City and county jurisdiction
Use Madison County’s Building Department and Planning & Zoning for county review. For a property within the City of Madison, verify the municipal permitting path before filing.
Who handles this address?
Filing instructions
Which Madison office handles the property?
Madison has separate city and county permitting offices, both of which direct applicants to Cloudpermit. Choose the jurisdiction for the actual property. The City of Madison initiates development review at City Hall and handles its own building permits.
- For a county home project, select the planning application that matches it. The county lists separate development forms for a site-built home, an addition, a modular home and a mobile/manufactured home.
- Use the county’s building form to assemble the companion documents. It lists zoning compliance, driveway, deed, site plan, energy, wind and truss documents. For a single-family home on septic, submit proof that you applied for the septic permit; for a sewered property, document the sewer service. Match the requested items to your scope.
- Submit from the county permit application page or use its printable application. Its septic link takes applicants to the local environmental health office. City applicants can start with Madison Community Development at 850-973-5083.
Permit applications and filing portals
Filing resources reviewed .
- County online permit and septic application linksmadisoncountyfl.com
- County building application (PDF)madiscon-county-fl.s3.amazonaws.com
- Planning applications by project typemadisoncountyfl.com
- County construction forms and affidavitsmadisoncountyfl.com
- City of Madison building and developmentcityofmadisonfl.com
- Florida single-family septic application timingflsenate.gov
Supporting documents for your project
- Agreement to submit an NFIP Elevation Certificate (PDF)madiscon-county-fl.s3.amazonaws.com
For construction covered by the county’s floodplain elevation requirements, use this agreement to acknowledge the survey and inspection submittals before the work advances.
Official source - Floodplain nonconversion agreement (PDF)madiscon-county-fl.s3.amazonaws.com
For a floodplain structure or enclosure covered by the declaration, the owner identifies the parcel and acknowledges limits on future changes to the permitted space.
Official source - Driveway permit application (PDF)madiscon-county-fl.s3.amazonaws.com
Use for a proposed driveway connection under county review. Identify the property and access location for staff to review separately from the building plans.
Official source
Building and zoning contacts
Building permits
Madison County Building Department
- Phone
- 850-973-6785
- Email or contact form
- Check the official site
- Office address
- 229 SW Pinckney Street, Suite 219, Madison, FL 32340
- Office hours
- Mon–Fri, 8 a.m.–5 p.m. ET; permitting 8 a.m.–4 p.m.
Planning and zoning
Madison County Planning & Zoning
- Phone
- 850-973-6785
- Email or contact form
- Check the official site
- Office address
- 229 SW Pinckney Street, Room 219, Madison, FL 32340
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
A used manufactured home needs review before it moves
The county’s Mobile / Manufactured Home Development Permit packet calls for an inspection of a used unit before it is moved within or into the county. Arrange for an accepted professional to complete the county’s pre-inspection report, and submit the corresponding standards affidavit. The packet says move-on permits are held until the required inspections and written certification are complete, so coordinate before booking transport.
Read the official guidanceCheck the driveway application separately
The county lists separate building and driveway applications. Identify the road owner and proposed entrance location so you can confirm whether that review applies.
Request a site-specific flood determination
Madison County directs owners to its Building and Zoning Department or regional flood report for a flood-zone determination. The county says development in the floodplain requires a permit.
Before you submit
- Parcel number and street or new driveway information
- Building and driveway applications, if applicable
- Current flood determination and available elevation records