City of Ormond Beach Building Division

Pineland Engineering prepares permit-ready construction documents for Ormond Beach, Florida projects and coordinates directly with the City of Ormond Beach Building Division during plan review — so you get your permit faster.

Quick Answer

The City of Ormond Beach Building Division is at City Hall, 22 South Beach Street, Room 104, Ormond Beach, FL 32174. Call 386-610-0540 Monday through Friday, 8:00 a.m. to 5:00 p.m., or email [email protected].

For an Ormond Beach permit application, payment or inspection request, open Tyler EnerGov Civic Access. To look up a permit, enter the street address, parcel number or permit number. The public record shows the permit history and status. The Building Division directory lists direct numbers for plans examiners, permit technicians and inspectors.

Where Can I Verify the Official Requirements?

Does the city or Volusia County issue your permit?

Enter the address in the Volusia County Property Appraiser’s Real Property Search.

Tax district 201 identifies a city parcel. District 200, labeled Unincorporated – Northeast, generally routes you to Volusia County. Ormond-by-the-Sea residents use the county Permit Center.

On North US 1 between the Tomoka River bridge and the Volusia–Flagler county line, the city’s permit jurisdiction extends to some unincorporated parcels.

If your address is on that stretch, compare the parcel with the city’s amended service-area map before opening a county application.

Sources: [9] Volusia County Property Appraiser • address and parcel search; [10] City FAQs • permit jurisdiction and tax districts; [11] North US 1 service boundary and maps; [12] Volusia County • location of Ormond-by-the-Sea; [13] Volusia County Permit Center

Choose the Ormond Beach application and file it in Civic Access

On Permit Forms, choose the checklist that describes your project.

For a bathroom remodel, replacing tile and cabinets falls under the city’s cosmetic exception. Moving the plumbing to a different wall calls for a plumbing permit. Under Plumbing/Gas, the checklist asks for a detailed description of the work. The city may also ask for plans for commercial plumbing or work beyond a replacement.

Select “Login or Register” in Civic Access. A contractor with several permit staff can set up the company account with a shared email address, then link individual users to it.

Choose an inbox you check for invoices, permits and inspection results. Select the residential or nonresidential application that matches your work, enter each contractor and license number, attach the signed and notarized Permit Application Affidavit, upload the checklist documents and submit.

Applying as an owner-builder? Bring proof of ownership to Room 104 and sign the separate owner-builder affidavit there with a staff notary.

The division specifies title in the owner’s name and occupancy for the owner’s use. Check its one-year restriction on rental, lease or sale after completion.

Sources: [3] City permit forms and required submittal documents; [2] Ormond Beach Building Division office and hours (checked November 23, 2026); [8] Civic Access registration and application guide; [18] Plumbing permit submittal checklist; [1] Open Civic Access to apply, pay, search permits or book an inspection

What does the city charge for a permit?

On the city’s Schedule of Fees page, choose Building Fees. City Code section 8-3, as revised by Ordinance 2026-16, lists $210.00 for a detached deck.

That row includes $80.00 for administration, $20.00 for plan review and $110.00 for inspections. The garage door row totals $155.00. A residential water heater has a $105.00 fee, including $55.00 for inspection.

For a new house, check the separate impact fee schedule as well.

The building fee ordinance also lists state surcharges. To see what you actually owe, open the invoice in Tyler. Ormond Beach issues permit invoices there. If an email asks you to wire money, call the Building Division at 386-610-0540 before paying.

Sources: [5] City fee schedules • building, planning and impact fees; [14] City building permit fee schedule • Ordinance 2026-16; [2] Ormond Beach Building Division office and hours (checked November 23, 2026)

Prepare the survey and drawing files for a new house

On the boundary survey for an Ormond Beach house, show existing and proposed structures, setbacks, easements and any septic tank and drainfield.

The drainage plan needs elevations on the lot and at least 10 feet beyond its boundary. Include that off-site strip when ordering the survey.

On the tree protection plan, show swales and mark each tree you intend to remove with an X.

For trees you intend to keep, draw the barricade at the drip line and include the city’s LS-4 barricade detail. A fence or pool at the same address needs its own permit.

Upload the architectural and engineering sheets together in one PDF.

Upload product installation instructions separately, one PDF per exterior item, such as windows or roofing. The new-home package also calls for the truss engineering and layout, energy calculations with the EPL card signed by the licensed building contractor, and Volusia County’s impact fee application.

Sources: [15] New single-family residence checklist

Early plan review and the permit application

For a single-family project or commercial interior project that needs no site plan review, email the city’s early review form to [email protected].

A commercial or multifamily project that needs site plan approval can request concurrent building review once the site plan has been submitted. Enter the city’s PZ project number on that request.

