City and county jurisdiction
Seminole County Building Permitting serves unincorporated Seminole County. For a Sanford, Oviedo or other municipal address, verify whether the property is actually inside the city boundary before using the county portal.
Who handles this address?
Filing instructions
Prepare individual sheets before digital signing
On unincorporated Seminole County projects, prepare the plan files before a designer signs them. The residential instructions call for individual digitally signed sheets. Splitting a signed multi-sheet PDF afterward breaks the signature.
- Start with Seminole County OneStop. Gather the Property Appraiser’s legal-description printout and the contractor authorization or owner-builder statement. For ground disturbance, include the historical/archaeological form. New construction served by another utility needs the utility letter.
- Use the residential guide to sort the application forms, supporting documents and construction drawings into their designated ePlan folders. The site plan should identify lot drainage, finished-floor elevation, driveway access, easements and setbacks.
- Name each drawing with a three-digit sequence, sheet number and short description. Keep the original filename when uploading a revised sheet. The general permit application covers work other than signs.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Product approval specification form (PDF)seminolecountyfl.gov
Use this sheet to identify the selected regulated products and their approval numbers with the building application.
Official source - Formboard survey inspection notice (PDF)seminolecountyfl.gov
For new structures on a permanent slab or foundation, have the survey onsite by the slab or first-floor framing inspection. The inspector checks the installed elevation against the approved finished floor.
- Residential lot grading and drainage guidelines (PDF)seminolecountyfl.gov
When an infill home or a change to the proposed finished floor affects site drainage, check which grading drawings or engineering review the lot needs before submitting.
Building and zoning contacts
Building permits
Building Permitting
- Phone
- 407-665-7050
- Email or contact form
- [email protected]
- Office address
- 1101 E. First St., Sanford, FL 32771
- Office hours
- Mon–Fri 8 a.m.–5 p.m.; last customer sign-in 4:30 p.m.
Planning and zoning
Planning and Zoning
- Phone
- 407-665-7371
- Email or contact form
- [email protected]
- Office address
- 1101 E. First St., Sanford, FL 32771
- Office hours
- Mon–Fri 8 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Before signing a lease, check how the county treats the new use
A tenant changing a commercial use in unincorporated Seminole County should check the county’s Change of Use Guidelines even if the floor plan appears unchanged. Pull the old approved layout and describe the intended operation. The county’s guidance asks for existing and proposed plans and occupancy classifications, along with adjacent uses, sprinkler status and any fire-rated separations. The previous tenant’s approval is not a substitute for that review.
Read the official guidanceKeep revisions with the original record
The county directs applicants to its OneStop system for permit submissions and related activity. For a revision, have the original permit number and identify the sheets changed before uploading.
Ask about floodplain review early
Seminole County says development in its regulated floodplain requires a permit and offers flood-zone determinations. If work affects an existing building, bring the scope and estimates so staff can tell you whether substantial-improvement review is needed.
Before you submit
- Verify city limits, not just the mailing city
- Find the current permit number and approved sheets if revising existing work
- Keep the survey and a flood-zone determination with the project records