City and county jurisdiction
Use the City of Macclenny Building Department for projects inside its city limits. For a county parcel outside city limits, check Baker County Community Development.
Who handles this address?
Filing instructions
Match the permit to the 18-digit parcel
Have the 18-digit parcel number ready. Baker’s application uses it to tie the proposed work to the lot, and its mobile-home installation packet adds installer and ownership documents that the general form does not cover.
- Check future land use, zoning and FEMA flood mapping through the Property Appraiser link on the Community Development page. Give staff the parcel number if the map raises a land-use question.
- Complete section A of the county application with the scope, construction cost, power company and qualifying individual or owner-builder information. Contractors should attach the credentials listed on the form.
- For a mobile-home installation, collect the installer’s foundation and tie-down details, factory floor plan and proof of ownership. The packet calls for a 911 address letter on a new property. For a qualifying single-family residence using septic, provide proof of the septic application at building or plumbing intake.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Special-use application and site-plan checklist (PDF)bakercountyfl.org
If zoning staff identify the proposed activity as a special use, assemble the property-owner authorization and dimensioned site plan using this packet.
Official source - Second termite treatment and inspection notice (PDF)bakercountyfl.org
For a new dwelling using a chemical soil barrier, coordinate the final exterior treatment and required inspection before requesting final building approval.
Official source
Building and zoning contacts
Building permits
Baker County Building Department
- Phone
- 904-259-2403
- Email or contact form
- Check the official site
- Office address
- 360 E. Shuey Ave., Macclenny, FL 32063
- Office hours
- Mon–Fri, 8:30 a.m.–5 p.m.
Planning and zoning
Baker County Community Development / Planning and Zoning
- Phone
- 904-259-2403
- Email or contact form
- Check the official site
- Office address
- 360 E. Shuey Ave., Macclenny, FL 32063
- Office hours
- Mon–Fri, 8:30 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Do not schedule final approval before the second termite step
Baker County publishes a separate notice for new dwellings explaining its second termite inspection. If the builder uses a soil chemical barrier, the county says the final exterior treatment must be completed before final building approval. Ask the builder and pest-control contractor who will arrange the second inspection and when the exterior work will be ready for it.
Read the official guidanceCompare zoning, future land use and flood mapping
Baker County links all three map layers through its Property Appraiser resources. Use the parcel number and check the proposed use before paying for design or assuming the existing zoning is enough.
Confirm who can pull the permit
Baker County says an original notarized authorization is needed when someone other than the contractor’s license holder purchases the permit. Get the county’s current authorization form before sending a representative.
Before you submit
- Verify Macclenny city limits using the parcel, not the mailing address.
- Save a parcel map with zoning and mapped flood information.
- Confirm whether the applicant needs a notarized authorization.