Quick Answer
For a Parkland address, select Florida and then Parkland in MGO. Open the [city’s permit checklist](https://www.cityofparkland.org/1134/Permit-Checklists) for the work described in the application. A window replacement has its own list, while an addition brings in the survey, soil report and structural calculations. Contact details, hours and portal link checked November 23, 2026.
The [City of Parkland Building Department](https://www.cityofparkland.org/109/Building-Department) issues residential and commercial building permits at City Hall, 6600 University Dr., Parkland, FL 33067. Call 954.753.5447 Monday through Thursday, 7:00 AM to 6:00 PM, or use [My Government Online (MGO)](https://www.mgoconnect.org/cp/portal) to file plans and request inspections.
Where Can I Verify the Official Requirements?
- Parkland Building Department
- Parkland Electronic Permitting and MGO portal access
- Parkland permit checklists by project type
- Parkland’s current fee schedule
- Adopted Parkland fee schedule and resolution
- Parkland City Commission fee tables (packet page 29)
- Parkland residential addition checklist
- Parkland new residential, duplex and townhouse checklist
- Parkland commercial interior alteration checklist
- Parkland guidance on Broward County ePermits OneStop
- Parkland MGO file naming conventions
- Parkland window and door checklist
- Parkland permit review estimates and routing chart
- Parkland landscaping applications and review times
- Parkland plan review and inspection FAQs
- Parkland floodplain development and flood map guidance
- Broward County flood map and parcel lookup instructions
- Parkland adopted floodplain ordinance
- FEMA Community Status Book entry for Parkland
- Florida Division of Emergency Management directory of local floodplain administrators
- Florida Building Commission training materials on the HVHZ definition
- Florida Building Commission current code effective date
- Florida Building Commission code milestones and next effective date
- City of Coral Springs permit portal
- Ask Parkland city services directory
Filing with Parkland or Broward County
Parkland is a Broward County municipality. For work inside Parkland, start the city application in MGO.
Coral Springs runs its own eTRAKiT permit portal. Check which city serves the job address before creating a record, especially if a search turns up an old Parkland Trakit link. Parkland retired that system.
A county approval can be part of a Parkland job. The city’s Broward County ePermit Resources page links to ePermits OneStop and gives separate instructions for asbestos certificates and environmental review.
For a commercial interior alteration, Parkland’s checklist calls for the county asbestos responsibility form at submittal. It also calls for Coconut Creek engineering approval if Coconut Creek utilities serve that part of Parkland. Check the utility provider for the tenant space while arranging the county paperwork.
Sources: [1] Parkland Building Department; [2] Parkland Electronic Permitting and MGO portal access; [10] Parkland guidance on Broward County ePermits OneStop; [24] City of Coral Springs permit portal; [25] Ask Parkland city services directory; [9] Parkland commercial interior alteration checklist; [19] FEMA Community Status Book entry for Parkland
Setting up MGO and naming the files
In the MGO Customer Portal, choose Florida and Parkland, create the account and verify its phone number.
Contractors transferring from Parkland’s old system must register again in MGO and provide their contractor license and new liability and workers’ compensation certificates. For help getting into the portal, call the MGO help desk at (866) 957-3764 and choose option 1. For questions about which application the city wants, use the Building Department number above.
An owner acting as contractor on a residential addition should get the owner-builder affidavit from the city and arrange to appear in person to sign the permit application.
For electronic uploads, Parkland labels the building application APP B, the affidavit OB AFF and a proposed survey PROP SURV. For a new house, duplex, townhouse or commercial building with several sheets per trade, combine each trade’s sheets in one file. For instance, put the electrical sheets together under ELECTRICAL so the reviewer can open the full set.
Sources: [1] Parkland Building Department; [2] Parkland Electronic Permitting and MGO portal access; [11] Parkland MGO file naming conventions; [7] Parkland residential addition checklist; [14] Parkland landscaping applications and review times
Matching the drawings to the Parkland checklist
For an addition, use the Broward uniform application for each discipline involved.
The Parkland list includes a survey or site plan, a geotechnical report, structural calculations and product approvals. For the mechanical package, pair the energy forms with the heating and cooling loads and the manufacturer’s specifications. If the addition has trusses, plan for the supplier to deliver the truss drawings before the foundation inspection. For new homes in Pinetree and the Ranches, the city specifically asks for copies of well and septic permits and for drainage information on the survey.
For replacement windows or doors, Parkland’s upload list pairs a floor plan locating the openings with the Broward retrofit schedule, wind-load information and product approvals.
Label each opening consistently across the floor plan and schedule. Parkland falls in the Florida Building Code’s High-Velocity Hurricane Zone because it is in Broward County. If the selected product changes, check its approval against the pressure for that particular opening before revising the schedule.
For Parkland applications filed now, the applicable Florida Building Code is the 8th Edition (2023), effective December 31, 2023.
For an addition slated for year-end filing, ask Parkland which edition to use on the load calculations as the 9th Edition (2026) takes effect December 31, 2026.
