City and county jurisdiction
Inside Starke or on City of Starke utilities, call the city’s Building and Zoning office at 904-964-5027. For zoning in Lawtey, Brooker or Hampton, contact the town. The county handles other county-jurisdiction applications.
Who handles this address?
Filing instructions
Check Starke utility service before filing
The City of Starke’s utility service is a routing clue even outside an obvious city address. Bradford directs owners inside Starke or on Starke utilities to the city’s Building and Zoning office at 904-964-5027.
- For property in Lawtey, Brooker or Hampton, contact the town for zoning. Separately confirm who issues the building permit.
- For a new site that needs a 911 address, give the Sheriff’s mapping office the parcel number and the road where the driveway enters. Complete page 3 of its address application. For a new home, ask the Road Department to verify the culvert and prepare one electronic plan set or two paper sets as the county packet directs.
- Choose the project application from the county’s building forms folder and save correctly titled PDFs. County staff accept email for packages of three pages or fewer and 8 MB or less. Request their upload link for larger plan sets, or deliver by mail or in person.
- Watch for acknowledgment. The county says to follow up if a submission receives no reply within two business days. Its inspection and permit searches use iWorQ.
Permit applications and filing portals
Filing resources reviewed .
- Addition and remodel application packet (PDF)bradfordcounty.app.box.com
For an addition or renovation to an existing structure, use Bradford’s addition/remodel packet to identify the drawings and records for that scope.
Official source - New home, commercial, modular or detached garage permit packet (PDF)bradfordcounty.app.box.com
- County building applications by project typebradfordcounty.app.box.com
- Sheriff’s 911 address application for a new site (PDF)bradfordsheriff.org
- County application forms and submission instructionsbradfordcountyfl.gov
- Planning, zoning and municipal routingbradfordcountyfl.gov
- Building and inspections FAQsbradfordcountyfl.gov
Supporting documents for your project
- Notice of commencement (PDF)bradfordcounty.app.box.com
When a recorded notice of commencement applies, obtain the Bradford building permit number before recording; the county form asks for it.
Official source - Contractor roofing affidavit (PDF)bradfordcounty.app.box.com
On a contractor-pulled reroof permit, Bradford accepts this affidavit for the in-progress inspection. Keep the signed copy on site or email it before the required final inspection.
Official source
Building and zoning contacts
Building permits
Bradford County Building Department
- Phone
- 904-966-6223 ext. 2
- Email or contact form
- [email protected]
- Office address
- 945 N. Temple Ave., Courthouse North Wing, Starke, FL 32091
- Office hours
- Mon–Thu, 10 a.m.–4:30 p.m. (closed noon–12:30 p.m.); Fri, 8 a.m.–1:30 p.m.
Planning and zoning
Bradford County Planning & Zoning
- Phone
- 904-966-6223 ext. 3
- Email or contact form
- Check the official site
- Office address
- 945 N. Temple Ave., Courthouse North Wing, Starke, FL 32091
- Office hours
- Mon–Thu, 10 a.m.–4:30 p.m. (closed noon–12:30 p.m.); Fri, 8 a.m.–1:30 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Who reviews a pond before you hire an excavator?
Bradford’s Building Department says it does not issue pond permits. It directs owners to Planning and Zoning first to check whether a pond is allowed in the district and whether the proposed location fits the lot under county rules. Ask Zoning which water management district serves the parcel, then check with that district about any separate review before starting excavation.
Read the official guidanceDocument a single-family septic application
For a single-family residence needing an onsite sewage system, provide proof you applied for the septic construction permit when you apply for the building or plumbing permit. Florida law bars requiring an issued septic construction permit as a condition of issuing either permit. Confirm separate installation requirements for a manufactured-home placement.
Start with the Building Official for past unpermitted work
If a licensed contractor did the work without a permit, the county directs owners to speak with the Building Official. The county also publishes separate current and archived permit searches, so check both when the work is older.
Before you submit
- Gather the original permit number and any final inspection documentation.
- For a single-family residence using septic, include proof of the onsite sewage permit application.
- Use the application packet for the specific work instead of relying on a generic permit form.