Indian River County Permits and Flood Map Checks

For an Indian River County project, match the application to the local permit checklist and prepare the drawing files before uploading. A Vero Beach address is also a reason to check which city planning paperwork applies.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Indian River County.

Build a new house

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Choose the issuing jurisdiction in MGO Connect and complete the one- and two-family application. Assemble the plot plan, energy calculations, truss documents and exterior product approval affidavit.

Zoning and site review

The county checklist routes the project to Planning and Public Works. A Vero Beach lot also needs the city’s minor site-plan application. Waterfront or oceanfront lots can require soils and coastal approvals.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Use the residential addition/alteration application with MGO Connect. Identify any change in the footprint or conditioned area because the checklist ties supporting documents to those changes.

Zoning and site review

The county lists Planning and Public Works review and Environmental Health for a site with a well or septic. A change in footprint triggers the additional plot-plan requirement. Inside Vero Beach, use the city Planning form.

Forms and filing links

Official project guidance
Replace or repair a roof

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Use the standard reroof application for the roof system you are installing. Identify existing and proposed materials, slope and product approvals. A switch from lightweight covering to heavy tile requires structural verification from a Florida design professional.

Zoning and site review

Confirm the parcel’s jurisdiction in MGO. If the proposed roof also covers a new addition, include the separate site review and drawings required for an expanded footprint.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Use the pool permit/checklist for the type of pool, then submit in MGO Connect. Above-ground pools require a legible site plan and the manufacturer’s specifications.

Zoning and site review

Planning and Public Works review the layout. The checklist identifies waterfront properties requiring a soils investigation and circumstances where DEP approval applies.

Forms and filing links

Official project guidance
Repair flood or storm damage

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

File for the repair or alteration through MGO. Complete the county flood-zone/substantial-improvement form when requested to document the existing building’s value and the proposed cost of work.

Zoning and site review

Ask the floodplain reviewer for the determination before beginning repairs. A Vero Beach coastal high-hazard project may also need the city’s V-zone design certificate with the design plans.

Forms and filing links

Official project guidance
Place or replace a manufactured home

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Submit the county/city mobile-home application, evidence of job value, manufacturer’s blocking plan, installation instructions and floor plan through MGO.

Zoning and site review

Show whether the unit will be in a mobile-home park or on a residential lot. In a park, the plan must match field conditions and show distances to other structures and property lines.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Building permit

Give Indian River County Building Division the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Indian River County Planning Division / Planner of the Day to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

The county Building Division serves unincorporated Indian River County and the City of Vero Beach. Confirm the permitting and zoning offices by address before filing in another municipality.

Who handles this address?

Filing instructions

Vero Beach adds a city planning application to the county packet

The combined Indian River County/City of Vero Beach housing permit covers one- and two-family work. A project inside Vero Beach also needs the city’s Planning site-plan application. Select the right project and jurisdiction in MGO Connect before uploading documents.

  1. For a new home, arrange review with Planning, Public Works and the utility serving the site. The county checklist also calls for Environmental Health review where the property uses a septic system or well.
  2. Use the housing packet to assemble the plot plan, energy calculations, truss information and product approval affidavit. The checklist identifies which items depend on a change in the building footprint or conditioned area.
  3. For new waterfront construction, the checklist calls for a signed and sealed soils investigation. Oceanfront work seaward of the Coastal Construction Control Line adds a separate approval, and sites in the turtle protection zone receive additional review.
  4. Track Planning, Public Works and utility sign-offs while Building routes the plans. For a single-family residence needing septic, submit proof of septic application at building or plumbing intake. Final installation approval is required for occupancy.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Indian River County Building Division

Email or contact form
[email protected]
Office address
1801 27th Street, Vero Beach, FL 32960
Office hours
Mon–Fri, 8:30 a.m.–5 p.m. ET
Official department website

Planning and zoning

Indian River County Planning Division / Planner of the Day

Email or contact form
Check the official site
Office address
1801 27th Street, Vero Beach, FL 32960
Office hours
Mon–Fri, 8:30 a.m.–5 p.m. ET
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Replacing the contractor on an open permit?

The county and Vero Beach share a Change of Contractor packet. The usual route is to submit notarized notices from the owner, outgoing contractor and incoming contractor together. If the outgoing contractor won’t sign, the packet describes a certified-mail route and a 10-calendar-day response window after receipt. If the original permit was canceled, check the new-permit path instead of assuming it can be transferred.

Read the official guidance

Use the MyGovernmentOnline permit portal

The county uses MGO for building permits and inspections. Review the county’s upload naming guide and electronic-construction-document instructions before assembling plan PDFs.

Start with the county’s flood maps

Indian River County says it reviews permits using the FEMA maps that became effective January 26, 2023. Use the county’s map resources for the site instead of relying on an older report.

Before you submit

  • Project address and municipality
  • Permit type and matching checklist
  • Plan PDFs named for the portal and available flood or survey information

Additional official references