Palm Beach County Permits: ePZB and Zoning Intake

Use the parcel to determine whether your application belongs with Palm Beach County or with a city. For a county job, start with the scope-specific submittal checklist rather than a generic packet.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Palm Beach County.

Build a new house

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

For a designed one- or two-unit dwelling in the county’s jurisdiction, use the Type 5 checklist and universal application. Include the construction survey or boundary survey and sealed site plan as specified.

Zoning and site review

A property control number starting with 00 identifies an unincorporated parcel. Locate easements, setbacks and the proposed finished floor on the survey, and include the required flood legend for new construction.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

For alterations to a one- or two-unit home, use the Type 3A checklist. Show existing and proposed room uses, dimensions, exits and openings, and identify any changed structural, electrical or plumbing work.

Zoning and site review

If an addition or enclosure is proposed, show the improvements, easements, property-line distances and proposed habitable floor elevation on the survey or site plan.

Forms and filing links

Official project guidance
Replace a residential roof

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

Use ePZB permit type 4081 for a re-roof on a single-family, duplex or attached residence. Mark up the product approvals. A B number identifies an issued permit. A PR number means the application is in review. Pay before starting.

Zoning and site review

Check that the property is in the county’s building jurisdiction. The county form asks project-specific questions to determine eligibility for self-issuance.

Forms and filing links

Official project guidance
Repair flood or storm damage

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

For repairs to an existing building, ask the Floodplain staff whether the work is a substantial improvement. Include the flood legend with an application the county classifies as a substantial improvement.

Zoning and site review

Locate elevations on the survey or identified plan sheet. In Zone V, ask the design professional to complete the Zone V certificate when the project requires coastal design certification.

Forms and filing links

Official project guidance
Install mechanical, electrical or plumbing equipment

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

For a standalone mechanical, electrical or plumbing equipment installation, match the work to the county permit type. Use the equipment elevation certificate when Floodplain staff require it.

Zoning and site review

Identify the equipment location and proposed elevation in the flood legend. The county’s standalone equipment requirement took effect October 1, 2026.

Forms and filing links

Official project guidance
Renovate a commercial tenant space

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

For a commercial tenant improvement, use Type 4C, the universal application and the plans applicable to the tenant’s work. Other commercial projects have different checklist numbers.

Zoning and site review

Prepare a location plan identifying the affected space within the existing building and identify its proposed use for review.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Building permit

Give Palm Beach County Building Division – Main Office the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Palm Beach County Zoning Division – On-Call to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

The county Permit Center processes building applications for unincorporated Palm Beach County. Incorporated properties use their municipal building authority unless jurisdiction-specific guidance says otherwise.

Who handles this address?

Filing instructions

Start with the property control number

The first two digits of the 17-digit property control number identify the filing jurisdiction. A number beginning with 00 indicates unincorporated Palm Beach County. A different prefix directs you to a municipality. The universal application can look identical even though the receiving office differs.

  1. Look up the unincorporated parcel in the county’s myGeoNav mapping tool before laying out improvements. Check both future land use and zoning district. Setbacks, landscaping and parking depend on the zoning regulations.
  2. Match the project to the county’s permit-type list, then open the corresponding sufficiency checklist in the forms directory. For example, a pool barrier fence and a general residential fence appear under different entries.
  3. Use ePZB for an unincorporated parcel. If proposing a driveway or fence in an easement, locate the easement on the survey and check the release and removal-agreement instructions before filing.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Palm Beach County Building Division – Main Office

Email or contact form
[email protected]
Office address
2300 N. Jog Road, West Palm Beach, FL 33411
Office hours
Mon–Fri, 8 a.m.–5 p.m.
Official department website

Planning and zoning

Palm Beach County Zoning Division – On-Call

Email or contact form
[email protected]
Office address
2300 N. Jog Road, West Palm Beach, FL 33411
Office hours
On-call service: 8:30 a.m.–4:30 p.m.
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Replacing the contractor on an existing permit?

Palm Beach County has a Change or Add Contractor/Qualifier form tied to the existing permit. Before the replacement takes over, gather the permit number, the new qualifier’s details and which subcontractors will remain. The form has separate notary sections for the incoming contractor or qualifier and for the owner, tenant, lessee or agent. Check the permit’s status in ePZB before arranging signatures.

Read the official guidance

Use ePZB for county applications

The county directs building applicants to its ePZB portal. Check notices as the file moves through intake, and use the permit type's application checklist before uploading.

Separate zoning questions from building intake

For county parcels, the Zoning On-Call service handles zoning questions and points applicants to the team that addresses the zoning portion of a building permit. Use it to verify a use or site constraint that could affect your layout.

Before you submit

  • Confirm whether the parcel is unincorporated.
  • Pull the checklist and get the plans ready for ePZB.
  • Verify proposed use or site constraints before fixing the design.

Additional official references