City and county jurisdiction
Use county CityView for Collier County permits; verify municipal procedures separately for projects inside Naples or Marco Island.
Who handles this address?
Filing instructions
Identify who maintains the road before filing
For new construction on a county-maintained right-of-way, Collier must issue the right-of-way permit before it can issue the house permit. Identify who maintains the road when you first review the parcel.
- In the portal choose Building, Remodel & Accessory Permits, then 1–2 Family Home. Select the scope and identify utilities, water disposal, bedrooms and stories. New houses, additions and guest houses use the PRFH guidance.
- Identify road-crown elevation, flood zone, base flood elevation and proposed finished floor on the site plan. The county may require recent certification when new impervious area exceeds 400 square feet.
- Check the parcel-specific attachments. Lots of at least one acre need a vegetation removal affidavit, and parcels in the Rural Fringe Mixed Use District need the preservation review form. Owner-builders sign their disclosure in person before county staff.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- V-zone and Coastal A-zone design certificate (PDF)collier.gov
For applicable county projects, the engineer or architect signs and seals the design certification, including the breakaway-wall section when triggered. Submit surveyed elevations separately.
- Elevation certificate for floodplain review (PDF)collier.gov
For a county permit requiring elevation verification, have the survey professional complete the certificate for the construction stage identified by the floodplain reviewer.
Official source - Elevation certificate intake sheet (PDF)collier.gov
Attach this cover sheet with the permit number when submitting an elevation certificate for county review.
Official source - Non-conversion agreement for enclosures and accessory structures (PDF)collier.gov
Use the county’s land-restriction form when floodplain review requires it for a lower enclosure, qualifying crawlspace or unelevated accessory structure.
Official source - Temporary flood-panel checklist for commercial or mixed-use buildings (PDF)collier.gov
For a commercial or mixed-use residential project proposing temporary flood panels, use this checklist to assemble the permit application, panel plans and supporting information.
Official source
Building and zoning contacts
Building permits
Collier County Permitting / Building
- Phone
- 239-252-2400
- Email or contact form
- [email protected]
- Office address
- 2800 Horseshoe Drive N., Naples, FL 34104
- Office hours
- Main permitting office: Mon–Fri, 9 a.m.–5 p.m.
Planning and zoning
Collier County Zoning Services
- Phone
- 239-252-5603
- Email or contact form
- Check the official site
- Office address
- 2800 Horseshoe Drive N., Naples, FL 34104
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Does a condo window replacement need a threshold inspector?
Collier County’s Building Department says like-for-like window or door replacement, and specified shutter work, do not require a threshold inspector when no structural work extends beyond removing and replacing the openings. Ordinary building permits and inspections still apply. If the project changes opening sizes, framing or other structural elements, ask the plans examiner what inspection requirements apply before using the simpler replacement path.
Read the official guidanceUse the right CityView application
Collier publishes separate CityView guides for building, fire, right-of-way and well applications. Select the relevant application for each item rather than putting every approval into the building permit record.
Coordinate elevation and floodproofing documents early
Collier publishes building-in-floodplain guidance and separate forms for floodproofing and V-zone design. Confirm what applies to the exact structure and site, including road elevation information where requested, before finalizing the floor elevations.
Before you submit
- Verify county or municipal review and the parcel’s flood classification.
- Check for separate fire, well or right-of-way applications.
- Confirm which floodplain forms and elevation data apply to the proposal.