Lake County Permits: Zoning Clearance and Owner-Builders

For a Lake County structural permit, the first online stop may be zoning, not building. Confirm the county’s sequence before uploading a new home or another structure on a parcel.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Lake County.

Build a new house

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

After zoning clearance, file BF03 and the CL20 house checklist through the separate building portal. The checklist gives 30 days after zoning approval to submit the building application.

Zoning and site review

Begin in the zoning portal with the parcel number, alternate key and plot plan. Include the approved zoning permit and plot plan in the building submission.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

Use BF03 and describe the existing and proposed residential work. For a footprint addition, follow CL2 for signed construction plans, subcontractors and applicable energy documentation.

Zoning and site review

A residential addition needs an approved zoning permit and plot plan. For an interior-only project, describe any proposed change of use to Planning before choosing the permit category.

Forms and filing links

Official project guidance
Replace or recover an existing roof

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

Apply through the building portal with the reroof/roof-over checklist. Keep the notarized roofing affidavit, product installation information and progress photos showing fastener spacing for final inspection.

Zoning and site review

Lake’s checklist identifies online residential reroofs as auto-issue, with additional review before issuance if the property is in a flood zone. Check the parcel before scheduling work.

Forms and filing links

Official project guidance
Build a shed, garage or accessory structure

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

For a detached shed, garage or other accessory structure, use the accessory checklist with BF03. Take the approved zoning documents to the building portal for construction review.

Zoning and site review

Show the new structure on the site plan and obtain zoning approval first. Consult the property inquiry page if permitted use or setbacks for the parcel are unclear.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

File the pool building application with the county pool checklist and signed design plans. The checklist distinguishes residential pools from commercial work.

Zoning and site review

Obtain zoning clearance and an approved plot plan before building intake. Check the Health Department sign-off described in the checklist when onsite sewage is involved.

Forms and filing links

Official project guidance
Electrical, plumbing or mechanical work

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

For a stand-alone plumbing permit, use BF03 in the building portal and attach the legible, dimensioned one-line diagram on Lake’s plumbing checklist. Use the applicable trade checklist for mechanical or electrical work.

Zoning and site review

Most single-trade permits can proceed directly in the building portal. Lake identifies flood-zone properties as an exception that may require additional review.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Building permit

Give Lake County Building Services the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Lake County Office of Planning & Zoning to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

Use Lake County’s building and zoning portals for county-jurisdiction projects. Verify municipal boundaries before filing; a mailing city does not by itself establish the reviewing office.

Who handles this address?

Filing instructions

Start in the zoning portal and carry the clearance to Building

For new construction or an additional structure in unincorporated Lake County, start in the zoning permit portal. Once approved, take the zoning permit and approved plot plan into the separate building permit portal. The county’s single-family checklist gives you 30 days from zoning approval to submit the building application.

  1. Get the parcel number and alternate key, then check with Planning and Zoning about the proposed use. The building application asks for the water supplier or well and the sewer provider or septic system.
  2. For a new home, use form BF03 and the CL20 checklist. The county lists subcontractors at submission, digitally signed plans or original sealed paper plans, energy documentation including Manual J and S, and a full duct layout or Manual D.
  3. If filing as an owner-builder, arrange to have Building Division staff notarize your signature before issuance. Most single-trade permits can go directly to the building portal, but properties in a flood zone may need additional review.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Lake County Building Services

Email or contact form
[email protected]
Office address
320 W. Main Street, Tavares, FL 32778
Office hours
Mon–Fri, 8 a.m.–4 p.m. ET (lobby)
Official department website

Planning and zoning

Lake County Office of Planning & Zoning

Email or contact form
[email protected]
Office address
320 W. Main Street, Tavares, FL 32778
Office hours
Mon–Fri, 8 a.m.–4 p.m. ET
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Single-trade permit? Check the flood flag before expecting automatic issuance

Lake County says most single-trade permits can issue automatically through the Building Permit Portal, except where the project is in a flood zone. If you’re booking a contractor for work that needs just one trade, check whether the site falls into that exception before promising a start date. Don’t use the single-trade path for structural work just because only one contractor is involved.

Read the official guidance

Get zoning clearance first for covered projects

Lake County directs applicants for new construction or an additional structure to the Zoning Portal first. Bring the approved zoning documents into the Building Portal application.

Plan for in-person owner-builder notarization

The county’s online instructions say owner-builders must appear in person for staff notarization before the building permit is issued.

Before you submit

  • Parcel ID and proposed structure location
  • Approved zoning paperwork before building upload
  • Owner-builder identification and notarization step, if applicable

Additional official references