South Miami Building Department

Pineland Engineering prepares permit-ready construction documents for South Miami, Miami-Dade County, Florida projects and coordinates directly with the South Miami Building Department during plan review — so you get your permit faster.

Quick Answer

Call the City of South Miami Building Department at 305-663-6355 or visit the Sylva Martin Building, 6130 Sunset Drive, South Miami, FL 33143. The permit counter is open Monday through Friday, 8:00 am to 3:00 pm.

For online permits, open South Miami’s eTRAKiT portal and choose Search Permit to look up a property or Apply / New Permit to file. For an inspection the following business day, call Building before 3:45 pm with the permit number. Office details and portal checked November 23, 2026.

Where Can I Verify the Official Requirements?

Check the folio before choosing a permit office

Look at the first two digits of the property folio. The Miami-Dade Property Appraiser uses 09 for South Miami, 03 for Coral Gables, 20 for Pinecrest and 30 for unincorporated Miami-Dade.

Near the University of Miami campus, check the folio before filing. Apply to the city identified by the prefix, or to Miami-Dade County for a 30 folio. South Miami’s City Maps page also links to a map of parcels and zoning.

In South Miami eTRAKiT, choose Search Permit. Select Folio # for parcel history or Permit # for one filing.

If you have only a street name, choose Address, then Contains. Check Site Info on the matching record before opening Fees, Inspections or Reviews. To look for drawings, the city’s Building Division page also lists Scanned Plans Search.

Sources: [26] Miami-Dade Property Appraiser folio and municipality lookup; [7] Miami-Dade County permitting jurisdiction by property location; [6] City of South Miami community and neighboring municipalities; [8] South Miami City Maps; [3] Search South Miami permits by address, folio or permit number; [1] Contact the South Miami Building Department

Choose the South Miami forms for your work

Under Building on the city’s Forms & Applications page, choose the building, electrical, mechanical or plumbing application that matches the work.

The city also lists an Owner Builder Form. For a contractor filing, South Miami calls for proof of ownership and signatures from the property owner and the contractor’s qualifier. Bring notarized originals and two copies of supporting documents to the Sunset Drive counter.

South Miami’s checklist lists a property survey for residential remodels, additions and new homes.

For new homes it also lists structural calculations. For residential remodels and additions it asks for calculations when the plans call for them. For replacement windows or doors, mark each opening on a sketch of the house and match it to the product approval and wind-load information. South Miami is in the Miami-Dade portion of Florida’s High-Velocity Hurricane Zone.

Sources: [11] City of South Miami forms and applications; [10] City documents needed for a building permit; [4] City permit forms and inspection instructions; [12] South Miami building submittal checklist; [6] City of South Miami community and neighboring municipalities; [13] Florida Building Commission code materials and hurricane-zone definition

When Planning or Public Works reviews the job

South Miami’s Design Review Board application covers new construction, two-story residential additions, and commercial additions, exterior renovations and site plan changes.

The board cites Land Development Code sections 20-5.2 and 20-5.5. For a new building or a two-story home addition, Planning offers an optional staff review. Bring a survey and a site plan comparing proposed dimensions with what the zoning district allows. After board approval, obtain the building permit before construction.

For a driveway, mark the work area on the survey and detail the pavement base for Building’s private-property review.

Where the approach enters the public right-of-way, the Engineering and Construction Division handles the permit. Print the Public Works application, have it notarized and deliver it in person.

Sources: [14] South Miami Design Review Board application package; [15] South Miami Design Review Board and Land Development Code references; [12] South Miami building submittal checklist; [16] South Miami Engineering and Construction Division right-of-way permits

File online and respond to a reviewer

Homeowners can choose Setup an Account on South Miami’s eTRAKiT home page.

For contractor access, email licenses, insurance documents and the company email address to [email protected]. At first login, select Contractor, the company name and Forgot Password.

Under Apply / New Permit, select the residential or commercial trade and subtype, describe the work and enter its value.

Type part of the job address and select the correct match. Attach the application and supporting documents, complete the contact information and check the details at Review and Submit.

Open the permit on the Dashboard and select Review for status by trade.

For a disapproved sheet, choose More Info to read the comment. Use the paperclip beside that permit to upload the revision. Put the sheet number in the upload description and identify the correction and upload date. South Miami limits each file to 200 MB.

Sources: [2] Open South Miami eTRAKiT to apply, pay or schedule; [9] South Miami eTRAKiT how-to guide; [17] City online plan submittal naming convention

If South Miami refers your plans to Miami-Dade

For a new commercial building, South Miami’s checklist calls for county fire review.

