Palmetto Bay Building Department

Pineland Engineering prepares permit-ready construction documents for Palmetto Bay, Miami-Dade County, Florida projects and coordinates directly with the Palmetto Bay Building Department during plan review — so you get your permit faster.

Quick Answer

For a new permit, open the Village’s Apply for a Building Permit page and choose Online Permit Submittal. For corrections, choose Submit Building Revisions on that same page. To book a site visit, go to Inspections and select an appointment date.

The Village of Palmetto Bay Building & Permitting Department handles building permits at 9705 East Hibiscus Street, Palmetto Bay, FL 33157. For a permit question, call 305-259-1250 or email [email protected] with the job address and a description of the work.

Where Can I Verify the Official Requirements?

Village Hall hours and the municipal boundary

The East Hibiscus Street counter opens weekdays at 7:30 a.m., closes for lunch from noon to 1 p.m., and closes for the day at 4 p.m.

The office observes Village holidays. Counter information checked November 23, 2026.

Check the parcel on Miami-Dade’s Government Boundaries Map if the job is near the edge of the Village.

The charter places Pinecrest and Coral Gables along the northern boundary at SW 136 Street and Cutler Bay along the southern boundary at SW 184 Street. For an unincorporated address, start with Miami-Dade County.

Sources: [3] Contact the Building & Permitting Department — directions and hours; [13] Village Charter and municipal boundaries; [12] Miami-Dade County permitting jurisdiction

Does a small Palmetto Bay project need a permit?

On a single-family property, work valued below $7,500 may qualify for a building permit exemption.

Check the parcel’s flood designation first. Even if only part of the property lies in a designated flood hazard area, this exemption is unavailable. Electrical, gas, mechanical, plumbing and structural work are also excluded. Palmetto Bay specifically lists air conditioner replacements and fences that need structural review among the jobs that still require a permit.

Send the Village Building Official a written exemption request explaining the work.

Attach the contract or other records documenting its scope and value. The Village sends an approval notice for qualifying work. Zoning approval may still be necessary.

Sources: [14] Village small-project exemption request; [15] Florida Statutes, building permit exemptions

Register the contractor and assemble the upload

A contractor with an older Village registration must enroll as a new contractor if they have never registered in the current Citizen Portal.

The registration checklist calls for a notarized registration form, contractor and occupational licenses, proof of workers’ compensation coverage or exemption, and a liability insurance certificate naming the Village as certificate holder.

On Permit Forms & Documents, choose the package for the job. For a fence, mark the proposed fence line, height and material on the survey and show each gate and its swing direction.

The general application checklist specifies a survey less than a year old, while the fence package gives instructions for using an older survey with an affidavit.

For a contractor filing, the property owner and qualifier sign the Village application and have both signatures notarized.

The Village checklist includes the legal description and describes scaled, dimensioned drawings by a registered architect or engineer. For an owner-builder filing, check the declaration on that list. Ask the clerk whether the scope also calls for energy or structural calculations or a landscape plan. For a job involving excavation, have the Sunshine utility location ticket number ready. Create a user account, then upload the application and attachments through Online Permit Submittal.

Sources: [5] Village contractor registration instructions; [6] Village permit packages by project type; [11] Village fence survey and gate details; [7] Village permit application form; [1] Apply online or submit revisions — Village permit portal and instructions

Plan review, corrections and the final permit fee

Palmetto Bay assigns a processing number once it has the required submittals.

Its application page lists up to 10 working days for residential review and approval and up to 15 working days for commercial projects. Ask the clerk whether the plans also go to an outside reviewer such as the county fire department. If a reviewer requests clarification, have the designer identify the changes on the sheets and upload them through Submit Building Revisions for another review.

After the required reviews and outside approvals, the building division calculates the final fee and contacts the person listed on the application.

For an estimate, give the department the job address and permit type. Its Building Permits page lists a 15% fee reduction for qualifying work on homesteaded properties. Ask whether it applies to the proposed driveway, fence, pool, spa, pool deck, standby generator, or window and door installation or replacement.

Use Methods of Payment to review and pay Village fees online.

Credit card payments carry a 2.25% convenience fee. At the first-floor cashier in Village Hall, bring a check, money order or cash in bills of $20 or less.

Sources: [1] Apply online or submit revisions — Village permit portal and instructions; [8] Village permit requirements and homestead fee reduction; [10] Village Walkthrough Wednesday permit packages; [9] Village cashier and online payment

What to bring on Walkthrough Wednesday

For a fence, driveway, residential or commercial garage door, or exact replacement of an air conditioner or water heater, the Village offers in-person review on the last Wednesday of the month, from 7:30 to 9 a.m.