Sources: [3] Parkland permit checklists by project type; [11] Parkland MGO file naming conventions; [7] Parkland residential addition checklist; [8] Parkland new residential, duplex and townhouse checklist; [15] Parkland plan review and inspection FAQs; [19] FEMA Community Status Book entry for Parkland; [21] Florida Building Commission training materials on the HVHZ definition; [12] Parkland window and door checklist; [22] Florida Building Commission current code effective date; [23] Florida Building Commission code milestones and next effective date
What the city charges for review and inspections
Parkland’s FY2026–2027 schedule separates the plan review and permit application fee from inspection charges.
Under the general construction table, the minimum review and application fee is $100 for a job valued at up to $1,000. Above that threshold, the table lists $100 for the first $1,000 plus 2.5% of the total construction cost for residential work or 4.0% of the total for commercial work.
Check for a line matching the project before using the general formula.
For a residential vehicle charging system, the schedule lists $90 for plan review plus $77.32 for each inspection. The general inspection rate is $77.32 per trade, per occurrence. When budgeting for a project with both electrical and building inspections, ask which trades will inspect it and how often.
Sources: [4] Parkland’s current fee schedule; [5] Adopted Parkland fee schedule and resolution; [6] Parkland City Commission fee tables (packet page 29)
Review timing and counter hours by discipline
Parkland’s Permit Time Frame chart puts required outside approvals, including planning, engineering, landscaping and fire, ahead of building review.
It labels water heaters and A/C change-outs as over-the-counter items. For an addition, the chart includes landscaping, planning and zoning, and engineering before the building trades. Its estimated approval totals are 36 for additions and 26 for residential remodels. The chart leaves the time unit unspecified. Ask which review the file is waiting on when checking an addition’s expected approval date.
Landscaping has a separate published review estimate of 7–21 days, depending on the submission and the queue.
For a landscape application tied to a new driveway or pool, enter the associated construction permit number in MGO’s Questionnaire. If a visit is needed, Parkland lists landscape review and inspections Tuesday through Thursday, 7:30 AM to 3:30 PM. Planning & Zoning takes inquiries Monday through Thursday, 7:00 AM to 5:30 PM. Engineering follows the Building Department’s 7:00 AM to 6:00 PM Monday-through-Thursday schedule.
Sources: [1] Parkland Building Department; [13] Parkland permit review estimates and routing chart; [14] Parkland landscaping applications and review times
Checking flood elevations before moving soil
Broward County directs applicants to its flood map effective July 31, 2024.
Select the house in the county viewer and check the panel for that address because some panels carried forward from the earlier map. FEMA’s Community Status Book lists Parkland as Community Rating System Class 9. The city’s Building Official serves as its Floodplain Administrator.
Under section 110-10 of Parkland’s Land Development Code, a project falls within the floodplain ordinance’s scope even when only part of the development is in a flood hazard area.
That matters for fill or grading outside the proposed building footprint. Take the survey and proposed grading limits to the Building Department to identify which building or engineering permits the site work needs.
Sources: [16] Parkland floodplain development and flood map guidance; [18] Parkland adopted floodplain ordinance; [19] FEMA Community Status Book entry for Parkland; [20] Florida Division of Emergency Management directory of local floodplain administrators; [17] Broward County flood map and parcel lookup instructions
How Pineland can help with a Parkland submittal
For a Parkland room addition, Pineland Engineering can use the site survey and soil report to coordinate the proposed footprint, foundation drawings and structural calculations.
For a new home in the Ranches, send Pineland the survey showing drainage along with the proposed layout so the civil and building drawings use the same site information. Pineland can also organize the architectural, structural and building systems sheets by trade for Parkland’s MGO upload.
Sources: [11] Parkland MGO file naming conventions; [7] Parkland residential addition checklist; [8] Parkland new residential, duplex and townhouse checklist
Free Florida Engineering Tools
Related Resources
What Do People Ask About Parkland Building Department?
How can someone look up a building permit in Parkland?
Call the Building Department at 954.753.5447 with the street address, owner’s name or contractor’s name. The city can use any of those to check whether a permit was issued. To look up inspection results, register in MGO as a public user.
Does painting a house in Parkland require a building permit?
Parkland lists interior and exterior painting among its permit exemptions. If the same contract includes replacing windows or doors, use the city’s window and door checklist to ask about that portion before filing.
How recent must the survey be for a Parkland permit?
Parkland’s permit FAQ says a survey submitted with an application may be up to one year old and must show existing structures, easements and rights-of-way. Check those items on the survey before attaching it as PROP SURV.
How does an applicant schedule an inspection and check the result?
Request the inspection on the active Parkland permit through MGO. The posted job-site permit card records approvals. If the inspector leaves a red tag, read the item marked on the duplicate before requesting another visit. Parkland requires final inspection approval to close the permit. For a Parkland project that also needs a certificate of occupancy, contact the same office for issuance once the final inspection result is posted.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.