City and county jurisdiction
Use Charlotte County Building Construction Services for its jurisdiction; check City of Punta Gorda or another applicable local office for parcels inside municipal limits.
Who handles this address?
Filing instructions
Order the survey and plan the flood inspections
For a new or replacement single-family house, Charlotte County calls for a signed and sealed survey less than a year old with flood zone, panel and topographic information. That survey and the drainage plan are useful early orders for the project team.
- Show elevations at the building, property lines and corners, proposed finished-floor elevations, easements and the proposed driveway. Include distances to the seawall or mean high-water line where applicable.
- Paper applicants provide two original signed/sealed sets. Online applicants provide one digitally signed/sealed set with third-party verification. Use the full product approval number, including the decimal identifying the selected configuration.
- For a house in a Special Flood Hazard Area, schedule the surveyor twice. The county requires the under-construction elevation certificate approved before roof sheathing inspection and the final one approved before requesting final inspections.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- V-zone design certificate (PDF)charlottecountyfl.gov
For new construction in a VE zone under county jurisdiction, have the registered design professional certify the foundation and design conditions.
Official source - Elevation certificate and instructions (PDF)charlottecountyfl.gov
For a county project requiring elevation verification, arrange the under-construction certificate before the lintel pour and the final certificate before scheduling final inspections.
Official source - Non-conversion agreement for lower enclosures (PDF)charlottecountyfl.gov
For a permitted enclosure below the elevated floor, use the county’s recordable agreement to identify the enclosed area and its allowed uses.
Official source - Floodway no-impact/no-rise certification (PDF)charlottecountyfl.gov
If the project requires a floodway encroachment analysis, give this county certification to the engineer preparing the hydraulic analysis.
Official source
Building and zoning contacts
Building permits
Charlotte County Building Construction
- Phone
- 941-743-1201
- Email or contact form
- [email protected]
- Office address
- 18400 Murdock Circle, Port Charlotte, FL 33948
- Office hours
- Mon, 9 a.m.–4 p.m.; Tue–Fri, 7:30 a.m.–4 p.m.
Planning and zoning
Charlotte County Planning & Zoning
- Phone
- 941-743-1964
- Email or contact form
- [email protected]
- Office address
- 18400 Murdock Circle, Port Charlotte, FL 33948
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Are flood panels an alternative to raising a home?
Charlotte County says it does not permit attached flood panels or other dry-floodproofing systems on residential buildings in a Special Flood Hazard Area. A proposal from a panel supplier is not a substitute for required elevation for new construction, substantial improvements, or repairs of substantially damaged homes. Confirm the property’s flood status and ask the county which options apply before buying panels or committing to a repair scope.
Read the official guidancePlan for survey and drainage at both ends of the job
For a new single-family home, provide a signed and sealed survey less than a year old with the flood zone, map panel and topography. Include a proposed drainage plan at intake and obtain an as-built drainage survey before final inspections.
Schedule flood documentation around inspections
In a Special Flood Hazard Area, the single-family guide calls for an under-construction elevation certificate before roof sheathing inspection and a final certificate before final inspections are requested. The county also flags a no-impact certification for specified work in a regulatory floodway.
Before you submit
- Obtain current boundary and topographic survey information.
- Coordinate finished grades, easements and the drainage survey before building.
- Put applicable elevation certificates on the inspection schedule.