City and county jurisdiction
Dixie County Building and Zoning enforces county rules in unincorporated Dixie. In Horseshoe Beach, check the town’s separate land development review steps and verify the building permit route.
Who handles this address?
Filing instructions
A Horseshoe Beach project starts at Town Hall
For work covered by the Town of Horseshoe Beach’s building process, contact Town Hall first. The town supplies the paperwork for Dixie County based on the work described and directs applicants to schedule a review with its land development administrator through the county.
- For a county filing, bring the deed or contract for deed. A person applying on the owner's behalf who is neither the owner nor the contractor needs the owner’s notarized authorization.
- For a dock, boathouse or seawall, use the marine packet. Its checklist asks for a water-management permit or DEP exemption, a scaled site plan showing canal width, the share of the canal occupied, property-line setbacks and the town compliance paperwork where applicable.
- For an electrical, plumbing, mechanical or roofing subcontract, use the division-two application and identify the master permit number. The older residential worksheet still prints a prior code edition, so confirm the applicable edition with Building before preparing plans.
Permit applications and filing portals
Filing resources reviewed .
- County online permit applicationsdixiecounty.portal.iworq.net
- Horseshoe Beach town approval instructionstownofhorseshoebeachfl.com
- Residential permit worksheet (PDF)dixiecounty.us
- Marine application and site-plan checklist (PDF)dixiecounty.us
- Trade subcontractor application (PDF)dixiecounty.us
- County zoning, land-use maps and formsdixiecounty.us
Supporting documents for your project
- Dixie County Notice of Commencement (PDF)dixiecounty.us
When your job requires a recorded notice, use the county form to identify the owner, contractor, property and work before recording it.
Official source
Building and zoning contacts
Building permits
Dixie County Building & Zoning
- Phone
- 352-498-1236
- Email or contact form
- Check the official site
- Office address
- 387 SE 22nd Ave., Cross City, FL 32628
- Office hours
- Mon–Fri, 8 a.m.–noon and 1–5 p.m.
Planning and zoning
Dixie County Building & Zoning
- Phone
- 352-498-1236
- Email or contact form
- Check the official site
- Office address
- 387 SE 22nd Ave., Cross City, FL 32628
- Office hours
- Mon–Fri, 8 a.m.–noon and 1–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Can the driveway hold up final power?
Dixie County’s residential application says driveway approval must be submitted before final power release. For a new house or conversion that needs a power release, confirm who approves the driveway and get that paperwork into the building permit file before scheduling the final utility connection. This is a separate closeout item from the site plan and septic or sewer documents supplied with the residential application.
Read the official guidanceDocument the proposed residential use and wall assembly
For a barn or utility conversion, Dixie’s residential application calls for engineering showing residential use and a wall section with construction methods, including moisture-barrier details.
Provide survey, siting and wastewater information
Dixie’s residential checklist asks for a signed survey, a scaled site plan and wastewater documentation. For a single-family home using septic, Florida law allows the building or plumbing permit to issue on proof of the septic permit application. Show where the proposed system fits on the parcel.
Before you submit
- Confirm town or county location for the exact parcel.
- Collect a signed survey and existing structure photos for a conversion.
- Gather proof of the septic application or the sewer-company letter and prepare a scaled site plan.