City and county jurisdiction
Putnam County lists Crescent City, Palatka, Interlachen, Pomona Park and Welaka as municipalities without county interlocal service agreements. For those city limits, contact the city office rather than assuming the county processes the permit.
Who handles this address?
Filing instructions
Check the driveway connection before filing
A property in Crescent City, Palatka, Interlachen, Pomona Park or Welaka needs a jurisdiction check with the city or town. Putnam’s Building Department lists separate municipal contacts. For county-road access, even a driveway that is already in place must be evaluated against current county standards.
- Collect ownership documentation, site drawings, residential building plans, HVAC sizing and duct information, and the product approval sheet. The county residential checklist distinguishes driveway approval from a Public Works site-work permit.
- If your access meets a county road, check with Public Works about the driveway permit and whether upgrades to an existing connection are needed. The site-work drawing should show where the street and driveway meet.
- For construction in Zone A or AE, ask Building for the floodplain development permit before the building permit is issued. Coordinate the surveyor’s under-construction and final elevation certificates with the inspection sequence.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Floodplain development permit application (PDF)putnam-fl.gov
For proposed development in a regulated floodplain, identify the parcel, work and flood hazard information for zoning and floodplain review. Separate building authorization is needed to start construction.
Official source - Residential product approval specification sheet (PDF)putnam-fl.gov
When the residential packet calls for product data, enter the manufacturer, product description, use limitations and approval number for the applicable doors, windows, roofing or other components.
Official source - County site-plan example (PDF)putnam-fl.gov
Use the three-page example when preparing the parcel drawing to accompany a residential application. Draw the actual property and proposed work for your submission.
Official source
Building and zoning contacts
Building permits
Putnam County Building Department
- Phone
- 386-329-0307
- Email or contact form
- [email protected]
- Office address
- 2509 Crill Avenue, Suite 300, Palatka, FL 32177
- Office hours
- Mon–Fri, 8:30 a.m.–5 p.m.
Planning and zoning
Putnam County Planning & Zoning Division
- Phone
- 386-329-0491
- Email or contact form
- [email protected]
- Office address
- 2509 Crill Avenue, Suite 300, Palatka, FL 32177
- Office hours
- Mon–Fri, 8:30 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Get the Lot Inquiry Letter before applying for a split
If a plan depends on creating a second parcel, do not start with the building permit. Putnam County’s Lot Split Application requires a staff-signed Lot Inquiry Letter with the submittal. Start with Planning and Zoning’s Lot Inquiry Request and the parcel ID, then use the county’s lot split checklist for the proposed boundary and supporting materials before commissioning a building layout that assumes two lots.
Read the official guidanceUse Citizenserve for a county permit
Putnam links to Citizenserve for online permitting. For inspections, request through the portal when possible; the county also gives email instructions if you cannot, including the permit number, property address, inspection type and requested date.
Use the residential checklist to assemble the plan packet
Putnam's published checklist identifies the building application, ownership documentation and Florida product approval specification sheet. Select the items relevant to the scope and use Planning and Zoning to clarify parcel questions.
Before you submit
- Confirm city limits and the filing authority.
- Gather ownership and project materials required by the county checklist.
- Keep the permit number and site address ready for inspection requests.