Santa Rosa County Building, Driveway and Septic Permits

Planning a new home, a major remodel or an accessory building in Santa Rosa County? Start with the parcel, the driveway location and how the property will be served by water and sewer. Those decisions can affect how much room is left for the building.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Santa Rosa County.

Build a new house

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

File the residential building packet in MyGovernmentOnline. Add the parcel number, construction documents and a dimensioned plot plan.

Zoning and site review

Milton, Gulf Breeze and Jay approval precedes county submission for addresses inside those cities. For a mapped flood hazard, check Floodplain Management’s elevation documentation before design.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Describe the alteration in the residential application. For window, door or shutter replacements, include the model and complete product approval number.

Zoning and site review

For an addition, dimension the proposed footprint against the property lines. Check the parcel’s municipality for its approval stamp before uploading the packet.

Forms and filing links

Official project guidance
Replace or repair a roof

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Use the residential roofing packet. For a tear-off and replacement, complete the water-barrier documentation and arrange delivery of the notarized roofing affidavit before final inspection.

Zoning and site review

Identify the structure being reroofed. If the job also adds a porch or extends the roof footprint, show that change to Development Services as an alteration.

Forms and filing links

Official project guidance
Build a shed, garage or accessory structure

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Start with the storage-building exemption form for a qualifying shed. Use the residential building application for a permitted accessory structure.

Zoning and site review

Supply a site sketch with distances to property lines and other buildings. Ask about flood-zone eligibility and the shed’s intended use before claiming the exemption.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Use the pool/spa application and upload the plans in MyGovernmentOnline. Check the Navarre Beach and V-zone plan requirements for a coastal installation.

Zoning and site review

Upload city approval for a city parcel or the county site plan for an unincorporated site. Measure setbacks from the water’s edge.

Forms and filing links

Official project guidance
Build a commercial or multifamily project

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Use the commercial and multifamily application. Its Navarre Beach and V-zone checklist identifies engineering documentation and elevation certificates at framing and final stages where applicable.

Zoning and site review

Confirm that the proposed use and site layout are approved. Identify any city approval or site-plan review before submitting the construction set.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Building permit

Give Permitting and Building Compliance the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Planning and Zoning to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

Use County Development Services for unincorporated land. For a residential application in Milton, Gulf Breeze or Jay, the county asks you to obtain the city’s prior approval and include its documents or approval stamp in the building packet.

Who handles this address?

Filing instructions

Get the city approval before filing in Milton, Gulf Breeze or Jay

Check the city limits before uploading a house permit. The county’s residential packet asks applicants in Milton, Gulf Breeze and Jay to supply prior city approval, including the city’s documents or approval stamp.

  1. Collect the parcel number and street address. On the plot plan, dimension the lot, existing and proposed structures, and the distances from new work to each affected property line.
  2. For window, door or shutter work, identify the manufacturer, model and complete product approval number, including the digits after the decimal. The residential application covers these replacements as well as new construction.
  3. Start the application in MyGovernmentOnline. Contractors register their company in the portal. Upload revisions to the same project. If you are installing a residential storage shed outside a flood zone, ask about the accessory exemption and supply a site plan for setback review.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Permitting and Building Compliance

Email or contact form
[email protected]
Office address
6051 Old Bagdad Highway, Suite 202, Milton, FL 32583
Office hours
Mon–Fri 8 a.m.–4 p.m.
Official department website

Planning and zoning

Planning and Zoning

Email or contact form
[email protected]
Office address
6051 Old Bagdad Highway, Suite 202, Milton, FL 32583
Office hours
Mon–Fri 8 a.m.–4 p.m.
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Budget for fire-district clearance before permit issuance

If you are planning work in Navarre, Pace, Milton or another area with a separate fire district, identify the district from the project address before you budget or schedule. The county distinguishes outside fire department review from fire-district impact fees. Its checklist names Navarre Beach among the districts for which an applicable fee receipt must reach the county before issuance, even though Navarre Beach is not in the same list of outside review districts.

Read the official guidance

Use the county’s online intake

County permitting and planning applications go through My Government Online. Check which approvals apply to your address before creating an application.

Show how the lot connects to the road

Santa Rosa County says it automatically generates a driveway permit alongside certain county building permits, including a new detached single-family home. Show the driveway on your site plan and confirm who owns the road, especially if you are changing an existing connection.

Leave room for septic if needed

If there is no sewer connection, check the Florida Department of Environmental Protection’s onsite-sewage permitting process before fixing the footprint or driveway location.

Before you submit

  • Parcel number and municipality or unincorporated status
  • Survey showing driveway and proposed construction
  • Water and sewer availability or existing septic records

Additional official references