Taylor County Site Approvals: Land Use, Wastewater and Access

From inland lots near Perry to sites around Steinhatchee and the Taylor County beaches, a new building can hinge on the parcel’s flood information and utility provider. Check the county’s planning and permit sequence before setting the building location.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Taylor County.

Build a new house

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Use the residential packet with scaled site and structural plans, energy documents, driveway and water-source statements. Open iWorQ from the Building & Planning page.

Zoning and site review

Obtain the compliance statement and aerial map first. Identify the utility serving the lot and whether AE or VE elevation records apply.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Describe the rooms, structural work and any new floor area to Building & Planning through its permit intake. For an addition to a flood-zone home, the residential packet directs applicants to meet with staff.

Zoning and site review

Identify the flood zone and show the addition against the property lines. Ask which existing-building and elevation documents are needed before commissioning drawings.

Forms and filing links

Official project guidance
Replace an existing roof covering

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Select the county roof permit application for replacement roofing. Use the Building & Planning permit link for electronic intake.

Zoning and site review

Identify the parcel and distinguish replacement on the existing roof from an extension over new floor or porch area. Refer the latter to Planning for setbacks.

Forms and filing links

Official project guidance
Build a shed, garage or accessory structure

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Use the accessory-building information sheet and prepare engineered structure plans for the proposed detached building.

Zoning and site review

Provide the site plan and distances to the property lines. Check the parcel’s flood zone and the building’s intended use with Planning.

Forms and filing links

Official project guidance
Repair flood or storm damage

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

For work subject to substantial-improvement review, send the signed owner and contractor affidavits, executed contract and itemized costs with the building application.

Zoning and site review

Confirm the mapped zone for the structure. Taylor publishes separate AE and VE instructions for work that must meet flood construction requirements.

Forms and filing links

Official project guidance
Place or replace a manufactured home

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Use the county’s mobile-home permitting packet for the installation and identify the installer when applying through Building & Planning.

Zoning and site review

Start with the parcel compliance statement and verified address. Check available sewer service in Steinhatchee and the beaches, or arrange onsite sewage review where applicable.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Building permit

Give Building and Planning Department the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Building and Planning Department to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.

Who handles this address?

Filing instructions

Start with the county’s compliance statement and aerial

Ask Building & Planning for a compliance statement, property printout and aerial map before arranging septic review. Staff use the parcel to establish its address, flood zone and setbacks. These documents also help determine which utility letter belongs in the application.

  1. Take the compliance statement and aerial map to the septic permitting office if the site is on septic. For parcels served by Big Bend Water Authority in Steinhatchee or Taylor Coastal Water and Sewer District at the beaches, obtain a letter confirming sewer service.
  2. For an AE or VE site, the county’s process sheet calls for a benchmark survey before permitting and an elevation certificate before final inspection. Arrange for the surveyor early.
  3. Use the residential packet for scaled construction drawings and applicable signed forms, including the driveway and water-source statements. Access from a county right-of-way requires a driveway permit. For an accessory building, the county has a shorter form that specifically requests a site plan, setbacks and engineered structure plans. Use the Apply for a Permit button on the Building & Planning page to open the county’s iWorQ portal.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Building and Planning Department

Phone
850-838-3500 ext. 1
Email or contact form
[email protected]
Office address
201 East Green Street, Perry, FL 32347
Office hours
Check the official site
Official department website

Planning and zoning

Building and Planning Department

Phone
850-838-3500 ext. 1
Email or contact form
[email protected]
Office address
201 East Green Street, Perry, FL 32347
Office hours
Check the official site
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

For a dock or seawall, gather agency record numbers first

Taylor County has a Marine Permit Application Worksheet for docks, seawalls and boathouses. It asks for a scaled site plan showing property-line setbacks and, for work in a canal, canal width and how much of that width the work would occupy. It also asks for applicable state, water management or federal permit or exemption numbers. Bring any existing authorizations and verify which ones cover the proposed work.

Read the official guidance

Start with the county’s compliance step

The county building permit guide directs applicants to gather parcel information and check land-use, setbacks and flood status for the compliance statement. Bring a survey if the county checklist calls for one, including its listed AE and VE cases.

Identify sewer or septic before finalizing a site plan

The county guide calls for sewer availability documentation in areas served by Big Bend Water Authority or the Taylor Coastal Water and Sewer District. For other parcels, confirm the applicable sewer or septic route instead of assuming service availability.

Identify which road the driveway meets

The permit guide lists driveway permitting in the intake sequence. Mark the existing or proposed access point and confirm whether it connects to a county, city or state road.

Before you submit

  • Parcel number, survey and proposed limits of work
  • Utility service letter or septic information
  • Road name and driveway location