Union County Permits: Zoning Clearance and Flood Documents

Before drawing a home or addition in Union County, identify which office clears the use, then collect the parcel and flood records that go with the building application. A Lake Butler postal address can be outside the city.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Union County.

Build a new house

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Use the house packet with the survey, legal description, 911 address and assessment paperwork. Supply proof of a septic application where needed or the Lake Butler tap-in receipt.

Zoning and site review

Get the compliance and flood-data letter from County Building for unincorporated sites or from Lake Butler, Raiford or Worthington Springs in town. Check the culvert permit or exemption.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

For a house addition, use the residential house/addition packet in Cloudpermit and identify the added area and affected trades. Ask Building which documents apply to an interior alteration.

Zoning and site review

For an addition, place the new footprint on the survey and obtain the compliance letter from the county or the municipality serving the site.

Forms and filing links

Official project guidance
Replace or recover an existing roof

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

The owner or roofing contractor completes the roofing application. Mark reroof or roof-over and metal or shingles, and enter the parcel, 911 address and estimated cost.

Zoning and site review

Identify the building at the existing address. Include any new roofed addition in the residential addition review so its setbacks can be checked.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Use the pool packet in Cloudpermit. It includes the safety acknowledgment and calls for drawings, a Health Department letter and a recorded Notice of Commencement.

Zoning and site review

Obtain the county or town compliance letter. Show the pool setbacks, other buildings, well and septic on the site plan.

Forms and filing links

Official project guidance
Electrical, plumbing or mechanical work

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Use the dedicated electrical application for wiring or service. For mechanical or plumbing work, choose the matching box on the county’s combined form and file through Cloudpermit.

Zoning and site review

Identify the parcel and location of the installation. If the work serves a new home, cross-reference the building permit and its approved site layout.

Forms and filing links

Official project guidance
Place or replace a manufactured home

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Use the mobile-home packet, obtain a 911 address, and gather the survey, legal description and special-assessment documentation.

Zoning and site review

Get the compliance and flood-data letter for the site. Identify the road authority for a culvert permit or exemption and the provider for water and wastewater.

Forms and filing links

Official project guidance
Commercial construction or a change of use

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Use the commercial building application and its checklist for site access, utility documents and construction drawings.

Zoning and site review

Confirm the applicable town compliance letter or county review. For Lake Butler utilities, include the sewer and water tap-in receipt requested in the packet.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Building permit

Give Building Department the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Planning and Development to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

For a house or addition, the compliance and flood-data letter comes from Union County Building for an unincorporated parcel. The Town of Raiford, City of Lake Butler or Town of Worthington Springs supplies the letter for land inside its boundaries.

Who handles this address?

Filing instructions

Get the compliance letter from the right office

The source of a compliance and flood-data letter depends on the parcel. Union County Building supplies it for unincorporated land. For sites inside Lake Butler, Raiford or Worthington Springs, obtain it from the municipality.

  1. Gather the survey and legal description, 911 address, owner’s special-assessment certification and proof of assessment payment from the Tax Collector. A recent purchase needs the recorded deed. A newly split lot needs its own parcel number.
  2. For a single-family home requiring septic, submit proof of the septic application when applying for the building or plumbing permit. Final system approval comes before occupancy. For Lake Butler utility service, include the sewer and water tap-in receipt. Obtain the culvert permit or an exemption letter from the county or FDOT according to who maintains the road.
  3. Use the house/addition packet to check the drawings and subcontractor verification. An owner acting as contractor must complete the disclosure with Building. Cloudpermit accepts the application, changes and inspection requests.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Building Department

Email or contact form
Check the official site
Office address
15 NE 1st Street, Lake Butler, FL 32054
Office hours
Check the official site
Official department website

Planning and zoning

Planning and Development

Email or contact form
Check the official site
Office address
15 NE 1st Street, Lake Butler, FL 32054
Office hours
Check the official site
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Clear the special-assessment paperwork before requesting issuance

Union County’s Residential Home Building or Addition application lists proof of payment of special assessment tax from the Tax Collection Office alongside its other intake documents. Ask that office what parcel-specific proof is available and confirm with the Building Department what it needs for the proposed scope. A property tax bill or an online application number should not be treated as a substitute for the listed documentation.

Read the official guidance

Get the right zoning clearance before uploading

The county’s house application distinguishes county and municipal zoning clearance. Have the parcel number, owner information and proposed footprint ready for the applicable office.

Know what to bring for a mapped flood site

The county’s residential packet asks for additional flood information where applicable, including base flood elevation and flood elevation certification. Confirm what is needed for your specific scope before relying on a general map screenshot.

Keep permit and inspection records in one place

Union County directs applicants to Cloudpermit. Use the existing record for changes, status checks and inspection requests rather than starting a second application.

Before you submit

  • Parcel ID and written zoning clearance if applicable
  • Residential permit checklist and scaled site information
  • Flood elevation documents when the county requires them

Additional official references