City and county jurisdiction
The Volusia County Permit and Zoning Center handles permits in unincorporated Volusia County. If the site is in a city, confirm the municipal permit route and do not assume that removes county impact-fee review.
Who handles this address?
Filing instructions
Complete the local review before the building review
For county projects subject to Volusia’s two-step review, the first filing checks local development rules. Wait for pre-application approval and the notice to provide the second-stage building documents. The two county forms serve different purposes.
- Open Connect Live and select Permits, then Apply or Application Wizard. Choose the scope and locate the property by address or parcel number. The required pre-application attachments depend on the work type.
- Show boundary dimensions, bordering streets and access, drainage, utility and environmental easements on the plot plan. For a residential accessory structure, addition or alteration, the county directs applicants to its Addition / Alteration application.
- If tree or wetland work is independent of a building project, use the Environmental Permit option. For a two-step building application, follow the notice after Step 1 to provide the Step 2 application and building review documents.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- Substantial improvement and damage assessment packet (PDF)volusia.org
For repairs, improvements or additions to an existing building subject to flood review, use the county packet to itemize the proposed work and document building value for the county determination.
Official source - Affidavit of drainage control (PDF)volusia.org
For residential or minor commercial projects using this affidavit, the owner certifies how drainage systems, neighboring properties and roadside swales will be protected.
Official source - Roof deck, underlayment and flashing affidavit (PDF)volusia.org
For roofing work requiring this inspection record, identify the permit and have the inspecting professional certify the components covered by the affidavit.
Official source - FEMA Elevation Certificate (PDF)fema.gov
For parcels the county identifies in or bordering a high flood hazard area, arrange the preconstruction and as-built survey submissions. The county calls for acceptance of the final elevation certificate before scheduling final inspection.
Official source
Building and zoning contacts
Building permits
Permit Center
- Phone
- 386-736-5929
- Email or contact form
- [email protected]
- Office address
- 123 W. Indiana Ave., Room 203, DeLand, FL 32720
- Office hours
- Mon–Fri 8 a.m.–5 p.m. Last sign-in at 4:30 p.m.
Planning and zoning
Planning and Development
- Phone
- 386-943-7059
- Email or contact form
- [email protected]
- Office address
- 123 W. Indiana Ave., DeLand, FL 32720
- Office hours
- Mon–Fri 8 a.m.–5 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Put construction-related tree removal on the project application
If tree removal is part of a Volusia County building permit, nonresidential development or subdivision, Environmental Management says a separate tree permit application is not needed when the removal is reviewed with that project. That does not mean the trees can be removed before review. Identify what you intend to remove before you submit, and confirm the stand-alone tree route if clearing is happening ahead of a construction application.
Read the official guidanceCheck fees on additions and use changes
Volusia County publishes impact-fee guidance for qualifying residential and commercial development, including work inside cities. For a commercial addition or a change of use, keep the prior use, proposed use and floor areas available to the reviewer.
Check the beach and dune approval path
County Environmental Management publishes a separate beach and dune permit path. If work reaches a beach or dune area, confirm the applicable limits and approvals before treating the project as a standard building submittal.
Show both the existing and proposed site layout
Volusia’s planning guidance calls for a site plan to evaluate setbacks. Show property lines, existing structures and the proposed work on a single legible drawing so the reviewer can distinguish what is changing.
Before you submit
- Address, parcel and issuing jurisdiction
- Existing and proposed use and floor area
- Survey and beachfront work limits if relevant