Highlands County Permits: Driveway and Parcel Checks

Highlands County’s residential permit process can involve Engineering for access as well as Planning and Zoning for the site. A new driveway or a change to an existing entrance is worth flagging while the plans are still flexible.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Highlands County.

Build a new house

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

For a county parcel, apply in eTRAKiT with the residential application, sealed plans and the residential review checklist. Keep the boundary survey for intake and the location survey for occupancy.

Zoning and site review

Coordinate Planning, Zoning and 911 Addressing. A county driveway permit and preliminary Engineering inspection are part of the new-construction process.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

Use eTRAKiT and the residential application for an addition or enclosure. The county’s residential additions guide covers plans, trusses and energy documentation for the expanded area. For interior-only work, identify the trades affected at intake.

Zoning and site review

For an extension, show lot boundaries and setbacks on the scaled site plan. Ask about septic review for added habitable space and flood documentation for remodeling in a special flood hazard area.

Forms and filing links

Official project guidance
Replace or repair a roof

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

Use the county roofing application to distinguish repairs, removal and replacement, or a mobile-home roof-over. Supply the parcel strap, contract price and covering type. The form lists sheathing, dry-in and final inspections.

Zoning and site review

Describe any structural alteration separately. If roof work adds an enclosure or changes the footprint, use the residential application and check setbacks with County Zoning.

Forms and filing links

Official project guidance
Build a shed, garage or accessory structure

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

Use eTRAKiT and the county accessory-structure checklist for a garage, shed or other detached structure. The checklist identifies anchoring, truss engineering and product approvals where applicable.

Zoning and site review

The survey/site plan must identify corner and road elevations, drainage, flood zone, setbacks on all sides, easements and preserve areas.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

Use the county project-forms page and apply through eTRAKiT. For a residential pool, include the swimming pool affidavit identifying the protection method with the pool permit submission.

Zoning and site review

Use the county plot-plan worksheet to locate the pool, house and easements. Confirm pool setbacks and any required enclosure clearance with County Zoning before finalizing the layout.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Building permit

Give Highlands County Building Division the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Highlands County Planning and Zoning to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

Use Highlands County Development Services for county-administered permits. For a site in Sebring, Avon Park or Lake Placid, verify the issuing office and any municipal zoning requirements before applying.

Who handles this address?

Filing instructions

Line up the driveway and address before permit issuance

For a county new home, submitting the building drawings starts only one part of the review. The county’s residential instructions identify Zoning, Planning and 911 Addressing approvals, along with an Engineering driveway permit and preliminary inspection.

  1. Inside the City of Sebring, use the city’s construction application and residential checklist. For a county parcel, use Highlands County eTRAKiT. Select a contractor account if licensed or a public user account if applying as a property owner.
  2. Prepare the site plan, sealed drawings, window and door schedules, truss layout and energy documentation. For a single-family home on septic, include proof that the septic application was submitted with the building or plumbing application. Florida law allows building permit issuance while the separate septic permit is pending. Final system approval is required for occupancy.
  3. Ask Engineering about the driveway preliminary inspection early. For new construction the county also lists a boundary survey at permitting and a location survey before the certificate of occupancy.
  4. Looking up earlier work on the house? The county keeps records through April 29, 2026 in eGov and directs searches from April 30, 2026 forward to eTRAKiT.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Highlands County Building Division

Email or contact form
[email protected]
Office address
501 S. Commerce Ave., Sebring, FL 33870
Office hours
Check the official site
Official department website

Planning and zoning

Highlands County Planning and Zoning

Email or contact form
[email protected]
Office address
501 S. Commerce Ave., Sebring, FL 33870
Office hours
Mon–Fri, 8 a.m.–5 p.m. ET
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

A job under $7,500 is not automatically exempt

Highlands County directs owners of eligible single-family jobs valued under $7,500 to submit a Permit Exemption Request in eTRAKiT or apply with proof of value at the Building Department. The exemption took effect July 1, 2026, and excludes flood-zone properties and structural, plumbing, electrical, fuel-gas or mechanical alterations. Check the parcel and scope before assuming a small quote means no permit.

Read the official guidance

Confirm driveway sequencing with Engineering

The county’s residential permitting guide says that when an Engineering driveway permit is required, that permit and a preliminary inspection come before the building permit. Verify whether the proposed access requires this step.

Review zoning and permit history in the county tools

Planning and Zoning provides zoning and land-use map resources. Highlands County’s eTRAKiT site provides permit tools; use the parcel and address to check the record and confirm the appropriate intake path.

Before you submit

  • Confirm the driveway location and road authority.
  • Check the parcel’s current zoning and land use.
  • Verify address and prior county permit records before preparing the application.

Additional official references