City and county jurisdiction
Start with the county for unincorporated parcels. For an address inside Gainesville, check the city's own building office instead of filing by mailing address alone.
Who handles this address?
Filing instructions
Does the parcel need pre-application screening?
Enter the project address in Alachua County’s Citizenserve application before assembling the final set. The system flags addresses that require Pre-Application Screening (PAS), where staff check zoning, transportation and environmental issues.
- New owner-builders and contractors must register and wait for verification before applying. When the system calls for screening, select Pre-Application Screening under permits.
- For a one- or two-family house, submit dimensioned PDF plans on sheets at least 11 × 17 inches. On the site plan locate existing and proposed structures, wells, septic systems, roads and setbacks.
- Identify the installation address on Manual J, S and D documents. Include the truss layout with digitally signed truss engineering and complete the county’s exterior-product specification form.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Single-family flood hazard plans and fill mitigation (PDF)growth-management.alachuacounty.us
If a single-family home will be placed on fill in a mapped Special Flood Hazard Area, show the finished floor, fill volume, compensating storage basin and preconstruction drainage on the plans for Public Works.
Official source - Manufactured-home replacement flood hazard checklist (PDF)growth-management.alachuacounty.us
When replacing a manufactured home in a flood hazard area, check the county’s requirements for locating the old and proposed footprints and documenting elevations.
Official source - Non-conversion agreement for floodplain structures (PDF)growth-management.alachuacounty.us
If Public Works requires an agreement for enclosed space below an elevated structure, use the county form to document permitted uses and the owner’s restrictions.
Building and zoning contacts
Building permits
Alachua County Building Division
- Phone
- 352-374-5243
- Email or contact form
- [email protected]
- Office address
- County Annex Building, 10 SW 2nd Ave., Gainesville, FL 32601
- Office hours
- Mon–Thu, 8 a.m.–4 p.m.; Fri, 8 a.m.–1 p.m.
Planning and zoning
Alachua County Planning & Zoning
- Phone
- 352-374-5249
- Email or contact form
- [email protected]
- Office address
- County Annex Building, 10 SW 2nd Ave., Gainesville, FL 32601
- Office hours
- Mon–Thu, 8:30 a.m.–4:30 p.m.; Fri, 8:30 a.m.–2 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Can the backyard cottage share the main home’s utilities?
Check the parcel’s land-use category before pricing a second meter, well or septic system. Alachua County’s accessory dwelling unit guide says an ADU in its urban land-use categories must connect to water and sewer when both are available. Where service is unavailable, the guide calls for sharing the main residence’s septic and well, subject to health-department approval. Confirm that routing before ordering a prefab unit or fixing the site plan.
Read the official guidanceRegister for Citizenserve
New contractors and owner-builders need county verification before they can file. Once approved, sign in to Citizenserve and choose the permit type that matches the work.
Check whether the address needs screening
Enter the job address in Citizenserve. If it prompts for Pre-Application Screening (PAS), use that application for the county’s preliminary review of zoning, transportation and environmental conditions.
Before you submit
- Confirm city limits with the parcel number.
- Use the county residential or commercial checklist for the proposed work.
- Identify floodplain or lakeshore constraints before drawing the addition.