Quick Answer
The Citrus County Building Division in Lecanto processes new county building permits through Accela. Inside Crystal River or Inverness city limits, apply with the city. Check your lot in GIS Address Lookup before paying the county.
For permits and inspections in unincorporated Citrus County, reach the Citrus County Building Division at (352) 527-5310. The office is at 3600 W. Sovereign Path, Suite 111, Lecanto, FL 34461. Staff answer the phone from 8:00 a.m. to 4:00 p.m. The permit counter opens at 9:00 a.m. and closes at 4:00 p.m., Monday through Friday. For a written answer, email [email protected]. Office hours and portal details checked November 23, 2026.
Where Can I Verify the Official Requirements?
- Contact the Citrus County Building Division in Lecanto
- Open Citrus County Accela to apply or search permits
- Citrus County GIS Address Lookup
- Download Citrus County residential permit forms
- Inverness instructions for reading the parcel jurisdiction
- City of Crystal River building permit application and phone extensions
- City of Inverness Community Development permit services
- Citrus County CIVICS permitting system notice
- Citrus County permit record types
- Citrus County building permit application and owner-builder instructions
- Citrus County Building Division fee schedule
- Citrus County non-residential permitting process
- Citrus County inspection scheduling and closeout
- Citrus County Floodplain Management
- Citrus County flood maps and coastal zone definitions
- FEMA Flood Insurance Study for Citrus County and incorporated areas
- FEMA final flood hazard determinations for Citrus County
- Citrus County Community Rating System classification
- Citrus County Land Development Code, Use Standards
- Citrus County substantial improvement and damage guidance
- Florida Building Commission 8th Edition effective date
- Florida Building Commission milestones and 9th Edition effective date
- Florida Building Commission interpretation on HVHZ boundaries
- Citrus County product approval guidance
- Citrus County Building Division frequently asked questions
- Citrus County Extension Request Form
Which office serves your parcel?
Enter the street address in Citrus County GIS Address Lookup and choose the matching suggestion.
If several lots share that address, select yours in the Lot menu. Read the jurisdiction line in the property summary. County fees are nonrefundable for filings inside either city.
For Crystal River, the city’s building permit application lists (352) 795-4216, extension 316 or 317.
For Inverness, contact Community Development at (352) 726-3401. For county applications, note the parcel ID and alternate key. On vacant property, check with the Building Division before removing trees. The county requires an approved building permit for that work.
Sources: [3] Citrus County GIS Address Lookup; [5] Inverness instructions for reading the parcel jurisdiction; [4] Download Citrus County residential permit forms; [6] City of Crystal River building permit application and phone extensions; [7] City of Inverness Community Development permit services; [11] Citrus County Building Division fee schedule; [10] Citrus County building permit application and owner-builder instructions; [1] Contact the Citrus County Building Division in Lecanto
How to file a county building permit in Accela
Download the Building Permit Application from Citrus County’s Residential Permitting page.
Enter the job value and proposed square footage. A homeowner acting as an owner-builder must complete the application and Owner Builder Disclosure in person at the Lecanto office. Ask the division about owner-builder eligibility.
Register in Citrus County Accela to file online. Applicants whose records are protected under Florida Statutes Chapter 119 should contact Building and Development Services directly to begin.
Contractors register their license, and each subcontractor named on the application must sign on in Accela. The division calls for a digital signature from a certificate authority on submitted plans. To update contractor insurance, a county business tax record or a professional license, submit an insurance amendment in Accela. Emailing the licensing office updates only the old system.
Use the county’s Permit Record Types list to match the job to the application.
A like-for-like window fits Door & Window Replacement. Enlarging the opening calls for Residential Alteration. For a dock or boat lift, select Waterfront Structure. For a commercial site plan, select Planning, then Building Site Plan.
The residential forms library also has the Subcontractor Form, Product Approval Form and an application for temporary electric service.
Accela asks for that last form if the job will use a T-pole, TUG meter or pre-power. Septic and well applications go to Florida Health Citrus County. The county’s Accela tutorials cover permit status, review comments and the permit placard.
Sources: [1] Contact the Citrus County Building Division in Lecanto; [2] Open Citrus County Accela to apply or search permits; [4] Download Citrus County residential permit forms; [9] Citrus County permit record types; [10] Citrus County building permit application and owner-builder instructions; [25] Citrus County Building Division frequently asked questions
What will the county charge?
The nonrefundable application fee is $50.00, payable when you file.
Citrus County credits it when the permit is issued. The schedule lists $75.00 for window, door or skylight replacement. If the project is an alteration or remodel, the building trade fee depends on job value and starts at $125.00.
For waterfront work, the schedule lists $85.00 for a boat lift including electrical and $125.00 for a dock. Ask for an itemized estimate if you plan both. State surcharges also apply.
Sources: [11] Citrus County Building Division fee schedule; [9] Citrus County permit record types
When will a plans examiner respond?
For a new business or an addition to an existing one, call the Lecanto office and ask for Commercial Permitting.
The Non-Residential Review Coordinator can arrange a pre-application meeting. Review the Non-Residential Application Checklist with the coordinator.
At commercial intake, staff contact the applicant within three business days if information is missing.
