drawing change, ask whether to include the city’s Plans Revision Application. For an Opa-locka application filed now, the Florida Building Code 8th Edition (2023) applies. It took effect December 31, 2023. For a filing near year-end, plan around December 31, 2026, when the 9th Edition (2026) takes effect.

Sources: [4] Opa-locka building permit FAQs and intake instructions; [1] City of Opa-locka Building & Licenses — permit forms and counter contacts; [17] Florida Building Commission current code effective date; [18] Florida Building Commission code transition date

Roof permit fees and inspection stages

Opa-locka’s roofing fee sheet lists a $180.00 minimum. To use the sheet, enter the roof area under the category for the proposed system.

If the roof falls outside the listed categories, the packet directs the applicant to a building processor or inspector. Confirm the amount due for the specified system and area before paying.

Opa-locka lies in Miami-Dade’s High Velocity Hurricane Zone. The city’s roofing packet calls for the product’s Notice of Acceptance and the installation method with the application and at the job site for inspection.

The inspection sequence depends on the roof covering. For shingles, the sheet lists tin cap, shingle work in progress and final inspection. For low-slope roofing, it calls for an inspection while the anchor sheet is still visible. Use the row for the actual roof system when arranging each visit.

Sources: [9] Opa-locka roofing permit packet; [16] Florida Building Commission guidance on the High Velocity Hurricane Zone; [5] Miami-Dade Property Appraiser — folio numbers by municipality

Flood information for the city application

Two fields on the city form ask for the flood zone and base flood elevation.

Miami-Dade’s mitigation strategy dates the effective countywide Flood Insurance Rate Maps to September 11, 2009, and lists Opa-locka’s Building Official as the municipal floodplain contact. Give that office the 08 folio and any available survey when asking which map panel and revisions apply to the site. FEMA’s April 2025 Community Rating System table listed Opa-locka at Class 10. The map question for the permit is specific to the parcel.

Sources: [2] Opa-locka building permit application; [14] Miami-Dade Local Mitigation Strategy and municipal floodplain contacts; [15] FEMA Community Rating System eligible communities; [5] Miami-Dade Property Appraiser — folio numbers by municipality; [21] Florida Statutes section 553.79 — single-family permit exemption

Opening a business at an Opa-locka address

For a business moving into a storefront or warehouse, identify the intended use before committing to the layout.

Under City Code section 2-97, Opa-locka’s business application calls for a city Certificate of Use before a new local business tax receipt can be issued. The package lists a $150 city Certificate of Use fee and directs the applicant to wait for approval before sending payment.

The city’s occupational licensing instructions also include a county step.

After city zoning approval, pay the $25 fee and collect the water and sewer verification form. In Miami-Dade’s Electronic Permits & Reviews System, choose Certificate of Use, then Apply for a New Certificate of Use. Have the folio, business application and lease or warranty deed available. Return the county environmental review certificate to Opa-locka to continue the city license application.

Sources: [11] Opa-locka business license and Certificate of Use application; [12] Opa-locka DERM process for occupational licenses; [13] Miami-Dade County RER Electronic Permits & Reviews System (EPS)

Inspections for temporary occupancy or completion

For a temporary certificate, give the city representative the building permit number so they can identify unfinished trade permits and outstanding holds.

Opa-locka’s temporary certificate instructions give a specific cutoff for pending inspections. Call 305-953-2868 or email [email protected] before 3:00 p.m. the day before the inspection is needed. Keep the completed original temporary certificate application on site for the inspectors. Once the inspections have been approved for the temporary certificate and the holds are resolved, return the form to the Building Department.

Sources: [10] Opa-locka temporary completion or occupancy instructions

Where Pineland’s drawings fit in city review

For an addition on an 08 parcel, Pineland Engineering can show the proposed footprint and setbacks on the site plan and detail the connection to the existing building on the structural sheets.

If Opa-locka’s examiner asks for a change, send Pineland the comment, the drawing it refers to and the city process number. That gives the designer the information needed to match the revision to the application under review.

Sources: [4] Opa-locka building permit FAQs and intake instructions; [2] Opa-locka building permit application; [5] Miami-Dade Property Appraiser — folio numbers by municipality

What Do People Ask About Opa-locka Building Department?

Is Opa-locka part of Miami-Dade County?

Yes. Opa-locka is a municipality in Miami-Dade. The county’s folio list identifies Opa-locka with prefix 08, and the city handles building permits inside its limits.

Can an Opa-locka building permit application be filed online?

The city posts downloadable forms and directs applicants to file at the counter. Its fiscal year 2027 budget identifies electronic plan submission through a self-service portal as an objective. The county portal named in Opa-locka’s business licensing instructions handles the county Certificate of Use step.

How do I look up open permits on an Opa-locka property?

Submit the city’s Open Permit Search form by mail or at the Fisherman Street permit counter. It asks for the folio, owner, property address and legal description. Standard service costs $50.00 per folio and takes 5–7 business days from receipt. Rush service costs $100.00 per folio and lists a turnaround within 24 hours of receipt. For mailed requests, use the Utility Billing/Collection mailing address on the form.

Can an owner pull a permit in Opa-locka?

An eligible owner-builder can apply. Opa-locka’s disclosure describes direct, on-site supervision by the owner and work for the owner’s own use or occupancy. Its proof-of-ownership instructions accept a recorded deed and require the owner name and legal description to match the application. Review the disclosure with the department before choosing this route.

Does Opa-locka issue permits for sheds?

Opa-locka lists sheds among the accessory structures for which residents commonly request permits. Its application includes a Shed box. Bring the folio, proposed shed dimensions and location on the lot so Zoning can address the setbacks and height for that property.

Can a small project at an Opa-locka home qualify for a permit exemption?

Florida Statutes section 553.79(1)(g) covers qualifying work valued at less than $7,500 on a single-family owner’s property. Check the folio with Opa-locka first. Even partial overlap with a flood hazard area rules out this exemption, as does electrical, plumbing, structural, mechanical or gas work. The owner or contractor must submit a written request to the city with a contract or other evidence of scope and value. The law prohibits splitting a project to qualify.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.