City and county jurisdiction
Escambia County Building Services handles permits and inspections in unincorporated Escambia County and the Town of Century. Confirm the address jurisdiction and any separate zoning approvals before choosing an application; a Pensacola mailing address is not enough to establish city jurisdiction.
Who handles this address?
Filing instructions
Pensacola, Pensacola Beach and Century follow different routes
Escambia County Building Services handles unincorporated property and the Town of Century. A Pensacola Beach job needs prior Santa Rosa Island Authority approval. In Century, submit the town’s approval. The City of Pensacola has its own inspection office.
- Use the jurisdiction box on the building application. Include the parcel number, proposed scope, and a plot plan showing lot dimensions, existing and proposed structures and distances to the lot lines.
- For a new house, assemble wind-design construction details and the applicable sewer or septic evidence. For windows, exterior doors, shutters and roofing, identify each product by manufacturer, model and full Florida approval number, including the decimal suffix.
- For new construction in a Special Flood Hazard Area, the application asks for elevation certificates at application, before the framing inspection and before final inspection. If the site is also in a designated floodway, arrange the engineer’s no-rise certification before issuance.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Flood repair packet with damage worksheet and affidavits (PDF)myescambia.com
For a flood-damaged home in a Special Flood Hazard Area, itemize repairs on the damage worksheet. The packet adds owner and contractor damage affidavits for a nonconforming structure.
Official source - FEMA Elevation Certificate for flood-zone construction (PDF)fema.gov
For new construction in a Special Flood Hazard Area, Escambia asks for certificates at application, before framing inspection and before final inspection. A new V-zone building also needs a separate original, signed and sealed V-zone certification.
Official source - Roofing inspection affidavit (PDF)myescambia.com
For an Escambia or Pensacola reroof using this affidavit, document the permitted job and the concealed roof work the signer inspected.
Official source
Building and zoning contacts
Building permits
Escambia County Building Services
- Phone
- 850-595-3550
- Email or contact form
- [email protected]
- Office address
- 3363 West Park Place, Pensacola, FL 32505
- Office hours
- Check the official site
Planning and zoning
Escambia County Development Services — Planning and Zoning
- Phone
- 850-595-3475
- Email or contact form
- [email protected]
- Office address
- 3363 West Park Place, Pensacola, FL 32505
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Set the removal date before placing a temporary site office
Escambia’s Temporary Structures – Planning Land Use Permit covers uses such as construction offices and portable storage containers. The form asks for start and removal dates and a site plan locating the structure against the building and lot lines. It flags stays longer than 180 days for Development Review Committee approval. If the job may run that long, discuss the extended placement with Planning before booking delivery.
Read the official guidanceUse the county permit intake
Escambia links to MyGovernmentOnline for contractor and public access. Its permitting page says it needs a completed application with the applicant contractor’s notarized signature before assigning a permit number.
Account for beach or Century approvals
For projects on Pensacola Beach or in the Town of Century, the county’s mechanical permit packet calls for the applicable prior approval to accompany the building application.
Match the notice to the scope
Escambia publishes separate Notice of Commencement cost thresholds for general work and HVAC changeouts. Confirm which threshold applies and when the recorded copy is needed.
Before you submit
- Confirm county or city jurisdiction from the parcel, not the mailing address.
- If on Pensacola Beach or within Century, identify the required prior approval.
- Match the scope to the correct building or trade application.