City and county jurisdiction
Confirm whether the exact parcel is in unincorporated Walton County or within a city such as Freeport or DeFuniak Springs. A city name in the mailing address or the county office’s location is not proof of jurisdiction.
Who handles this address?
Filing instructions
Get a planning-approved site plan for the building set
Walton’s building checklist calls for a planning-approved site plan and its review sheet or approval letter. The checklist names separate planning contacts for DeFuniak Springs, Freeport and Paxton. Establish which office signs off on the parcel before assembling the building set.
- Attach the county checklist to the plan submission. Include the parcel number, recorded deed and the applicable septic application or water/sewer availability letter from the provider serving the address.
- Have the designer include Walton’s wind-load statement. Review the coastal construction and flood-zone items and check which fire district supplies any required impact-fee receipt.
- For commercial work or multifamily buildings with three or more units, check the development-order requirement. For a commercial remodel, ask Planning for its land-use compliance documentation. File current county applications through EnerGov Civic Access.
Permit applications and filing portals
Filing resources reviewed .
Supporting documents for your project
- NFIP V-zone certificate for a structure (PDF)mywaltonfl.gov
For a structure in a V or Coastal A zone, the engineer or architect documents the foundation design and completes the breakaway-element certification when those elements are proposed.
Official source - NFIP V-zone certificate for a pool or spa (PDF)mywaltonfl.gov
For a pool or spa in a V or Coastal A zone, the engineer or architect uses this separate form to document flood loads, scour and foundation anchorage.
Official source - Nonconversion agreement for an enclosure (PDF)mywaltonfl.gov
Where the county requires an agreement for an enclosure below the design flood elevation, the owner signs the permitted-use restrictions tied to the permit.
Official source - No-rise certification (PDF)mywaltonfl.gov
For proposed encroachment in a regulatory floodway, have the engineer confirm which hydraulic analysis and no-rise certification the floodplain reviewer requires.
Official source - FEMA Elevation Certificate (PDF)mywaltonfl.gov
Use the county-listed elevation form for the survey documentation requested on a floodplain project. Check the required construction stage before scheduling the survey.
Official source
Building and zoning contacts
Building permits
Building Division
- Phone
- 850-892-8160
- Email or contact form
- [email protected]
- Office address
- 117 E. Sloss Ave., DeFuniak Springs, FL 32433
- Office hours
- Mon–Fri 8 a.m.–4:30 p.m.
Planning and zoning
Planning and Development Services
- Phone
- 850-267-1955
- Email or contact form
- [email protected]
- Office address
- 842 State Highway 20 East, Unit 110, Freeport, FL 32439
- Office hours
- Mon–Fri 8 a.m.–4:30 p.m.
Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.
Plan for stormwater closeout before covering the work
If your single-family project needs a Walton County stormwater system, show where it goes and how water moves on the site drawing. The county’s homeowner guidance also lists a post-construction certification form and photos of all sides of the house. Put those items in the builder’s closeout plan so there is a record of what was installed rather than trying to recreate it after landscaping.
Read the official guidanceCheck planning and floodplain steps ahead of building review
Walton County lists Planning and Floodplain staff in its building permit review process. For development in a Special Flood Hazard Area, confirm the applicable county floodplain development approval and sequencing before you start work.
Verify clearing and dune lake constraints before mobilizing
Planning and Development publishes separate guidance on land clearing, stormwater and coastal dune lakes. Mark proposed clearing, grading and drainage on the survey before asking which rules apply to the parcel.
File planning and building records in the correct portal areas
Walton County uses EnerGov for planning submittals. Its guidance separates planning records from building permits, so confirm both record numbers if the project needs both tracks.
Before you submit
- Survey showing water features and proposed disturbance
- Parcel zoning and flood information
- Separate planning and building permit numbers if applicable