A complete application goes to plan review. At that stage, staff give notice within seven business days if the building or site plans need corrections. For current residential review times, ask Lecanto staff about your Accela record.
Sources: [12] Citrus County non-residential permitting process; [1] Contact the Citrus County Building Division in Lecanto
How to schedule or cancel a Citrus County inspection
Request the inspection in Accela by 3:30 p.m. the day before for next-day scheduling.
Inspectors work weekdays, excluding holidays. If the county cannot complete the visit on the requested day, it carries the inspection over to the next business day. Unpaid fees or a missing subcontractor sign-on can block the request.
Have the approved plans and required documents at the site and give the inspector access to the work.
To cancel, email [email protected] with CANCEL INSPECTION in the subject line. The message must arrive by 9:00 a.m. on the inspection day. For commercial closeout, contact the Building Division to schedule final occupancy and compliance inspections. The division issues the certificates after the required inspections pass and the outstanding fees are paid.
Sources: [13] Citrus County inspection scheduling and closeout; [12] Citrus County non-residential permitting process; [1] Contact the Citrus County Building Division in Lecanto
Flood maps and coastal setbacks
Locate the proposed building in the Flood Hazard Layer of Citrus County GIS.
The first countywide flood maps took effect September 26, 2014. A revision effective January 15, 2021 includes unincorporated Citrus County. Floodplain Management can help identify the zone, locate elevation certificate information or research a map amendment. The county lists its Community Rating System standing as Class 5.
On the county map, the part of Zone AE seaward of the Limit of Moderate Wave Action is a Coastal A Zone.
For buildings and structures there or in a Velocity Zone, Citrus County Land Development Code § 3520(A) points to the setbacks in § 2300 and calls for a survey meeting Florida Department of Environmental Protection requirements. For an addition or damage repair, email [email protected] to ask which substantial improvement or damage packet applies.
Sources: [14] Citrus County Floodplain Management; [15] Citrus County flood maps and coastal zone definitions; [16] FEMA Flood Insurance Study for Citrus County and incorporated areas; [17] FEMA final flood hazard determinations for Citrus County; [18] Citrus County Community Rating System classification; [19] Citrus County Land Development Code, Use Standards; [20] Citrus County substantial improvement and damage guidance
Preparing drawings for a window alteration
For a wider window, give Pineland Engineering the existing and proposed opening dimensions for the Residential Alteration application.
Pineland can detail the altered wall and show the design pressure for the opening. Before ordering, compare the product rating with that pressure. Citrus County’s product approval guidance calls for the supplier’s installation details and pressure certification to be posted at the job site for inspection.
Sources: [9] Citrus County permit record types; [24] Citrus County product approval guidance
Free Florida Engineering Tools
Related Resources
What Do People Ask About Citrus County Building Division?
How do I look up a Citrus County permit by address?
In GIS Address Lookup, select the address and lot, then read the Building Permits table for application numbers, issue dates and status. In Accela, select Building and then Search Applications. To view a permit held in the older Infor system, use the Infor link on the Building Division page. For a formal open records check, the division directs applicants to Orange Data and lists a $50 fee per address.
Which small home projects qualify for a Citrus County permit exemption?
For a single-family home, the county accepts requests for a single project valued under $7,500. Projects involving gas, plumbing, electrical, mechanical or structural work are ineligible. Even a flood hazard area covering just a corner of the parcel disqualifies it. You cannot split the job to meet the limit. Choose Building Permit Exemption Request in Accela and submit the notarized county form with a contract or other evidence of the work and its value.
Can I request a permit exemption for temporary flood barriers in Citrus County?
Citrus County has a separate request for voluntary temporary flood protection outside a Special Flood Hazard Area. The barrier must be non-load-bearing and non-habitable, protect against floodwater or storm surge, and be on single-family, two-family or townhouse property. The installer must hold a license under Part I of Florida Statutes Chapter 489. Local zoning, drainage, easement and setback rules still apply. File the notarized exemption request and supporting documents in Accela.
Is a small prefab shed exempt from a Citrus County permit?
The county’s permit guide lists prefab sheds under Accessory Structures and gives no size cutoff for an exemption. Give Lecanto staff the parcel ID, dimensions and proposed location before ordering. If a site plan is needed, the division asks for a scale drawing showing the existing structures as well as the proposed shed.
How long is a Citrus County building permit valid?
For a county-issued single-family dwelling permit, compare its first anniversary with the day the next Florida Building Code edition takes effect. The later date is the expiration date. The county can grant an extension. The county’s Extension Request Form directs applicants to email [email protected] at least seven days before the permit expires. Check Permit Application or Issued Permit on the form.
What building code does Citrus County use?
Citrus County applies its Land Development Code alongside the Florida Building Code. For current applications, Lecanto staff use the 8th Edition (2023), in effect since December 31, 2023. The switch to the 9th Edition (2026) comes on December 31, 2026. Under the code, only Broward and Miami-Dade fall within the High Velocity Hurricane Zone, so Citrus is outside it.
Florida-Licensed · Bilingual EN/ES
Ready to Start Your Project?
Pineland Engineering — Designda Inc. — serves residential and commercial clients statewide. PO Box 417, Pineland, FL 33945.