City and county jurisdiction
Use Martin County's Building Department for a county-served parcel. If the property is inside a municipality, confirm jurisdiction with that municipality before filing.
Who handles this address?
Filing instructions
Plan for clearing, native trees and infill drainage
A Martin County house submittal includes decisions about land clearing and drainage before the foundation goes in. For a project inside the City of Stuart, use the city’s permit service. The county building counter also has a Stuart address.
- For a county single-family home, the checklist calls for a land clearing plan and generally an environmental professional’s assessment. Where work affects listed species, upload the applicable state permit before clearing-plan approval.
- Give your surveyor the single-family and infill checklists. The site plan calls for NAVD elevations at property corners, lot-line midpoints and the road crown, along with proposed drainage, setbacks and lot coverage. For a single-family home using septic, give Building proof that you filed the septic application. Florida law allows building permit issuance before the septic construction permit is issued.
- Contractors can file through Accela and its Digital Plan Room. A qualifying owner-builder signs the application and disclosure in person at 900 SE Ruhnke Street, Stuart, then can complete remaining transactions electronically.
Permit applications and filing portals
Filing resources reviewed .
- Apply in the county’s Accela portalmartin.fl.us
- County building application (PDF)martin.fl.us
- Single-family home requirements (PDF)martin.fl.us
- Infill lot grading checklist (PDF)martin.fl.us
- County owner-builder instructionsmartin.fl.us
- City of Stuart permit applicationsstuartfl.gov
- Florida single-family septic application timingflsenate.gov
Supporting documents for your project
- V-zone design certificate (PDF)martin.fl.us
For a county project in a V zone, submit the engineer- or architect-sealed certificate before permit issuance. It records the design elevations and applicable breakaway-wall design.
Official source - FEMA Elevation Certificate for finished constructionmartin.fl.us
For new or substantially improved structures in a Special Flood Hazard Area, provide the finished-construction survey certificate before the certificate of occupancy or completion.
Official source - Product approval list (PDF)martin.fl.us
Use for permit plans that call for Florida product approvals. List the selected assemblies and approval numbers so reviewers can cross-check the specified products.
Official source
Building and zoning contacts
Building permits
Martin County Building Department
- Phone
- 772-288-5916
- Email or contact form
- Check the official site
- Office address
- 900 SE Ruhnke Street, Stuart, FL 34994
- Office hours
- Mon–Fri, 7:30 a.m.–4 p.m.
Planning and zoning
Martin County Growth Management – Zoning Desk
- Phone
- 772-288-5495
- Email or contact form
- Check the official site
- Office address
- 2401 SE Monterey Road, Stuart, FL 34996
- Office hours
- Mon–Wed and Fri, 9 a.m.–4 p.m.; Thu is limited to specified zoning compliance requests; see office page.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Is the lot an infill lot?
For a new single-family home, check Martin County’s infill criteria before ordering the survey or finalizing slab and grading elevations. The county’s single-family checklist directs infill applicants to a separate Infill Lot Permit Application Checklist and grading-plan sample. Give those instructions to the surveyor and site designer at the outset so they know which lot and roadway elevations the county expects to see.
Read the official guidanceChoose the checklist that matches the work
Martin County publishes separate lists for remodels, additions and new commercial construction. For waterfront work, the dock, boatlift, pilings and seawall lists are better starting points than a general remodel checklist.
Pull the supporting county forms
The county's forms page includes a product approval list and an owner-builder disclosure. Use the versions linked by the county if those items apply to the permit.
Before you submit
- Match your parcel to the building authority.
- Identify each project component before selecting a checklist.
- Gather the applicable county forms before uploading drawings.