City and county jurisdiction
Use Hendry County Building and Licensing for county-administered permits. The county publishes counters in LaBelle and Clewiston, but a mailing address or counter location does not determine which agency issues a permit inside city limits.
Who handles this address?
Filing instructions
Clewiston city limits and Montura Ranch use different permit offices
Clewiston uses its city GovWell portal for work inside city limits. A Clewiston mailing address can also be in Montura Ranch, Harlem, Flaghole or Pioneer. The city directs applicants in those communities to Hendry County.
- For a county application, select the homeowner or contractor link on Building & Licensing. The county lists separate BS&A entry points. Identify the parcel and check zoning with County Planning before completing the site layout.
- Confirm who approves the driveway. The county’s residential instructions direct Montura Ranch applicants to Central County Water Control District and Gerber Groves applicants to Gerber Groves Water Control District. State road frontage can involve FDOT.
- Show the proposed finished floor elevation, structures, access, utilities and drainage on the site plan. Include the signed and sealed boundary survey identifying the flood zone. Document the water and sewer arrangements, or provide proof of septic application for a single-family building or plumbing permit. Final approval of the septic installation is needed before occupancy.
- Use the county’s single-family plan review guide alongside the general permit application. The guide covers site data, floor plans, framing and other sheets that Building reviews for a new house.
Permit applications and filing portals
Filing resources reviewed .
- County application entry points for owners and contractorshendryfla.net
- Building permit application and checklist (PDF)cms2.revize.com
- Single-family plan review guide (PDF)cms2.revize.com
- Hendry County Planning and Zoninghendryfla.net
- Clewiston city permits and boundary guidanceclewiston-fl.gov
- Florida single-family septic filing rule (PDF)laws.flrules.org
Supporting documents for your project
- FEMA elevation certificate and instructions (PDF)fema.gov
When Building requests elevation documentation, give the surveyor the FEMA form linked by the county. For an existing structure, ask [email protected] whether a certificate is already on file.
Official source - County right-of-way usage permit (PDF)cms2.revize.com
Use the Engineering Department’s application when the proposed driveway, culvert or related work will occupy a county right-of-way. Identify the road, location and scope of the work.
Building and zoning contacts
Building permits
Hendry County Building and Licensing
- Phone
- 863-675-5245
- Email or contact form
- [email protected]
- Office address
- 640 S. Main St., LaBelle, FL 33935
- Office hours
- Mon–Fri 8 a.m.–5 p.m. ET
Planning and zoning
Hendry County Planning and Zoning
- Phone
- 863-675-5240
- Email or contact form
- [email protected]
- Office address
- 640 S. Main St., LaBelle, FL 33935
- Office hours
- Mon–Fri, 8 a.m.–5 p.m. ET
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Price the actual use and district, not just the building area
When budgeting a Hendry County development, start at the county impact-fee page rather than applying one rate to every project. Its schedule separates development types, and its maps identify transportation benefit districts. Have the parcel location and proposed use on hand when confirming the applicable district and rate with the county, particularly before committing an allowance in a construction budget.
Read the official guidanceCheck the residential site information first
The county’s residential packet asks for parcel, zoning, future land use, setbacks and flood information. Resolve missing site information before completing the building set.
Use the current valuation and identification forms
The county’s building application includes a plan compliance and job-site identification form. Its valuation instructions include labor, design fees, site preparation, material and included subtrades; distinguish work under separate permits.
Before you submit
- Pull the parcel record and verify city limits.
- Gather the survey, proposed setbacks and flood information.
- Split the estimate between work included in the application and any separately permitted scope.