Residential roofing is on the list for contractors. Bring the complete project package to Village Hall. Same-day issuance depends on having the required documents and a current, verified contractor registration where applicable.

For electrical, plumbing or mechanical sub-permits, bring the Village application to the walkthrough after the master permit has been issued.

Sources: [10] Village Walkthrough Wednesday permit packages

Book the inspection and retrieve the result

Contractors must register in the Village portal before requesting an inspection.

Use the scheduler on the Inspections page, choose a date and continue until the confirmation appears. For a direct contract over $5,000, Florida generally requires a copy of the Notice of Commencement to be filed with the issuing office before the first inspection. The statute makes an exception to that filing rule for direct contracts under $15,000 to repair or replace an existing heating or air-conditioning system. When a notice applies, follow the Village’s directions for recording it with the Miami-Dade County Clerk and posting it at the site.

For an indoor inspection, arrange for the owner or contractor to meet the inspector.

For open-air work such as a fence or driveway, the Village allows the paperwork to be left outside in a protective plastic cover. Call 305-259-1250 the morning of the visit for a morning or afternoon window. Pick a day other than Friday for zoning inspections.

To see the outcome, open Permits & Inspections Online Portal from the Inspection Results heading.

Enter the street address or the full permit number, including its letters and dashes. Select the permit number in the search results, then choose Actions in the yellow menu.

Sources: [4] Schedule an inspection or look up a result — Village Inspections; [24] Village instructions for recording a Notice of Commencement; [25] Florida Statutes, filing the Notice of Commencement

Flood maps, additions and roofing paperwork

For the flood designation at a Palmetto Bay address, call the Village map assistance line at 305-259-1292.

Miami-Dade identifies September 11, 2009 as the effective date of its flood insurance rate maps. Use the county’s address lookup to find the panel for the property. FEMA’s verification letter gives Palmetto Bay a community rating of Class 5 in the National Flood Insurance Program’s Community Rating System.

Before sizing an addition in a flood hazard area, ask the floodplain administrator how Village Code section 30-100.6 applies.

In reviewing improvements to an existing building, Village staff check prior permits and compare the cost of improvements with the market value of the structure, excluding the land. Bring the estimate and any earlier permit numbers.

Palmetto Bay roof applicants use the Village’s High Velocity Hurricane Zone roofing package because Miami-Dade lies in that zone.

The package includes fields for deck type and product approval information. Palmetto Bay roof applications filed now use the Florida Building Code 8th Edition (2023), effective December 31, 2023. For applications filed from December 31, 2026, the 9th Edition (2026) takes effect.

Sources: [16] Village flood zone maps and parcel assistance; [17] Miami-Dade County effective FEMA flood maps; [18] Village substantial damage management plan; [19] FEMA letter verifying the Village CRS classification; [20] Miami-Dade County legislative record on the High Velocity Hurricane Zone; [21] Village HVHZ roofing application package; [22] Florida Building Commission current code effective date; [23] Florida Building Commission upcoming code effective date

Drawings for a Palmetto Bay addition

Pineland Engineering can use the parcel survey and the Village’s floodplain determination to prepare an addition’s site plan, floor elevations and foundation details.

For Village review comments on those sheets, Pineland can mark corrections for upload through Submit Building Revisions.

Sources: [18] Village substantial damage management plan; [1] Apply online or submit revisions — Village permit portal and instructions

What Do People Ask About Palmetto Bay Building Department?

What is the phone number for the Palmetto Bay Building Department?

Call 305-259-1250 for permits, plan review questions or the inspection arrival window. For a written answer about a proposed job, email [email protected].

Where can I check a current or older Palmetto Bay permit?

On the Village’s Building Permits page, choose Checking Existing Permits for a status lookup. For a property search covering open or expired Village and Miami-Dade permits, use the Lien Search Form on that page.

Can I use shed size to decide whether I need a Palmetto Bay permit?

The Village’s 144-square-foot figure is a setback rule. A utility shed larger than that must meet accessory-structure setbacks. Ask Building & Permitting about the specific shed and parcel. Its prefabricated shed package asks for the footprint, distances to property lines and other structures, and lot coverage on the survey.

How do I cancel a Palmetto Bay inspection request?

Call the department at 305-259-1250 before 9 a.m. to cancel. Use the date selector on the Village’s Inspections page when booking the next visit.

Where do I request a four-point inspection for home insurance in Palmetto Bay?

Start with the insurer and ask which report it accepts for the property. A four-point report covers the roof, electrical system, plumbing, and heating and cooling for insurance purposes. Use Palmetto Bay’s inspection scheduler for the municipal inspection attached to a building permit.