City and county jurisdiction
County permitting serves unincorporated St. Lucie County. For locations inside Fort Pierce or Port St. Lucie, start with the city; for uncertain boundaries, have the county planning desk check the parcel.
Who handles this address?
Filing instructions
Separate the plan set by trade
For a county home project connecting to public utilities, get utility approval before submitting the building plans. St. Lucie’s home and addition checklist specifies how to package drawings for EnerGov. For property inside Port St. Lucie, use the city’s separate intake checklist.
- Give the parcel ID and legal description, separate living and non-living floor area and name the utility provider. For a single-family home on a new septic system, include proof that the septic application was filed. Obtain final approval of the system before occupancy.
- Upload digitally signed and sealed drawing sets as separate PDFs by trade. The county also calls for a survey and site plan showing setbacks and finished floor elevation, a filled-lands affidavit, equipment sizing and marked product approvals.
- For a house in a Special Flood Hazard Area, arrange elevation certificates for three milestones: construction documents, construction underway and before final inspection. For marine work, select the county’s marine construction checklist instead of the house packet.
Permit applications and filing portals
Filing resources reviewed .
- County building permit application (PDF)stlucieco.gov
- County home and addition checklist (PDF)stlucieco.gov
- Open county EnerGov Citizen Self Servicestluciecountyfl-energovpub.tylerhost.net
- County fence, marine and mobile-home checklistsstlucieco.gov
- County planning and zoningstlucieco.gov
- City of Port St. Lucie home checklist (PDF)cityofpsl.com
- Florida single-family septic filing ruleflsenate.gov
Supporting documents for your project
- Commercial flood-zone submittal and inspection checklist (PDF)stlucieco.gov
For a county commercial project in Zone V or seaward of the Coastal Construction Control Line, submit the designer of record’s digitally signed and sealed V-zone certificate with the plans. The checklist also sets out formboard, construction and final survey stages.
Official source - Utility documentation and final flood elevation notice (PDF)stlucieco.gov
Use the notice to check utility documentation at intake. For a finished-construction Elevation Certificate, check all required sections and attach the building photographs before requesting occupancy.
Official source
Building and zoning contacts
Building permits
Permitting and Zoning
- Phone
- 772-462-1553
- Email or contact form
- Check the official site
- Office address
- 2300 Virginia Avenue, Fort Pierce, FL 34982
- Office hours
- Mon–Fri 8 a.m.–4:30 p.m.
Planning and zoning
Planning Division, Planner of the Day
- Phone
- 772-462-2822, option 0
- Email or contact form
- [email protected]
- Office address
- 2300 Virginia Avenue, Fort Pierce, FL 34982
- Office hours
- Mon–Fri 8 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Inside Port St. Lucie, use the city’s garage conversion packet
If your parcel is inside the City of Port St. Lucie and you want to turn an existing garage into living space, start with the city’s dedicated garage conversion application rather than the county’s after-the-fact route. The city asks how much of the garage will be converted, whether the overhead door stays and how the new room will be used. Its checklist also flags health approval for a bedroom conversion on well and septic.
Read the official guidanceCheck the record in EnerGov
Use the county’s EnerGov platform for available permitting records and application activity. For existing alterations, record the permit number, what it covered and whether you can confirm the final inspection.
Use the after-the-fact checklist only when applicable
St. Lucie County publishes a separate after-the-fact permit path. If work is already in place, gather any violation notice, available approved drawings and photos, then confirm with the reviewing office what it will need to evaluate the work.
Check mapped flood constraints on existing work
The county publishes flood protection and floodplain permitting information. If the building is in a mapped area, identify affected rooms and equipment and bring available elevation records before assuming you can retain or expand the existing footprint.
Before you submit
- Property and permit or enforcement case numbers
- Existing plan sheets, photos and changes made by prior owners
- County flood map and any elevation certificate