Other projects may need county review for water and sewer, environmental matters or impact fees. For County Municipal Approval, submit the county application, Contact Sheet, plans and a copy of your South Miami application with its city process number through the county portal.

Miami-Dade assigns its municipal review an M-number. Use that number in the county portal, open Applications and select the process number for reviewer comments.

After county approval, use the payment link on the County Municipal Approval page for the county balance. For an appointment about a county review comment, use MeetQ or call 786-315-2100. Keep the South Miami permit number handy for the city review in eTRAKiT.

Sources: [12] South Miami building submittal checklist; [27] South Miami outside agency approvals; [28] Miami-Dade County municipal approval, status lookup and payment; [25] Miami-Dade County permit submissions and staff appointments

Check the fee before paying

The October 23, 2026 South Miami Schedule of Fees and Fines lists a $150 minimum building permit fee for either a residential or a commercial permit.

In the Building Division table, exterior window, door and shutter work is $25 per opening. Roofing and re-roofing are priced by area at $0.35 per square foot for residential work and $0.45 for commercial work. For a job involving several trades, ask Building which charges apply.

The city schedule lists an upfront fee of 30% of the permit fee.

In eTRAKiT, the amount on Review and Submit is preliminary. The city gives you the final fee and enables payment once the permit is approved. For a city invoice, eTRAKiT directs applicants to call 305-663-6343 to verify it before paying.

Sources: [18] South Miami Schedule of Fees and Fines, Building Division; [9] South Miami eTRAKiT how-to guide; [2] Open South Miami eTRAKiT to apply, pay or schedule

Find the flood map for a South Miami addition

Email the property address to [email protected] for help identifying the flood zone.

The map in effect in November 2026 dates to September 11, 2009. FEMA lists South Miami Planning and Zoning at 6130 Sunset Drive as the repository for the replacement map effective February 19, 2027. If design and filing fall on opposite sides of that date, ask Planning which panel applies to the application.

Building handles floodplain development permits and has Elevation Certificates available for review.

The county reports a change in the vertical reference used for elevations on the revised maps. If you have an older certificate, ask the surveyor to compare floor and flood elevations using the same reference. In FEMA’s Community Rating System, the city’s record is community 120658, Class 6.

Sources: [19] South Miami flood maps and floodplain contacts; [20] FEMA final flood hazard determination for South Miami; [23] Miami-Dade County legislative staff report on revised FEMA maps; [22] City of South Miami floodplain permits and elevation certificates; [21] FEMA National Flood Insurance Program record for the City of South Miami

Drawings for the Design Review Board

For a two-story addition, Pineland Engineering can prepare the site plan and zoning comparison for South Miami’s optional staff review.

Civil grading drawings can show the board how runoff will collect on site and at the swale. For a later Building revision, send Pineland the sheet and the trade reviewer’s More Info comment so Pineland can revise the detail in question.

Sources: [14] South Miami Design Review Board application package; [9] South Miami eTRAKiT how-to guide

What Do People Ask About South Miami Building Department?

Do I need a permit for a backyard shed in South Miami?

Yes. South Miami’s shed checklist asks for two copies of the state product approval and two copies of the survey showing the proposed location and distance from the setback. Check the siting with Planning before choosing where to put the shed.

How can I check South Miami permit status or pay a city fee?

Search Permit in eTRAKiT is open to the public. Look up the permit number and open Reviews. To pay from a public account, sign in and choose Link to Permits and Licenses on the Dashboard. Select Permit and enter the city permit number to link it.

How long does South Miami building permit review take?

For an estimate on a pending application, email [email protected] with the permit number and the trade still under review. If a statute entitles your application to expedited processing, tell the city the statutory basis when you file. South Miami gives qualifying filings first priority.

How do I schedule a South Miami building inspection?

Call 305-663-6355 before 3:45 pm with the permit number for a building, roofing, mechanical, electrical or plumbing inspection the next business day. To request one online, sign in to eTRAKiT and choose Schedule under Inspections.

What construction hours does South Miami allow?

Weekday construction hours are 7 am to 6 pm. South Miami prohibits weekend work in residential districts. Saturday work is allowed from 9 am to 5 pm in nonresidential districts at least 500 feet from a residential district. Construction is prohibited on Sundays and city-recognized holidays.

Who checks a proposed South Miami storefront before I apply?

Call Planning and Zoning at (305) 663-6326 about the proposed use and parking at the address. For a move within the city, even between suites in one building, South Miami lists a Certificate of Use form and a Fire Department inspection report. Take proposed interior or exterior alterations to Building for the necessary permits before starting work.

Ready to Start Your Project?

Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.