City and county jurisdiction
The consolidated City of Jacksonville Building Inspection Division handles Jacksonville permits. Jacksonville Beach, Atlantic Beach, Neptune Beach and Baldwin maintain separate building and zoning offices.
Who handles this address?
Filing instructions
Confirm Jacksonville’s jurisdiction before opening JaxEPICS
Atlantic Beach, Jacksonville Beach, Neptune Beach and Baldwin maintain their own zoning and building departments. For property served by the consolidated City of Jacksonville, use JaxGIS to look up the address or ten-digit real estate number, then file electronically in JaxEPICS.
- For a new home or addition, prepare a scaled site plan showing the footprint and distances to property lines. Jacksonville’s residential guide calls for a survey as well if the legal description is by metes and bounds. Show the septic system and well where used.
- Upload the Permission to Obtain Permits form with your application. Place PDF plans in the folders for each discipline. If a separate approval is needed, such as historic preservation or the Downtown Investment Authority, upload its confirmation to Correspondence.
- Select Submit For Review after uploading. An assigned permit number can still have Not Submitted status. Jacksonville says building plan review begins after the applicable development reviews and payment of the review fee.
Permit applications and filing portals
Filing resources reviewed .
- JaxGIS parcel, zoning and land-use lookupmaps.coj.net
- Apply and track the application in JaxEPICSjaxepics.coj.net
- Electronic plan filing and review statusesjacksonville.gov
- Permission to Obtain Permits (PDF)jacksonville.gov
- Owner-builder disclosure (PDF)jacksonville.gov
- Residential plan and site requirementsjacksonville.gov
Supporting documents for your project
- Jacksonville Product Approval Information Sheet (PDF)jacksonville.gov
For applicable building components, list the manufacturer, code version and Florida approval number with its suffix for the specific permit.
Official source - Jacksonville window and door replacement worksheet (PDF)jacksonville.gov
For replacements reviewed by Jacksonville, list the openings, area, model, design pressure and approval number. The worksheet identifies the entries the property owner must complete.
Official source - Jacksonville new one- and two-family building checklist (PDF)jacksonville.gov
Use this building-plan checklist before submitting a new one- or two-family project in JaxEPICS. The Jacksonville Beach, Atlantic Beach, Neptune Beach and Baldwin offices have separate filing routes.
Official source
Building and zoning contacts
Building permits
Jacksonville Building Inspection Division
- Phone
- 904-255-8500
- Email or contact form
- [email protected]
- Office address
- 214 N. Hogan St., 2nd Floor, Jacksonville, FL 32202
- Office hours
- Mon–Fri, 7 a.m.–4 p.m. ET
Planning and zoning
Jacksonville Development Services — Zoning
- Phone
- 904-255-8300
- Email or contact form
- [email protected]
- Office address
- 214 N. Hogan St., 2nd Floor, Jacksonville, FL 32202
- Office hours
- 7 a.m.–4 p.m. ET
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Building on a Jacksonville planned development? Start with PUD verification.
If a parcel is zoned Planned Unit Development, Jacksonville requires its PUD Verification process through the Current Planning Division before construction plans for site-development review are submitted. The city also calls for preliminary site-plan review in specific cases, including multiple multifamily buildings under one ownership on a lot. Establish those review steps before setting a design or filing schedule.
Read the official guidanceFile in JaxEPICS for Jacksonville
Jacksonville requires electronic permit submission through JaxEPICS. Its commercial permitting instructions call for application documents and specifications in PDF format.
Check whether the new use changes the review
Jacksonville says a building permit for converting use needs at least a life-safety plan and code summary from a Florida-licensed design professional. Ask whether a separate Certificate of Use is needed for the business.
Plan for the first inspection
Have the approved permit drawings available at the job site in a weatherproof container. Check the city’s instructions for posting the permit and any applicable recorded Notice of Commencement.
Before you submit
- Verify city limits and permit authority using the project address.
- Bring any prior certificate, occupancy information and proposed tenant layout.
- Identify who will upload plans and keep the approved set on site.