City and county jurisdiction
Start with Taylor County Building and Planning for a project outside city limits. Confirm whether a Perry address is inside the City of Perry and which office handles the required approvals.
Who handles this address?
Filing instructions
Start with the county’s compliance statement and aerial
Ask Building & Planning for a compliance statement, property printout and aerial map before arranging septic review. Staff use the parcel to establish its address, flood zone and setbacks. These documents also help determine which utility letter belongs in the application.
- Take the compliance statement and aerial map to the septic permitting office if the site is on septic. For parcels served by Big Bend Water Authority in Steinhatchee or Taylor Coastal Water and Sewer District at the beaches, obtain a letter confirming sewer service.
- For an AE or VE site, the county’s process sheet calls for a benchmark survey before permitting and an elevation certificate before final inspection. Arrange for the surveyor early.
- Use the residential packet for scaled construction drawings and applicable signed forms, including the driveway and water-source statements. Access from a county right-of-way requires a driveway permit. For an accessory building, the county has a shorter form that specifically requests a site plan, setbacks and engineered structure plans. Use the Apply for a Permit button on the Building & Planning page to open the county’s iWorQ portal.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- VE-zone construction and elevation requirements (PDF)cms6.revize.com
For a coastal parcel mapped VE, use the county instructions when preparing foundation, breakaway-wall and mechanical-equipment details and arranging elevation documentation.
Official source - AE-zone construction and elevation requirements (PDF)cms6.revize.com
On an AE parcel, use the county’s guidance to plan the survey, enclosed space below the elevated floor and flood openings.
Official source
Building and zoning contacts
Building permits
Building and Planning Department
- Phone
- 850-838-3500 ext. 1
- Email or contact form
- [email protected]
- Office address
- 201 East Green Street, Perry, FL 32347
- Office hours
- Check the official site
Planning and zoning
Building and Planning Department
- Phone
- 850-838-3500 ext. 1
- Email or contact form
- [email protected]
- Office address
- 201 East Green Street, Perry, FL 32347
- Office hours
- Check the official site
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
For a dock or seawall, gather agency record numbers first
Taylor County has a Marine Permit Application Worksheet for docks, seawalls and boathouses. It asks for a scaled site plan showing property-line setbacks and, for work in a canal, canal width and how much of that width the work would occupy. It also asks for applicable state, water management or federal permit or exemption numbers. Bring any existing authorizations and verify which ones cover the proposed work.
Read the official guidanceStart with the county’s compliance step
The county building permit guide directs applicants to gather parcel information and check land-use, setbacks and flood status for the compliance statement. Bring a survey if the county checklist calls for one, including its listed AE and VE cases.
Identify sewer or septic before finalizing a site plan
The county guide calls for sewer availability documentation in areas served by Big Bend Water Authority or the Taylor Coastal Water and Sewer District. For other parcels, confirm the applicable sewer or septic route instead of assuming service availability.
Identify which road the driveway meets
The permit guide lists driveway permitting in the intake sequence. Mark the existing or proposed access point and confirm whether it connects to a county, city or state road.
Before you submit
- Parcel number, survey and proposed limits of work
- Utility service letter or septic information
- Road name and driveway location