City and county jurisdiction
County guidance applies to county-served parcels. If the site is inside a Keys municipality such as Key West or Marathon, start with that city's process instead of assuming county rules or portals apply.
Who handles this address?
Filing instructions
Check allocation availability before planning a new dwelling
For a new market-rate dwelling in the unincorporated Keys, check the residential growth allocation (ROGO) before committing to a construction start. An approved building application and an allocation are separate steps. The county says staff can continue reviewing plans after the July 2026 allocation period closed and while the next period is pending.
- Use the county’s ROGO status page to check whether the current allocation period is open and what forms apply. Staff states the ROGO application requires an approved building permit. Ask Planning how this applies to your parcel and any existing dwelling rights.
- Register each person who will submit through Oracle Permitting and Licensing (OPAL). Complete the permit application in the portal. The county specifically instructs applicants to leave the paper application out of the upload.
- A contractor using an agent must send the county’s authorization to [email protected], even if a form was provided previously. An agent also needs an individual OPAL account. Design professionals submit digitally signed plans.
Permit applications and filing portals
Filing resources reviewed .
- Check the county’s current ROGO allocation statusmonroecounty-fl.gov
- Open OPAL to submit a permitfa-ettl-saasfaprod1.fa.ocs.oraclecloud.com
- OPAL registration and upload instructionsmonroecounty-fl.gov
- Contractor’s agent authorization (PDF)monroecounty-fl.gov
- County permit forms and supporting documentsmonroecounty-fl.gov
Supporting documents for your project
- Monroe County V-zone construction certification (PDF)monroecounty-fl.gov
For a county-reviewed V-zone project, the Florida engineer or architect certifies the foundation and applicable breakaway walls or obstructions. Arrange the project’s surveyed Elevation Certificate separately.
- Nonconversion agreement for downstairs enclosures (PDF)monroecounty-fl.gov
For an enclosure subject to the county’s nonconversion condition, record the signed agreement and specified drawings before issuance of the certificate of occupancy or compliance.
Official source - Substantial improvement or damage affidavit and worksheet (PDF)monroecounty-fl.gov
When Floodplain Management evaluates repairs or improvements against the structure’s value, use the county’s dedicated flood-review packet for the cost information and affidavit.
Official source
Building and zoning contacts
Building permits
Monroe County Building and Permitting – Stock Island
- Phone
- 305-295-3990
- Email or contact form
- [email protected]
- Office address
- 5503 College Road, Suite 203, Key West, FL 33040
- Office hours
- Mon–Fri, 8:30 a.m.–3 p.m.
Planning and zoning
Monroe County Planning and Environmental Resources – Marathon
- Phone
- 305-289-2500
- Email or contact form
- Check the official site
- Office address
- 2798 Overseas Highway, Suite 400, Marathon, FL 33050
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Use the flood affidavit, not the standard cost sheet
If Monroe County flags a flood-zone repair or remodel for substantial improvement or damage review, start with the county’s Substantial Improvement Damage Informational Handout and Affidavit. Its forms page specifically marks the ordinary Cost Breakdown Worksheet as unsuitable for this review. Ask the floodplain reviewer what valuation and repair-cost evidence belongs with the affidavit before settling the contractor’s scope.
Read the official guidanceScreen new development for allocation
Monroe County operates separate residential ROGO and nonresidential NROGO allocation systems. Before setting a start date for a new dwelling or added nonresidential floor area, ask Planning whether the scope needs an allocation or qualifies for a different route.
Track inspections in Community Development
For permits applied for after October 1, 2022, Monroe directs registered users associated with the permit to schedule all inspections in OPAL, including flood, planning, environmental and fire. For older files, check the county’s inspection instructions for the legacy route.
Check records for work below the elevated floor
If the project affects an existing lower enclosure, pull the permit history and any floodplain records early. The county has dedicated guidance for below-base-flood enclosures and after-the-fact reviews.
Before you submit
- Confirm the permitting jurisdiction and parcel ID.
- Ask Planning whether ROGO or NROGO applies.
- Have the inspection and floodplain records available when the scope affects an enclosure.