City and county jurisdiction
If the parcel is in unincorporated Polk, start with Polk County's building portal. For a parcel within Lakeland, Winter Haven or another municipality, confirm the building authority before opening a county file.
Who handles this address?
Filing instructions
A house permit and a Level 2 development review
A new house on a single lot and a project routed for Level 2 development review have different packets in Polk. If staff assign Level 2 review and the site lies in the Green Swamp, the county’s checklist calls for a Green Swamp Impact Assessment Statement and any related Level 3 or 4 project number.
- Gather the parcel number, residential construction plans and utility records. A single-family project on septic can file with proof of its septic application. For a duplex on septic, the system construction permit must be issued before the building or plumbing permit. Owner-builders should have their deed and disclosure ready.
- Fill the county product approval schedule with the manufacturer, product description and specific approval number for the components used. Use the relevant rows for each opening or other building component.
- For a Level 2 filing, select that application in Accela, provide the deed and, when someone else applies for the owner, a signed and notarized authorization. The development checklist identifies separate drainage, fire-flow and traffic documents depending on the proposal.
Permit applications and filing portals
Filing resources reviewed .
- Apply through Polk County Citizen Accessaca-prod.accela.com
- County building permit and plan guides by project (PDF)polkfl.gov
- Building component product approval form (PDF)polkfl.gov
- Level 2 development review documents (PDF)polkfl.gov
- City of Lake Wales new-home intake checklist (PDF)lakewalesfl.gov
- Florida single-family septic filing ruleflsenate.gov
Supporting documents for your project
- Owner-builder flood hazard notice (PDF)polkfl.gov
For a permitted building in a flood hazard zone, plan when to obtain the FEMA elevation documentation. Polk ties it to lintel inspection for concrete block construction or rough framing inspection for a wood frame.
Official source - Floodplain nonconversion agreement (PDF)polkfl.gov
For enclosures below elevated buildings or qualifying underfloor spaces in Zones A, AE or AH, review the use restrictions with the owner and complete the applicable declaration.
Official source - Roof inspection affidavit (PDF)polkfl.gov
For roofing work covered by this affidavit, record the sheathing and underlayment details and follow the county’s in-progress and final inspection instructions.
Official source
Building and zoning contacts
Building permits
Polk County Building Division
- Phone
- 863-534-6080
- Email or contact form
- Check the official site
- Office address
- 330 W. Church Street, Bartow, FL 33830
- Office hours
- Check the official site
Planning and zoning
Polk County Land Development Division
- Phone
- 863-534-6449
- Email or contact form
- Check the official site
- Office address
- 330 W. Church Street, Bartow, FL 33830
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Did plan review finish before the change arose?
Polk County’s Revision to Construction Plans and Documents form distinguishes changes while drawings are still under review from revisions after the permit is paid and the permit card is issued. Identify which stage your file is in and list the affected sheet numbers and changes on the form. Keep the original approved set handy so the field team can distinguish the proposed change from what has already been approved.
Read the official guidanceUse County Citizen Access for a county building record
Polk County's Accela site has a Building area and links to the Residential Portal. Search existing records before opening a new application if the scope revises prior work.
Look beyond the current permit search for older work
Polk County also provides a separate historical lookup and directs users to its records office for historical documents. An empty result in the current portal alone should not be taken as proof there was never a permit.
Check whether the parcel is in the Green Swamp
Polk County publishes a separate impact-assessment checklist for development in the Green Swamp Area of Critical State Concern. If the site is near that area, confirm the parcel boundary and ask Land Development whether the checklist applies.
Before you submit
- Confirm the parcel's jurisdiction.
- Search the county's current permit records and historical lookup if needed.
- Keep the old permit number or approved plans with the new project record.