City and county jurisdiction
Use Lafayette County Building and Planning & Zoning for county review. Confirm whether any municipal approval also applies if the site is inside the Town of Mayo.
Who handles this address?
Filing instructions
Draw the site plan to scale and measure to the nearest lot line
Lafayette County allows a residential site plan on any paper size if the drawing has a scale and the required details. For a house or addition requiring zoning or health review, show the work in relation to boundaries, road access and existing structures.
- Label the parcel dimensions and all adjoining streets. Mark vehicle access and the shortest distance from each proposed improvement to the property lines. The county provides a separate AE flood-zone application for affected parcels.
- Choose the new construction packet for a new home. The forms directory also has separate driveway, 911 address, mobile-home and reroof applications. Check the driveway and addressing forms before finalizing the plot.
- The house packet lists sealed building plans, sealed truss drawings and energy calculations. Include proof of septic application for a single-family building or plumbing permit. Final approval of the septic installation comes before occupancy. Owners pulling their own permit should arrange to appear in person to sign.
Permit applications and filing portals
Filing resources reviewed .
- Submit a Lafayette County permitlafayettecountyfl.portal.iworq.net
- New construction application (PDF)lafayette-clerk.s3.amazonaws.com
- Site plan drawing instructions (PDF)lafayette-clerk.s3.amazonaws.com
- AE flood-zone application (PDF)lafayette-clerk.s3.amazonaws.com
- Project forms, 911 addressing and driveway applicationslafayettecountyfl.org
- County Planning and Zoninglafayettecountyfl.org
- Florida single-family septic filing rule (PDF)laws.flrules.org
Supporting documents for your project
- Driveway permit application (PDF)lafayette-clerk.s3.amazonaws.com
When the project needs access from a county road, apply to County Public Works before installing the driveway. The form directs state-road applicants to FDOT and ties power release to driveway approval.
Official source - In-progress roof affidavit for contractors (PDF)lafayette-clerk.s3.amazonaws.com
For the in-progress portion of a permitted reroof, licensed contractors can document the inspection of roof-deck nailing and the secondary water barrier. The form directs owner-builders to arrange an in-progress inspection.
Official source - Subcontractor verification form (PDF)lafayette-clerk.s3.amazonaws.com
List the trades and subcontractors working under the general contractor’s permit. If a subcontractor changes, submit a corrected form before that subcontractor begins work.
Official source
Building and zoning contacts
Building permits
Lafayette County Building Department
- Phone
- 386-294-3611
- Email or contact form
- [email protected]
- Office address
- 120 W. Main Street, Mayo, FL 32066
- Office hours
- Mon–Fri, 8 a.m.–5 p.m. ET
Planning and zoning
Lafayette County Planning & Zoning
- Phone
- 386-294-3611
- Email or contact form
- [email protected]
- Office address
- 120 W. Main Street, Mayo, FL 32066
- Office hours
- Mon–Fri, 8 a.m.–5 p.m. ET (Building Department)
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Plan the camper hookups together before calling for final inspection
Lafayette County publishes a dedicated Camper Service form, not just a general building application. The form expects the camper, well, septic and 60-amp electrical service to be installed and connected for the final inspection. It asks for the owner’s name as it appears on the deed and a notarized signature. Check separately whether the intended occupancy is allowed; the form addresses the hookups.
Read the official guidancePrepare the new-building site plan
The county’s published permit checklist asks for a current survey showing the new building, sealed building drawings, and sealed truss drawings. Check the applicable upload or copy requirements with the department.
Add septic paperwork and trade contacts
For a single-family home on septic, submit proof that the septic application was filed when applying for the building or plumbing permit. Obtain final approval of the installed system before occupancy. List the electrical, plumbing, HVAC and roofing trades involved.
Before you submit
- Current survey and proposed building location
- Building and truss drawings as applicable
- Proof of septic application for a single-family home, if applicable, and list of trade contractors