Quick Answer
Apply through Surfside’s Customer Self Service (CSS) portal for listed work such as residential additions, replacement windows and commercial remodels. For a new house or an addition, start with the Town Planner so the plans can reach the Planning and Zoning Board in time for its agenda.
The Town of Surfside Building Services Department handles permits and inspections at 9293 Harding Avenue, Surfside, FL 33154. Call 305.861.4863 or visit the Town Hall lobby Monday through Friday, 9 AM to 5 PM.
Where Can I Verify the Official Requirements?
- Apply online — Surfside Customer Self Service (CSS)
- Contact the Town of Surfside Building Department
- Permit fees effective November 10, 2026 — Town fee guide
- Permit types and portal instructions
- Surfside building applications and worksheets
- Town instructions for applications submitted by email
- Surfside Planning — staff review and Board applications
- Town Hall permit counter and inspection services
- Surfside Inspection Request Form
- Surfside owner-builder affidavit
- Request a record from the Surfside Town Clerk
- Town electrical worksheet
- Surfside stormwater and retaining wall ordinance
- Surfside floodplain ordinance
- FEMA map revision for Collins Avenue
- FEMA Community Status Book — Florida
- Florida Building Commission — hurricane zone designation
- Florida Building Commission — current code
- Florida Building Commission — next edition effective date
- Miami-Dade directory of municipal offices
- Surfside resolution adopting the updated fee guide
Where to file a Surfside permit application
Surfside office and CSS portal details checked November 23, 2026.
Check the parcel’s municipality before registering. Miami-Dade’s directory gives Surfside, Bal Harbour and Miami Beach separate building office listings.
Create a CSS account, open the Permits tab and select the work by building type as well as trade.
For example, Surfside lists flooring and soundproofing under commercial/multifamily work, while residential windows and doors have their own entries. For electrical work at a house, check whether the job is a repair, an alteration or a new installation before choosing a category.
Attach the files requested in that category. Surfside gives site plans, construction details, equipment ratings and product approvals as examples.
For a window job in Surfside’s Miami-Dade High Velocity Hurricane Zone, match the approval document to the window specified on the drawing. Keep the final drawing set available for printing. The CSS instructions call for a paper copy before issuance and say the Town emails payment instructions after approval.
Sources: [1] Apply online — Surfside Customer Self Service (CSS); [2] Contact the Town of Surfside Building Department; [4] Permit types and portal instructions; [20] Miami-Dade directory of municipal offices; [17] Florida Building Commission — hurricane zone designation
When the Town directs an applicant to file by email
Surfside also publishes a Permit Application Submittal Instructions sheet that directs applicants to use email.
If the project has no clear CSS category, or a clerk has supplied this sheet, call the Harding Avenue counter to confirm the route before sending the same job twice.
For an email filing, put the job address and any existing master permit number in the subject line.
Send the application and upfront payment documentation together in one PDF to [email protected]. Put the plans in a separate PDF organized by discipline. For files over 20 MB, the sheet directs applicants to send a Dropbox or OneDrive link. Confirm the upfront amount against the current Town fee guide.
Save the receipt that the permit technician returns. It contains the Town application number to use for any applicable Miami-Dade County, environmental (DERM) or fire review.
Include that number again when returning county-approved plans to Surfside. The Town clerk emails the outcome after the applicable trades have reviewed the plans.
Sources: [6] Town instructions for applications submitted by email; [4] Permit types and portal instructions; [3] Permit fees effective November 10, 2026 — Town fee guide
What Surfside charges for common permits
Open the Building Department’s fee guide effective November 10, 2026, adopted by Resolution 2026-3600.
The upfront fee is 30% of the estimated permit fee. Use the November rate when checking the amount on the email submittal sheet.
The building permit table lists a $300 base fee for residential window or door replacement, $400 for a residential driveway, $600 for a residential condo kitchen remodel and $900 for a pool.
The guide lists residential new construction at $5.00 per square foot and residential alterations at $4.00 per square foot. Ask the counter which entry covers the proposed scope, especially when an addition includes a kitchen remodel.
Allow for applicable zoning, Public Works and fire safety review fees when budgeting.
The plumbing table has a separate $300 entry for a residential pool heater, for example. Give the clerk the pool and equipment scopes together when asking for a total.
For a private provider, Surfside first subtracts the administrative portion from the permit fee.
It applies a discount to the remaining amount based on the provider’s work. The guide lists 25% for inspections only and 50% for both plan review and inspections.
Sources: [3] Permit fees effective November 10, 2026 — Town fee guide; [21] Surfside resolution adopting the updated fee guide; [6] Town instructions for applications submitted by email
Planning approval for houses, sheds and pools
Surfside Planning distinguishes projects by location on the lot as well as by use.
