Washington County Land-Use Certificates and Site Access

For a home, manufactured home or other new structure on a Washington County lot, verify the proposed use and driveway before booking construction. The county’s land-use application can help identify which supporting documents to gather before filing for a building permit.

What type of project are you planning?

Choose your scope to see the permit path, zoning checks and forms for Washington County.

Build a new house

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Start with a land-use certificate and E-911 address. Once the parcel approvals are in hand, registered applicants can email the residential building application to Building.

Zoning and site review

Attach the deed and site plan. Mark the proposed driveway entrance with the county flag. Check municipal letters for a site in Vernon, Wausau, Ebro or Caryville and use Chipley’s planning office within its limits.

Forms and filing links

Official project guidance
Remodel or add to an existing building

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Use the county building form and mark Addition or Alter/Repair. State the intended occupancy, construction value, square footage and work description, and identify any separately permitted trade work.

Zoning and site review

For an addition, show the changed footprint on the land-use application and attach the deed and site map. Tell Building if the project changes the occupancy.

Forms and filing links

Official project guidance
Replace or repair a roof

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Complete the roof section of the trade permit application. Mark replacement, roof-over or new build, and enter the covering, area, job cost and Florida product approval code. The inspection affidavit asks for photographs of each roof plane with the permit number or address visible.

Zoning and site review

Identify the structure and parcel at intake. If the work creates additional covered area, include the revised footprint in the land-use review for the addition.

Forms and filing links

Official project guidance
Build a shed, garage or accessory structure

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

For a storage building, pole barn, garage or carport, choose the matching category on the building application and give the parcel ID, size and intended use.

Zoning and site review

Select Accessory on the land-use application and mark new, addition or replacement. Provide a site map and deed to the correct planning office.

Forms and filing links

Official project guidance
Install a pool or spa

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

The county building form identifies swimming pools and calls for a separate pool permit. Identify the pool’s size and location when requesting the permit record from Building.

Zoning and site review

Select Swimming Pool on the land-use certificate and include the site map and deed for planning review.

Forms and filing links

Official project guidance
Electrical, plumbing or mechanical work

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Use the county trade permit application, complete the section for the installed system and provide the contractor and job information. Registered applicants can email Building.

Zoning and site review

For new utility service to a vacant parcel, check the Utility category on the land-use form and county road-access requirements before requesting power.

Forms and filing links

Official project guidance
Build a driveway or install utilities in a county right-of-way

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

For a new entrance on a county-maintained road, submit the Public Works driveway application. For utility construction affecting county right-of-way, use its separate utility application.

Zoning and site review

Identify road ownership before applying. State-highway driveways go to FDOT. Coordinate a new homesite entrance with Planning and E-911 addressing.

Forms and filing links

Official project guidance
Place or replace a manufactured home

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Select Mobile Home on the land-use certificate. Get the E-911 address before contacting Building about the installation permit and installer documents.

Zoning and site review

Show the placement and driveway on the site plan. Include any municipal approvals and arrange a county-road or state-highway access permit with the appropriate agency.

Forms and filing links

Official project guidance
Commercial construction or a change of use

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Select commercial occupancy and identify the business, proposed site use and construction scope. Put additions or changes in occupancy on the building application.

Zoning and site review

Select commercial use on the land-use certificate and check the municipality serving the address before requesting the county building permit.

Forms and filing links

Official project guidance
Another project or a mix of project types

Where to file

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Building permit

Give Building Department the parcel address, current use and a description of each part of the work. Ask which permit types and separate trade applications the reviewing office will accept for that scope.

Zoning and site review

Ask Planning Department to check the proposed use and any change to the footprint, setbacks or access. Include a sketch showing where the work sits on the parcel.

Offices to contact

Official project guidance

City and county jurisdiction

County Planning lists services for unincorporated Washington County and Caryville, Ebro, Vernon and Wausau. A Chipley postal address may be inside the city or outside it, so verify city limits and the correct building and planning authorities.

Who handles this address?

Filing instructions

Pair the land-use application with E-911 addressing

Start a new, manufactured or modular home with Planning and E-911 addressing. The county requires land-use approval and a valid address before Building can process the permit. Site access may require a third application.

  1. Submit the land-use certificate application with a recorded deed and site plan. Apply for E-911 addressing and place the county’s yellow flag at the proposed driveway so staff can locate the entrance.
  2. Confirm municipal documentation. Chipley handles its own land-use compliance. In Vernon, attach confirmation of water and sewer availability. Wausau, Ebro and Caryville each require a town letter for new development in their limits.
  3. Apply to Public Works for a new driveway on a county-maintained road. For a state highway, contact FDOT. Once the prerequisites are in hand, registered applicants can email Building. Other applicants should bring the permit paperwork to the office.

Permit applications and filing portals

Filing resources reviewed .

Supporting documents for your project

Building and zoning contacts

Building permits

Building Department

Email or contact form
[email protected]
Office address
1331 South Boulevard, Chipley, FL 32428
Office hours
Mon–Fri 8 a.m.–4 p.m.
Official department website

Planning and zoning

Planning Department

Email or contact form
Check the official site
Office address
1331 South Boulevard, Chipley, FL 32428
Office hours
Check the official site
Official department website

Official sources checked Nov. 27, 2026. Confirm which office serves your address and whether appointments or separate permit intake hours apply.

Replacing a home? Verify the county’s seven-year fee treatment

When comparing the budget for a vacant parcel with a site that had a home, ask Washington County Building about replacement treatment. The county’s published guidance describes a seven-year window and says there is currently no impact fee for a qualifying replacement. Bring the old permit or removal records and ask what dates and documentation the county will use. A former driveway or utility connection is not proof of eligibility.

Read the official guidance

Confirm whether a land-use certificate comes first

The county’s land-use certificate packet identifies documents such as the recorded deed and site plan. Show the proposed use, address or parcel, and physical placement before submitting for the associated building permit.

Check who controls access and who assigns the address

Washington County has a separate E-911 addressing office. Check address status for a new site and confirm which road authority reviews the new or changed driveway.

Check the wastewater approval path

The land-use packet identifies Florida DEP onsite sewage approval where applicable. Verify sewer availability or the proposed septic location before placing a building or its access road.

Before you submit

  • Recorded deed and parcel number
  • Site plan with access and proposed structures
  • E-911 address and water or wastewater approval status

Additional official references