City and county jurisdiction
Start with the Columbia County Building Department for county-jurisdiction properties. Confirm which building and zoning office applies to a parcel inside Lake City or another municipality.
Who handles this address?
Filing instructions
Choose the contractor or owner-builder packet
Columbia separates its application packets by who will pull the permit. The county’s combination permit covers multiple trades, but each subcontractor performing the work must still be identified.
- Choose the contractor or owner-builder version from the document library. Collect the deed or Property Appraiser parcel details, verify the 911 address, and obtain the owner’s signature on page two. Owner-builders also need the notarized disclosure.
- For a new house, follow the site-plan checklist. For city water or sewer, obtain the availability letter. The Ellisville system has a separate review contact. If the single-family residence uses septic, include proof that you applied for the septic permit when filing for a building or plumbing permit.
- Identify whether the driveway already exists. The county offers verification for an existing drive and requires a right-of-way application if it has no record. On a state-maintained road, obtain FDOT approval before permit issuance.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Floodplain notice to applicant (PDF)columbiacountyfla.com
If the county requests its flood notice, the owner acknowledges the stated risk and signs with the parcel number or address.
Official source - Product approval specification sheet (PDF)columbiacountyfla.com
Use this sheet to list approval numbers, manufacturers and models for regulated components in the residential plan set.
Official source - Existing slab affidavit (PDF)columbiacountyfla.com
For new work proposed on an existing slab, review and complete the county’s slab affidavit when the Building Department requests it.
Official source
Building and zoning contacts
Building permits
Columbia County Building Department
- Phone
- 386-758-1008
- Email or contact form
- [email protected]
- Office address
- 135 NE Hernando Ave., Suite B-21, Lake City, FL 32055
- Office hours
- Mon–Fri, 8 a.m.–4:30 p.m.
Planning and zoning
Columbia County Building & Zoning Division
- Phone
- 386-758-1008
- Email or contact form
- [email protected]
- Office address
- 135 NE Hernando Ave., Suite B-21, Lake City, FL 32055
- Office hours
- Mon–Fri, 8 a.m.–4:30 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Can a driveway permit hold up final occupancy?
Columbia County’s driveway application separates access approval from whether the parcel is buildable. It tells applicants with an existing driveway to choose Verify Existing Drive rather than a new connection. If a driveway permit is required, the county says its final inspection must pass before the building permit can receive final completion or occupancy. Schedule that inspection before planning a move-in date.
Read the official guidanceUse the proposed site-plan and residential checklists together
The county’s owner-builder package has a separate site-plan checklist and a minimum residential plan checklist. Use both to coordinate the proposed location with the signed design documents.
Verify requirements before moving an existing manufactured home
The county has a new-or-used mobile-home application and has published a pre-inspection requirement for a used unit being placed or relocated. Confirm the current packet and the licensed installer’s responsibilities before transport.
Before you submit
- Select site-built, owner-builder or mobile-home forms as applicable.
- Measure the proposed location on the parcel instead of relying on a sketch alone.
- For a relocated unit, ask about pre-inspection and retain the existing unit records.