City and county jurisdiction
Use Citrus County Building Division for unincorporated property. Inside the city limits of Crystal River or Inverness, submit the building application to that city.
Who handles this address?
Filing instructions
Use Accela for county filings after the portal change
Citrus moved Building, Fire and Land Development permitting to a new system on September 14, 2026. Use the Building Division’s Accela link for new county filings. Inside Crystal River or Inverness city limits, the county directs applicants to the city building department.
- Confirm the site is outside both cities before choosing a county permit type. The residential forms page points to separate septic/well resources and includes manufactured-home, generator and tree-preservation materials.
- Follow the Building Division’s current account, license-registration and digital-signature instructions. Its Accela tutorials cover uploading an application, answering review comments and requesting inspections.
- For filing help, contact [email protected] or 352-527-5310. The page lists the Lecanto counter at 3600 W. Sovereign Path, Suite 111, open weekdays 9 a.m.–4 p.m.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- V-zone design certificate (PDF)cms5.revize.com
For a county-reviewed V-zone building, give Citrus County’s design certificate to the engineer or architect. It records the flood elevations used in design and applicable foundation and breakaway-wall certifications.
Official source - Floodplain substantial improvement packet (PDF)citruscounty.gov
For a proposed improvement that needs a county floodplain cost review, mark the work areas on the floor plan and use the cost and affidavit forms in this packet.
Official source - Substantial improvement and damage repair packet (PDF)citruscounty.gov
For repairs to a damaged building in county floodplain review, identify the damaged and proposed work on the plans, list the repair costs and complete the packet’s affidavits.
Official source
Building and zoning contacts
Building permits
Citrus County Building Division
- Phone
- 352-527-5310
- Email or contact form
- [email protected]
- Office address
- 3600 W. Sovereign Path, Suite 111, Lecanto, FL 34461
- Office hours
- Mon–Fri, 9 a.m.–4 p.m. at the counter
Planning and zoning
Citrus County Land Development / Zoning
- Phone
- 352-527-5310
- Email or contact form
- [email protected]
- Office address
- 3600 W. Sovereign Path, Suite 140, Lecanto, FL 34461
- Office hours
- Mon–Fri, 8 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Will a detached workshop have to match the house?
Citrus County’s residential accessory-use standards address exterior color and material compatibility for accessory structures on lots under two acres. They include an exception for detached accessory structures of 1,200 square feet or less. Check your lot size, whether the workshop is detached, and the workshop’s proposed area before ordering finishes. The appearance exception does not resolve setbacks, permitted use or building review.
Read the official guidanceOpen the Accela application
Citrus moved building, fire and land development applications to a new system on September 14, 2026. The Building Division links directly to Accela for current filings and publishes tutorials for registration, corrections and inspections.
Screen both the lot and the proposed building area
Locate the proposed building and access on the flood map. Ask Land Development which elevation and stormwater documents the parcel needs. The county’s residential forms page includes a finished-floor waiver application for projects seeking that review.
Before you submit
- Confirm city boundaries with the parcel number.
- Check the applicable flood map and proposed building location.
- Open the Building Division’s Accela link and choose the residential form for the scope.