City and county jurisdiction
Glades County Community Development publishes the county building and site-plan forms. For a parcel within the City of Moore Haven, confirm the applicable city approvals and building intake.
Who handles this address?
Filing instructions
A city-limit check and a scaled site plan belong at the front of the packet
Glades County Planning administers land-use rules in the unincorporated county and can issue land-use verification letters. For a parcel inside Moore Haven, the city publishes its own site-plan and zoning applications.
- On the county site plan, show lot shape and dimensions, adjacent roads, existing and proposed structures, distances to the lot lines and each other, and the well or septic system where present. For new structures in an RV or mobile-home park, also show clearances to the nearest structures on adjacent lots.
- The construction or renovation packet sets out county survey requirements and its scope-specific exceptions. Match the survey, plans and site sketch to the same legal description and label what is existing and what you propose.
- For a structure in a Special Flood Hazard Area, check the building supplement for the flood map panel number and date, mapped zone, base flood elevation and vertical datum. The county lists a different floodplain review form for development that does not require a building permit. Use the county’s iWorQ portal for the filing.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Special Flood Hazard Area building permit supplement (PDF)cms2.revize.com
Attach the flood supplement to the building application when floodplain review applies. It records the zone, base and design flood elevations, and the planned treatment of lower enclosures.
Official source - Special Flood Hazard Area development application (PDF)cms2.revize.com
Use this floodplain application for development outside the building-code permit process, such as grading, filling, excavation or storage. Associated buildings need their own review.
Official source - FEMA Elevation Certificate for floodplain review (PDF)fema.gov
For work covered by the county flood supplement, confirm which elevation record is due when the lowest floor is placed and which final record is needed at closeout.
Official source
Building and zoning contacts
Building permits
Glades County Community Development — Building
- Phone
- 863-946-6018
- Email or contact form
- [email protected]
- Office address
- 198 6th St., Moore Haven, FL 33471
- Office hours
- Mon–Fri, 8 a.m.–4:30 p.m. ET
Planning and zoning
Glades County Community Development — Planning and Zoning
- Phone
- 863-946-6018
- Email or contact form
- [email protected]
- Office address
- 198 6th St., Moore Haven, FL 33471
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Order the boundary and topographic survey before major site-plan intake
For a project routed to major site-plan review, Glades County’s packet asks for a signed and sealed boundary and topographic survey with the legal description, stormwater calculations and design for county engineer review, and a list of applicable permits being pursued. The first staff review calls for one copy of each item, with more copies requested later for the board. Order the survey and drainage work before targeting a hearing.
Read the official guidanceDetermine the site-plan route first
The county’s major site-plan packet says site-plan approval precedes building permit issuance. A project classified as major goes to the Planning and Zoning Board for a public hearing.
Separate flood-area site work from the building permit
The county’s flood-hazard development form lists grading, fill and related improvements. It directs applicants to permit associated buildings and structures separately using the applicable building-permit supplement.
Before you submit
- Record the parcel ID, proposed use and whether the scope changes the site.
- Confirm whether staff or the Planning and Zoning Board reviews the site plan.
- Mark fill, grading and proposed utilities separately if a flood-hazard supplement applies.