A rear-yard pool or fence is on the staff-review list. A front-yard pool or fence at a single- or two-family house is on the Board list. Sheds and driveways appear on the staff list, which uses the Building Permit Application Form.
For a new house, addition, garage conversion or exterior renovation, use Planning’s application for single- and two-family houses.
Planning posts a different Board form for multifamily and nonresidential development. Arrange the required meeting with the Town Planner before filing a Board application. Planning accepts an in-person or virtual meeting. To get on a particular agenda, submit complete, zoning-compliant plans at least 30 days before the scheduled Board meeting.
Sources: [7] Surfside Planning — staff review and Board applications; [5] Surfside building applications and worksheets
What the new-home site plan should show
For a new single-family house, address runoff while laying out the building on the survey.
Surfside Code section 34-42 calls for plans and calculations showing how the lot retains stormwater on site. If the proposed grades call for a retaining wall, check the new-home wall standards in section 90-56 alongside the drainage details.
For a coastal parcel, check the mapped flood hazard at the building footprint.
FEMA’s revision for 8777 Collins Avenue illustrates why the map date matters. The underlying panel is dated September 11, 2009, and the revision took effect April 18, 2024. Its mapped reach is near 86th Street and Collins Avenue. FEMA lists Surfside as CRS Class 6, a community-wide rating. For parcel elevations, consult the map and any revisions for that address.
Surfside keeps the flood maps at the Building Department. The Town Manager or designee serves as Floodplain Administrator.
For development subject to the floodplain ordinance, section 42-5 specifies scaled drawings showing applicable flood zones, base flood elevations and proposed final grades for fill or excavation. For an addition in a flood hazard area, ask how the Floodplain Administrator will compare the improvement cost with the building’s market value.
Sources: [13] Surfside stormwater and retaining wall ordinance; [15] FEMA map revision for Collins Avenue; [14] Surfside floodplain ordinance; [16] FEMA Community Status Book — Florida
Inspections and the permit record
For a field visit, open Surfside’s Inspection Request Form and select the trade.
A roofing inspection has its own box, distinct from the building inspection box. Enter the inspection type, address, requested date, master permit number and any subsidiary number. Include a contact phone and the required email address. The form lists 305.861.4863, option 2. Surfside uses part-time inspectors, so confirm the appointment before arranging site access.
Ask the clerk which final record applies to the permit. Surfside’s fee guide identifies a final approved inspection, a Certificate of Occupancy and a Certificate of Completion as possible endpoints.
The Town’s forms page includes the application for occupancy and completion certificates.
Sources: [9] Surfside Inspection Request Form; [8] Town Hall permit counter and inspection services; [3] Permit fees effective November 10, 2026 — Town fee guide; [5] Surfside building applications and worksheets
Preparing drawings for Surfside review
Pineland Engineering can coordinate the Surfside Board submission with the permit drawings.
For a house addition, that can mean showing the exterior changes on the elevations, the roof connection on the structural sheets and the effect of the addition on drainage in the site plan. Share the survey, the proposed footprint and the Town Planner’s comments when defining the drawing scope.
Date the Surfside submission with the code transition in mind.
The Florida Building Code 8th Edition (2023), effective December 31, 2023, applies to current applications. For a house still in Board review, check the intended permit filing date against December 31, 2026, when the 9th Edition (2026) takes effect.
Sources: [7] Surfside Planning — staff review and Board applications; [13] Surfside stormwater and retaining wall ordinance; [18] Florida Building Commission — current code; [19] Florida Building Commission — next edition effective date
Free Florida Engineering Tools
Related Resources
What Do People Ask About Surfside Building Department?
Can a homeowner pull a permit in Surfside?
A qualifying homeowner can apply under the owner-builder exemption. Surfside’s affidavit covers a one- or two-family residence for the owner’s own use or occupancy and describes the responsibilities the owner assumes. Read the full affidavit and arrange to appear at the Building Department in person to sign it.
How long does Surfside permit review take?
The published 30-day cutoff is for placement on a Planning and Zoning Board agenda. For the status of building review, give the Harding Avenue counter the application number from the Town receipt and ask which trade or county reviews are outstanding.
Which electrical worksheet should accompany a Surfside permit?
Surfside’s forms directory lists two electrical worksheets, including one labeled NEC-2017. Confirm the applicable form with the counter. Have the permit number, job address, outlet and fixture counts, and main service capacity ready so the electrician can complete the worksheet for the proposed installation.
How much is a Surfside permit for a condo kitchen remodel?
The Town lists $600 in the building permit table for a residential condo kitchen remodel. Ask about applicable trade and review charges before using that base figure as the project budget.
Where can someone get a copy of a Surfside building permit?
Use the Town Clerk’s public records request portal. Give the Surfside address and, if known, the permit number. Specify whether the request is for the permit, an inspection report or the final occupancy document so the clerk can identify the record.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.