Lee County Permits: eConnect and Flood-Area Remodels

In Lee County, the location and type of work decide which permit path to start with. For a remodel or storm repair, check the parcel’s flood status early rather than waiting until the plans are complete.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Lee County.

Build a new house

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

For unincorporated Lee, including Pineland and Bokeelia on Pine Island, select the new residential building record. Contractors file in eConnect. An owner-builder filing in person brings the application, disclosure and four collated plan sets.

Zoning and site review

Confirm jurisdiction on the Permit Center map and show setbacks to all four lot lines. For a house in a Special Flood Hazard Area, arrange the required Elevation Certificates. A new house in a Coastal A or V zone also needs the engineer’s or architect’s coastal design certificate.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

Select an alteration for work within the existing footprint. Select an addition when the footprint or height increases. Describe the existing and proposed work in the residential record.

Zoning and site review

If the project changes the building envelope, show the revised setbacks. For renovations in a Special Flood Hazard Area, check the county’s 50% review and valuation options before finalizing the scope.

Forms and filing links

Official project guidance
Replace or repair a roof

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

Use the roof guide for a reroof and list the complete Florida approval number for each product, including digits after the decimal. Show the location and quantity of any proposed skylights or solar tubes on a roof plan.

Zoning and site review

Verify which building department serves the parcel. For a county reroof, match the assembly to the wind exposure, wind speed and building height. If the existing covering will stay in place, use Lee’s separate roof-over guide.

Forms and filing links

Official project guidance
Build a residential shed or deck

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

For a residential shed or deck in unincorporated Lee, open the shed and deck guide before starting the record. A separate guide covers residential building work such as detached accessory buildings.

Zoning and site review

Plot the proposed structure beside the house, other buildings and lot lines. Check the parcel’s zoning district and any flood constraints before choosing the location.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

Select the pool or spa type in eConnect, including above ground, below ground, pool with spa, or renovation. Identify the safety feature, deck, retaining wall and the house permit number if the home is under construction.

Zoning and site review

Draw the pool and setbacks on the site plan. The guide flags an additional floodway analysis for qualifying land disturbance and separate permitting for a proposed barrier fence or enclosure.

Forms and filing links

Official project guidance
Repair a damaged home in a mapped flood hazard area

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

If the damaged building is in a Special Flood Hazard Area, use Lee’s 50% review instructions. For an itemized valuation, prepare the detailed cost packet and the applicable owner-builder or contractor supporting records. For damage-related trade repairs, include the owner’s acknowledgment when requested.

Zoning and site review

Locate the building on the flood map and establish its pre-damage value. Ask whether rebuilding triggers a surveyed Elevation Certificate. The separate Coastal A/V design certificate applies to qualifying construction in those coastal hazard zones.

Forms and filing links

Official project guidance
Build or repair a driveway, dock or seawall

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

For a residential driveway connecting to a county-maintained road, start with the county driveway permit. For a dock, lift, seawall, riprap or dredging, use the separate Dock and Shoreline permit.

Zoning and site review

Check who maintains the road before applying for driveway work. For shoreline projects, check side setbacks, any state or Army Corps approvals, and whether a canal end, corner or pie-shaped lot requires a riparian survey.

Forms and filing links

Official project guidance
Commercial construction or a change of use

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

Use the commercial building guide for the project scope and prepare the plans and supporting documents for eConnect. Identify any approved development order covering the site.

Zoning and site review

A proposed new commercial, industrial or multifamily building needs a development order or a limited development order. The county accepts concurrent building review but requires approval of the development order before building permit issuance.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Building permit

Give Lee County Building & Permitting Services the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Lee County Zoning Intake / Information Counter to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

Lee County eConnect is for county-jurisdiction projects. Confirm whether the site instead falls under Cape Coral, Fort Myers, Fort Myers Beach, Sanibel, Bonita Springs or Estero before choosing an intake portal.

Who handles this address?

Filing instructions

Does this parcel file with Lee County or a city?

Bokeelia and Pineland on Pine Island are in unincorporated Lee County. For a property near a city line, check the Permit Center’s incorporated-cities map. Inside Bonita Springs, Cape Coral, Estero, Fort Myers, Fort Myers Beach or Sanibel, confirm the filing route with that municipality before applying in county eConnect.

  1. Select the residential record by scope. Lee distinguishes an alteration within the existing footprint, an addition that increases area or height, and a detached accessory structure. Docks and shoreline work have their own guide.
  2. Contractors must apply through eConnect. An owner-builder filing on paper takes the residential application, owner-builder disclosure, supporting documents and four collated plan sets to the county’s building counter.
  3. Before pricing work on a flood-prone existing building, check Lee’s substantial-improvement guidance. For a noncompliant building in a Special Flood Hazard Area, the county publishes its valuation method and a form to itemize costs.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Lee County Building & Permitting Services

Email or contact form
[email protected]
Office address
1500 Monroe Street, Fort Myers, FL 33901
Office hours
Mon–Fri, 9 a.m.–4 p.m. ET (counter)
Official department website

Planning and zoning

Lee County Zoning Intake / Information Counter

Email or contact form
[email protected]
Office address
1500 Monroe Street, Fort Myers, FL 33901
Office hours
Mon–Fri, 9 a.m.–4 p.m. ET (counter)
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Get a written zoning answer before signing a lease for a different use

When the deal depends on using a site for a particular business, use Lee County’s Request for Zoning Verification. Enter the STRAP parcel number and address, then name the proposed use rather than asking only for the zoning district. The county can also identify applicable zoning resolutions or what zoning action may be needed. The letter addresses zoning and can be superseded by later regulations.

Read the official guidance

Use the matching eConnect record type

The county’s Application & Information Center provides guides and record types for building, trade and development work. Match the record to the scope before uploading plans.

Screen flood-prone remodels before pricing

For a building that is not flood-compliant in a Special Flood Hazard Area, the county directs owners to its substantial-improvement and substantial-damage guidance. Ask what valuation or elevation documentation is needed for the actual scope.

Before you submit

  • Parcel ID and city-limit check
  • Building or trade scope and matching eConnect record type
  • Flood map, elevation certificate and any damage notice

Additional official references