For a year-end filing, check which code will apply when you submit the permit application.

The 8th Edition (2023) Florida Building Code applies to current Ormond Beach applications. The 9th Edition (2026) takes effect December 31, 2026. The city’s early review form says an applicable code change can affect whether you can use the plans already reviewed.

Sources: [16] City application for early plan review or concurrent review; [26] Florida Building Commission • current code effective date; [27] Florida Building Commission • next code effective date

Request an inspection before covering the work

Read the inspection list on the issued Ormond Beach placard. The division conducts building, fire and engineering inspections.

Use the permit number on the front of the permit to book in Civic Access. Requests placed before 4:00 p.m. are scheduled for the following business day.

Plan for access as early as 7:00 a.m. The city gives indoor inspections at occupied homes priority, and a requested time depends on availability.

Keep the work exposed and accessible until the inspector approves it. You can see the result in Civic Access. Pay any outstanding inspection fees before the final building inspection.

Sources: [4] City inspection requests and scheduling cutoff; [1] Open Civic Access to apply, pay, search permits or book an inspection; [8] Civic Access registration and application guide

Flood maps and beachside window protection

FEMA’s community record gives September 29, 2017 as the effective flood map date for Ormond Beach.

Use the Flood Map Service Center to find the panel for your address. The city reports a Class 5 Community Rating System designation. For flood history or drainage concerns specific to your lot, call Ormond Beach Planning at 386-610-0520. The new-home checklist asks for the flood zone and finished-floor elevation on the drainage drawing.

Volusia County is outside the Florida Building Code’s High-Velocity Hurricane Zone.

For a new beachside building, the city still requires opening protection. Its building FAQ lists impact glass, approved panels and shutters as options. Identify which system your drawings specify when assembling the window product approvals.

Sources: [23] FEMA Community Status Book • Florida; [22] FEMA Flood Map Service Center • search by address; [24] Ormond Beach floodplain management progress report; [21] City Planning Department • flood zones and drainage inquiries; [15] New single-family residence checklist; [25] Florida Building Commission • High-Velocity Hurricane Zone definition; [17] Ormond Beach building FAQs on sheds, permit review and beachside glazing

Drawings for an Ormond Beach submittal

Send Pineland Engineering the boundary survey and proposed footprint if you need drawings for an Ormond Beach new-home application.

Pineland can coordinate the floor elevation on the architectural sheets with the site drainage plan and assemble the architectural and structural sheets in the city’s single building-drawings PDF. For a revision, send the examiner’s comment with the sheet it refers to.

Sources: [15] New single-family residence checklist; [17] Ormond Beach building FAQs on sheds, permit review and beachside glazing

What Do People Ask About City of Ormond Beach Building Division?

How do I find the comments on my Ormond Beach permit?

The applicant can sign in to Civic Access, open the project, select Project Reports, choose Workflow–Department Review Status and click View Report. Each department’s review appears there. If the contractor filed the permit, ask them for the comments. A public address search shows the history and overall status.

What work on my Ormond Beach home qualifies for a permit exemption?

The city lists residential painting, cabinet replacement and flooring as cosmetic exceptions. A single-family owner or their contractor can also request the city’s exemption for eligible work valued at less than $7,500. Email the exemption form to [email protected] with a contract or other documentation showing scope and value. This exemption excludes electrical, plumbing, structural, mechanical and gas work, and properties even partly in a flood hazard area. The whole project counts toward the limit. Ormond Beach handles zoning permits for fences and driveways separately.

Does a small storage shed need an Ormond Beach building permit?

The city’s FAQ exempts a manufactured storage or utility shed under 50 square feet with no permanent base or slab. Anchor the shed, keep it out of the front yard and allow at least 7.5 feet from rear and side property lines. At exactly 50 square feet, check with Room 104. For a permitted shed, the city checklist asks for a site plan or survey showing its position relative to the house, lot lines and easements. For a prefabricated structure, include the manufacturer’s drawings, specifications and installation information.

How long does Ormond Beach permit review take?

For a standard application, give the division the permit type and ask for its current review time. The early or concurrent review form gives a minimum of 3 to 5 business days for staff to create the permit and issue the payment slip after comments are resolved, site plan approval is obtained where applicable and the licensed contractor submits the complete permit application. That interval starts after the plans have been reviewed.

Which supporting forms go with an Ormond Beach plumbing permit?

Under Plumbing/Gas, use the city’s Required Submittal Documents checklist. It lists an owner’s disclosure statement and a Notice of Commencement when applicable. Commercial projects also need the Equivalent Living Unit form. For a septic hookup, the plumbing application asks you to attach a copy of the Volusia County hookup permit.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.